Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

New and used 2025 Subaru Outback Onyx Edition for sale near Clifton Heights, PA

Filters 5 Year Trim Model Price & payment Make Mileage Ext. color All filters
36 matches 30 miles from 19018
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Magnetite Gray Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251464
VIN: 4S4BTALC8S3289802

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Glanzmann Subaru review

I'll be back, as No comparison out here or in the

Retire to Delaware1year ago,no1 can compete with the team and service, can't wait to get back to get another CPO CAR as my7year just expired &not 1 problem with 132thous miles.Subaru very good 2me,Subaru for Life, THANKS Also own a2011Forrester,running like new 11years&still gets up&goes, never any big issues. THANKS AGAIN SUBARU 4LIFE

2025 Subaru Outback Onyx Edition review

This is our third Outback.

This is our third Outback. Seats could be better. Sit in a VW or Volvo and you'll see how they could be improved. Window buttons should located in a place where a dog can't stem on them. They moved the heated seat buttons. Our dog no longer steps on those.

Vehicle information

Ext. color: Crystal Black Silica
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: 250722-E
VIN: 4S4BTALC3S3315450

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats

Reviews

ReedmanToll Auto World review

Matt Boyle was an excellent sales person.

Matt Boyle was an excellent sales person. Veey informative and accommodating . I already told my friend about your service. Hopefully she?ll reach out to you. 100% satisfaction?

2025 Subaru Outback Onyx Edition review

We replaced our 2015 Outback with a 2025 Outback Limited.

We replaced our 2015 Outback with a 2025 Outback Limited. Decided to stay with Subaru as we had good reliability in the 125,000 miles on the 2015. Normal maintenance, only 3 minor warranty issues early. The new car is one model trim higher than the previous one. The only real complaint would be the "auto engine shutoff," but that is easily turned off. I prefer the built-in look of the center display versus the tacked-on tablet on top of the dash. We had hoped to wait and see the new 2026 model but from the photos at the NY auto show debut I was not a fan of some of the changes. I should note we also have a 2021 Ascent Limited which we enjoy traveling with.

Vehicle information

Ext. color: Ice Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Variable
Engine: Regular Unleaded H-4 2.5 L/152
Stock #: 20211
VIN: 4S4BTALC9S3302606

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate
Entertainment: Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Stability Control

Reviews

Piazza Subaru of Limerick review

2018 Outback

Very reliable, helpful and good service. I just recommended Piazza of Limerick to a friend yesterday and she ran over and bought a new Subura Accent. I think that proves that I am happy with Piazza of Limerick.

2025 Subaru Outback Onyx Edition review

This is my 4th Outback, so that in and of itself should

This is my 4th Outback, so that in and of itself should say something. This is a 2025 Outback Touring XT with the turbo charged 2.4 liter motor and CVT transmission. I love this car, one of what I consider to be one of the last true wagons. Plenty of room, soft ride and safe. Subaru’s safety and reliability are the main reason I keep buying them. Mileage is pretty good considering the AWD and turbo charger. Plenty of pep. I’m averaging about 25-26 in mixed rural driving. Previous one got about 31 mpg on the highway. I’m not heavy footed so that helps. Substantial leg room in the rear seat. This model has all the bells and whistles as it’s their top of the line model. Plenty of room behind rear seat also for luggage and groceries. To me it’s just as comfortable as higher end cars at a substantially lower price point. At $45,000 MSRP can’t really go wrong in my opinion. My only complaint if you will is that it lacks a 360 degree camera and the infotainment center lags a bit on start up. Neither of these are a deal breaker for me

Vehicle information

Ext. color: Crystal Black Silica
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S3309990
VIN: 4S4BTALC5S3309990

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Ciocca Subaru of Philadelphia review

Ben and the team were great.

Ben and the team were great. Was a very busy Saturday, but they kept things moving. Very pleased with the experience.

2025 Subaru Outback Onyx Edition review

Great performance from the 2.

Great performance from the 2.4 liter Turbo, great handling. Seats are very comfortable and supportive, dash layout is great and the 11.6" display has all the information that you need.

Vehicle information

Ext. color: Ice Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251400
VIN: 4S4BTALC6S3285912

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Glanzmann Subaru review

Very satisfied with the customer service provided.

On Friday, January 6th my Outback was serviced. The service advisor was Kyle Jordan. Kyle provided an excellent assessment of the service needed, communicated those needs clearly, as well as accurate timelines for service completion. Kyle was able to provide a loaner vehicle for my use which enabled me to carry out my day's activities. Overall, I was very satisfied with the technical services and especially the customer service provided by Kyle. Dan Ruggieri

2025 Subaru Outback Onyx Edition review

Our Outback Touring is a plush do everything.

Our Outback Touring is a plush do everything. The satin black silica puts in a whole higher looking class. The interior is simply stunning and beautiful. With complete leather heated and cooled seats front and back seats. Voice commands etc. All for a very reasonable cost. Just unbelievable!!

Vehicle information

Ext. color: Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251744
VIN: 4S4BTALC8S3286530

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Concordville Subaru review

Angelo was a great listener, patient and worked for me as

Angelo was a great listener, patient and worked for me as his customer getting me a fantastic deal. He went above and beyond to help me every step of the way.

Vehicle information

Ext. color: Ice Silver
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: 315532
VIN: 4S4BTALC5S3315532

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Reedman-Toll Subaru of Exton review

Great car buying experience

First, let me say that I don’t necessarily enjoy reading long online reviews when considering a major purchase, but I really can’t explain my experiences at Reedman Toll Subaru in one or two sentences. If you want an honest description of what it was like to buy a used vehicle from this dealership, here it is. I’ve been around the block and have purchased many used vehicles. As a former auto mechanic who has worked on my own vehicles for over 40 years, I’ve rarely purchased a used vehicle from a new car dealer. We own a 2014 Acura and really like it, so when we saw a 2013 Acura at a local dealership (Davis Acura) we decided to check it out. The price was a bit high, and apparently we were taking the salesperson away from an important TV show or card game, as it was quite obvious he wasn’t especially interested in selling us a car on that particular day. The next day we saw a very similar vehicle online (at a much better price) at Reedman Toll Subaru. Although they’re over an hour from our home, I had the day off and we decided to go see it. Our salesperson, Matt T., didn’t know we were coming but was asked by the online sales representative we’d spoken with to show us the car. The car was nice but had several small dents in the fender, which looked like an amateur repair job (and may well have been), and it definitely detracted from this seemingly well-maintained vehicle. As a result we were quite hesitant to pay full price for the vehicle. Matt apparently spoke with his manager (Shawn S.) and then came to us a few minutes later and asked if we would consider buying the car if they could fix the dents. We told him we would certainly consider it, but we weren’t going to pay more, and we weren’t going to commit to purchasing the vehicle until we saw the repairs. Matt said fair enough, and they took the car to their body shop to remove the dents and repaint the fender. As this process would take several hours, we really didn’t want to have to drive over an hour to get home and then come back again later to see the repairs. Matt said, “How about if we bring the car to you? If you approve of the work you can buy it, if you don’t there’s no obligation.” This was more than fair, so they completed the work and brought the car to my wife’s workplace. The work was well done so we completed the purchase. We were certainly satisfied so far…but then the brakes started squealing loudly a few days later. I took the car to my mechanic and he discovered that the rear brakes were worn down to almost nothing and the car was not drivable. I knew the vehicle had just been inspected before we bought it (not by Reedman Toll Subaru), so I called Reedman Toll and spoke with manager Shawn S. He asked if I could send him an estimate of the necessary repairs (over $400). I did so and he approved the work that day. The car was repaired by my mechanic and I received reimbursement from Reedman Toll about a week later. Matt and Shawn were in communication with us during the entire sales process, answering questions and addressing any and all issues that came up with the utmost professionalism and courtesy. It became quite obvious to us that these two gentlemen stand behind their products and are extremely customer service-oriented and responsive, even well after the sale. I would not hesitate to drive over an hour to Reedman Toll Subaru and ask for Matt if I was in the market for another car.

Vehicle information

Ext. color: Ice Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251614
VIN: 4S4BTALC0S3306804

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Glanzmann Subaru review

Best car buying experience at Glanzmann Subaru

Glanzmann Subaru has made my car buying experience so positive and easy. John Le and Alec Diaczenko both assisted me on different visits and treated me with patience, kindness and consideration. John became my specialist and addressed all my questions and took time to explain each feature and function on the vehicle. He put me at ease and showed me options that he felt would suit my needs and lifestyle without putting any pressure on me. I enjoyed the same level of professionalism when I dealt with Alex. Lauren Lange handled the financial transaction seamlessly. I would recommend Glanzmann Subaru to everyone and am very appreciative of their expertise and courtesy.

Vehicle information

Ext. color: Autumn Green
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S3292078
VIN: 4S4BTALC2S3292078

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Ciocca Subaru of Philadelphia review

I have never had a bad experience when I come in, the

I have never had a bad experience when I come in, the people go up and above to make my experience better

Vehicle information

Ext. color: Autumn Green
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: 320203
VIN: 4S4BTALC0S3320203

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Reedman-Toll Subaru of Exton review

Your salesman Ryan provided outstanding service in our

Your salesman Ryan provided outstanding service in our search for a vehicle. We decided that we would wait for a while to purchase a car but if we stay with Subaru we wlll look up Ryan. Ray

Vehicle information

Ext. color: Cosmic Blue Pearl
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S3285972
VIN: 4S4BTALC2S3285972

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Miller Ford Lincoln review

Erica from Miller sales beat every dealers out the door

Erica from Miller sales beat every dealers out the door price on a new truck and then told me she could beat my credit unions rate. She did by 2.5% and the manager gave me an extra 1000 off for financing through Ford AFTER I was approved at a lower rate. True sales lady that cuts through all the unwanted salesman tactics. Erica knows her job and is supported by an honest manager. Best car buying experience in 20 years and I buy a new vehicle every two years. Finding a service dept that is just as great was the icing on the cake. Mark had my truck prepped exactly as I asked when had my first service done. Miller w Erica has my family's Ford buisness from now on.

Vehicle information

Ext. color: Ice Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251323
VIN: 4S4BTALC9S3273608

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Glanzmann Subaru review

Dissatisfaction with way vehicle was returned.

My 2020 Subaru Outback, purchased at Glanzmann (10-20-20) was in the Service dept. for repairs from 4-24-23 to 6-16-23. When I finally got it back it had barely 1/4 tank of gas in it & a cover to a compartment below the dashboard had not been replaced & was sitting on the front seat instead. I. E. Buckman It had

Vehicle information

Ext. color: Magnetite Gray Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: UO25597
VIN: 4S4BTALC4S3300424

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Keyless Start, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

Delaware Subaru review

E E Piretti

The people are wonderful. The location is perfect. The service department is amazing.

Vehicle information

Ext. color: White Pearl
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: 251359
VIN: 4S4BTALC3S3308482

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Power Liftgate
Entertainment: Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Ourisman Tri-State Subaru review

Corey Fitzpatrick was a wonderful sales person.

Corey Fitzpatrick was a wonderful sales person. He was not pushy at all. He did not pressure me to make a purchase and he allowed me to test drive the car for a good amount of time so I could really get the feel of it. I really enjoyed working with him and would definitely recommend anyone to ask for him when making a purchase. Thank you for making my experience a very good one.

Vehicle information

Ext. color: Ice Silver Metallic
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: UO25598
VIN: 4S4BTALC4S3300231

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Keyless Start, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

Delaware Subaru review

My Subaru checkup

This was a routine, prepaid 6 month checkup. Everything went very smoothly. I was in and out in about 35 minutes. The buying process 6 months ago was equally good and stress free.

Vehicle information

Ext. color: Crystal Black Silica
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L H-4 gasoline direct injection, DOHC, variable valve control
Stock #: S251339
VIN: 4S4BTALC7S3276815

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Glanzmann Subaru review

This dealership exceeded my expectations.

This dealership exceeded my expectations. I made an appointment and they brought the car inside so it didn't have any snow to clean off. The salesman even threw in a new battery without being asked simply because he noticed the car didn't start too well.

Vehicle information

Ext. color: Crystal White Pearl
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S3274367
VIN: 4S4BTALC7S3274367

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats

Vehicle information

Ext. color: Crystal White Pearl
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S3310201
VIN: 4S4BTALC1S3310201

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats

Vehicle information

Ext. color: Crystal Black Silica
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: S18510
VIN: 4S4BTALC4S3115726

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Power Liftgate
Entertainment: Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Colonial Volkswagen, Inc. review

I had a real good experience with them acquiring a used

I had a real good experience with them acquiring a used Toyota Tacoma. Thanks again to Youssef K.

Vehicle information

Ext. color: Crystal White Pearl
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 26-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L H4 16V GDI DOHC
Stock #: UO25550
VIN: 4S4BTALC3S3282871

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Keyless Start, Power Liftgate
Entertainment: Apple CarPlay®, Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

Delaware Subaru review

2017 Crosstrek

Scheduled Service: Customer was met by service manager; service was provided on time; and was explained to me; then I left.

  • Prev
  • 1
  • 2
  • Next

About the 2025 Subaru Outback Onyx Edition

Basics

Onyx Edition shown.

Seating
5
Door count
4
Drivetrain
All Wheel Drive
Combined MPG
28
Transmission
CVT
Engine
182.0-hp, 2.5-liter, 4 Cylinder Engine (Gasoline Fuel)
Side view of the 2025 Subaru Outback Onyx Edition
FAQs

How much does the 2025 Subaru Outback Onyx Edition cost?

The 2025 Subaru Outback Onyx Edition price depends on optional features. Prices typically start at $37,970.

What is the MPG of the 2025 Subaru Outback Onyx Edition?

The 2025 Subaru Outback Onyx Edition offers up to 26 MPG in city driving and 32 MPG on the highway for a combined rating of 28 MPG.

These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle options, driving conditions, driving habits, vehicle maintenance, and other factors.

What are some similar vehicles and competitors of the 2025 Subaru Outback Onyx Edition?

The 2025 Subaru Outback Onyx Edition compares to and/or competes against the following vehicles:


Is the 2025 Subaru Outback Onyx Edition reliable?

The 2025 Subaru Outback has an average reliability rating of 4.7 out of 5 according to Cars.com consumers. Find real-world reliability insights within consumer reviews from 2025 Outback owners.

Ratings (15 reviews)

93% of drivers recommend this car

Rating breakdown (out of 5):
  • Comfort 4.7
  • Interior 4.7
  • Performance 4.6
  • Value 4.7
  • Exterior 4.8
  • Reliability 4.7
Trims

Onyx Edition (1 style)

Style
Onyx Edition AWD
Inventory price
Starting at $37,970
Combined MPG
28
Engine
182.0-hp, 2.5-liter, 4 Cylinder Engine (Gasoline Fuel)

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

36 matches Clear
Clear
Basics
Subaru models
Outback trims
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0 % sales tax and 7.0 % APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only

Subaru Outback trims

[{"applied_filter_criteria":"{\"cpo_indicator\":true,\"make_model_trim\":[{\"trim\":\"onyx_edition\",\"make\":\"subaru\",\"model\":\"outback\"}],\"max_year\":\"2025\",\"min_year\":\"2025\",\"search_range\":\"30\",\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"all\"}","search_type":"general-inventory-search","vehicle_array":[{"stock_sub":"","msrp":"40223","price":"37706","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":["hot_car"],"trim":"Onyx Edition","mileage":"1","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Magnetite Gray Metallic","nvi_program":false,"dealer_zip":"19040","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":25,"interior_color":"Gray","vertical_position":1,"customer_id":"7812","make":"Subaru","listing_id":"a7ab52ed-3512-4ca3-a848-fcd0b7cd106c","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Glanzmann Subaru","vin":"4S4BTALC8S3289802","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"38779","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"4","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal Black Silica","nvi_program":false,"dealer_zip":"19047","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":2,"customer_id":"7825","make":"Subaru","listing_id":"ceb4b4b1-bf14-43a9-b6d9-4fb920d62233","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"ReedmanToll Auto World","vin":"4S4BTALC3S3315450","stock_type":"New"},{"stock_sub":"","msrp":"40454","price":"40454","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver Metallic","nvi_program":false,"dealer_zip":"19468","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":3,"customer_id":"5368798","make":"Subaru","listing_id":"f5418847-4f2c-4761-9f41-80899099d145","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Piazza Subaru of Limerick","vin":"4S4BTALC9S3302606","stock_type":"New"},{"stock_sub":"","msrp":"40454","price":"39645","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal Black Silica","nvi_program":false,"dealer_zip":"19146","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":15,"interior_color":"Gray","vertical_position":4,"customer_id":"6050852","make":"Subaru","listing_id":"e77ff48a-7fc4-451c-9cf1-e054cf58e133","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Ciocca Subaru of Philadelphia","vin":"4S4BTALC5S3309990","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"37781","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"3","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver Metallic","nvi_program":false,"dealer_zip":"19040","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":25,"interior_color":"Gray","vertical_position":5,"customer_id":"7812","make":"Subaru","listing_id":"1346c414-0bce-4276-a24c-2135d6c214df","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Glanzmann Subaru","vin":"4S4BTALC6S3285912","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"40223","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Silver Metallic","nvi_program":false,"dealer_zip":"19342","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":6,"customer_id":"5385237","make":"Subaru","listing_id":"a461a958-98d7-475a-b8d3-1e4beedbc343","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Concordville Subaru","vin":"4S4BTALC8S3286530","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"37668","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver","nvi_program":false,"dealer_zip":"19341","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":7,"customer_id":"5387210","make":"Subaru","listing_id":"4716e89e-834b-41b3-b77f-087df5ec5381","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Reedman-Toll Subaru of Exton","vin":"4S4BTALC5S3315532","stock_type":"New"},{"stock_sub":"","msrp":"40454","price":"37930","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"1","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver Metallic","nvi_program":false,"dealer_zip":"19040","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":8,"customer_id":"7812","make":"Subaru","listing_id":"c1634102-1e9a-4eb7-81d6-b2b1819cd487","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Glanzmann Subaru","vin":"4S4BTALC0S3306804","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"39419","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Autumn Green","nvi_program":false,"dealer_zip":"19146","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":15,"interior_color":"Gray","vertical_position":9,"customer_id":"6050852","make":"Subaru","listing_id":"4fae5e8f-b22d-4e0c-b223-95d6e84dbaa6","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Ciocca Subaru of Philadelphia","vin":"4S4BTALC2S3292078","stock_type":"New"},{"stock_sub":"","msrp":"40223","price":"37668","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"0","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Autumn Green","nvi_program":false,"dealer_zip":"19341","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":10,"customer_id":"5387210","make":"Subaru","listing_id":"d9da3b81-bcc5-4dcb-a053-fdaa07a8b4ca","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Reedman-Toll Subaru of Exton","vin":"4S4BTALC0S3320203","stock_type":"New"},{"stock_sub":"","msrp":"40604","price":"40604","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"6","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Cosmic Blue Pearl","nvi_program":false,"dealer_zip":"08048","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":"Gray","vertical_position":11,"customer_id":"5373513","make":"Subaru","listing_id":"8dfb48cb-2fdd-45a1-a275-849fa9fa3811","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Miller Ford Lincoln","vin":"4S4BTALC2S3285972","stock_type":"New"},{"stock_sub":"","msrp":"40525","price":"36720","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":["price_drop_in_cents"],"trim":"Onyx Edition","mileage":"1","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver Metallic","nvi_program":false,"dealer_zip":"19040","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":25,"interior_color":"Gray","vertical_position":12,"customer_id":"7812","make":"Subaru","listing_id":"c0ca6719-ab7d-4e97-8e92-0031341adf6e","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Glanzmann Subaru","vin":"4S4BTALC9S3273608","stock_type":"New"},{"stock_sub":"","msrp":"40356","price":"38606","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":["hot_car"],"trim":"Onyx Edition","mileage":"8","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Magnetite Gray Metallic","nvi_program":false,"dealer_zip":"19806","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":31,"interior_color":"Gray","vertical_position":13,"customer_id":"5256484","make":"Subaru","listing_id":"9e8d8a62-643c-43d8-afe6-489b0d477dce","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Delaware Subaru","vin":"4S4BTALC4S3300424","stock_type":"New"},{"stock_sub":"","msrp":"40356","price":"40356","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"6","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"White Pearl","nvi_program":false,"dealer_zip":"19711","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":20,"interior_color":"Gray","vertical_position":14,"customer_id":"6066299","make":"Subaru","listing_id":"39c87568-55e1-42ac-acc9-86bde5fd4327","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Ourisman Tri-State Subaru","vin":"4S4BTALC3S3308482","stock_type":"New"},{"stock_sub":"","msrp":"40356","price":"38606","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":["hot_car"],"trim":"Onyx Edition","mileage":"6","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Ice Silver Metallic","nvi_program":false,"dealer_zip":"19806","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":2,"interior_color":"Gray","vertical_position":15,"customer_id":"5256484","make":"Subaru","listing_id":"52d09ca0-ec3b-4707-a718-c23017528a49","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Delaware Subaru","vin":"4S4BTALC4S3300231","stock_type":"New"},{"stock_sub":"","msrp":"40525","price":"37447","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"3","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal Black Silica","nvi_program":false,"dealer_zip":"19040","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":25,"interior_color":"Gray","vertical_position":16,"customer_id":"7812","make":"Subaru","listing_id":"3426ab24-12f0-4b99-b0ae-d67560529822","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Glanzmann Subaru","vin":"4S4BTALC7S3276815","stock_type":"New"},{"stock_sub":"","msrp":"40383","price":"40383","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"7","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal White Pearl","nvi_program":false,"dealer_zip":"08048","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":15,"interior_color":"Gray","vertical_position":17,"customer_id":"5373513","make":"Subaru","listing_id":"bc99166f-99a0-4205-94c9-3bbabe2f3180","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Miller Ford Lincoln","vin":"4S4BTALC7S3274367","stock_type":"New"},{"stock_sub":"","msrp":"40554","price":"40554","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"29","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal White Pearl","nvi_program":false,"dealer_zip":"08048","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":1,"interior_color":null,"vertical_position":18,"customer_id":"5373513","make":"Subaru","listing_id":"334f85b2-9c0b-4b17-9da2-20de66c76d0e","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Miller Ford Lincoln","vin":"4S4BTALC1S3310201","stock_type":"New"},{"stock_sub":"","msrp":"38305","price":"38305","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":[],"trim":"Onyx Edition","mileage":"11","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal Black Silica","nvi_program":false,"dealer_zip":"19053","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":32,"interior_color":"Gray","vertical_position":19,"customer_id":"6043088","make":"Subaru","listing_id":"3612d2cc-b07c-49e9-aae5-29450a553ca8","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Colonial Volkswagen, Inc.","vin":"4S4BTALC4S3115726","stock_type":"New"},{"stock_sub":"","msrp":"40135","price":"38385","drivetrain":"All-wheel Drive","relevancy_score":null,"sponsored":false,"badges":["hot_car"],"trim":"Onyx Edition","mileage":"6","model":"Outback","bodystyle":"SUV","seller_type":"dealership","cat":"wagonhatchback_wagon","cpo_package":null,"cpo_indicator":false,"exterior_color":"Crystal White Pearl","nvi_program":false,"dealer_zip":"19806","canonical_mmt":"Subaru:Outback:Onyx Edition","sponsored_type":"standard","certified_preowned":false,"photo_count":2,"interior_color":"Gray","vertical_position":20,"customer_id":"5256484","make":"Subaru","listing_id":"0efef425-7ba4-412d-9f9a-6ca19fc95914","canonical_mmty":"Subaru:Outback:Onyx Edition:2025","fuel_type":"Gasoline","year":"2025","dealer_name":"Delaware Subaru","vin":"4S4BTALC3S3282871","stock_type":"New"}],"sponsored_type_eligible":["inventory_ad"]}]