Skip to main content
Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang Photo of 2024 Shadow Black Ford Mustang
Photo of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang Thumbnail of 2024 Shadow Black Ford Mustang
Ad

Car shopper resources

Basics

Exterior color
Shadow Black
Interior color
Black Onyx
Drivetrain
Rear-wheel Drive
MPG
15–23

Based on EPA mileage ratings. Use for comparison purposes only. Actual mileage will vary depending on driving conditions, driving habits, vehicle maintenance, and other factors.

Fuel type
Gasoline
Transmission
6-Speed Manual
Engine
5L V-8 port/direct injection, DOHC, Ti-VCT variable valve contro
VIN
1FA6P8CF0R5421128
Stock #
JM21993A
Mileage
30,890 mi.

Features

Convenience
  • Keyless Entry
  • Keyless Start
  • Remote Start
Entertainment
  • Android Auto®
  • Apple CarPlay®
  • Bluetooth®
  • USB Port
  • WiFi Hotspot
Exterior
  • Alloy Wheels
Safety
  • Automatic Emergency Braking
  • Backup Camera
  • Blind Spot Monitor
  • Brake Assist
  • LED Headlights
  • Lane Departure Warning
  • Rain Sensing Wipers
  • Rear Cross Traffic Alert
  • Stability Control
View all features

Features

These features are associated with this vehicle type. Contact the seller to confirm this specific vehicle has them.

  • 10-Speed SelectShift Automatic Transmission
  • 12V power outlets 2 12V power outlets
  • 3.55 Limited Slip Rear Axle
  • 4-Wheel Disc Brakes
  • 50-State Emissions System
  • 6 Speakers
  • ABS Brakes 4-wheel antilock (ABS) brakes
  • ABS Brakes Four channel ABS brakes
  • ABS brakes
  • AM/FM Stereo
  • AM/FM radio
  • Accessory power Retained accessory power
  • Air Conditioning
  • Air conditioning Yes
  • All-in-one key All-in-one remote fob and ignition key
  • Alloy wheels
  • Alternator Type Regenerative alternator
  • Android Auto
  • Antenna Fixed audio antenna
  • Apple CarPlay
  • Armrests front center Front seat center armrest
  • Auto High-beam Headlights
  • Auto door locks Auto-locking doors
  • Auto headlights Autolamp auto on/off headlight control
  • Auto high-beam headlights Auto High Beam auto high-beam headlights
  • Automatic Emergency Braking
  • Automatic temperature control
  • Backup Camera
  • Basic warranty 36 month/36,000 miles
  • Battery charge warning
  • Battery run down protection
  • Battery type Lead acid battery
  • Beverage holders Front beverage holders
  • Blind Spot Monitor
  • Blind spot BLIS (Blind Spot Information System)
  • Body panels Galvanized steel/aluminum body panels with side impact beams
  • Brake Assist
  • Brake assist
  • Brake assist system Predictive brake assist system
  • Brake type 4-wheel disc brakes
  • Built-in virtual assistant SYNC 4 with Enhanced Voice Recognition (Alexa-Bui…
  • Bulb warning Bulb failure warning
  • Bumper rub strip rear Black rear bumper rub strip
  • Bumpers front Body-colored front bumper
  • Bumpers rear Body-colored rear bumper
  • Bumpers: body-color
  • Cabin air filter
  • Capless fuel filler Easy Fuel capless fuel filler
  • Cargo access Power cargo area access release
  • Cargo floor type Carpet cargo area floor
  • Cargo light Cargo area light
  • Climate control Automatic climate control
  • Clock Digital clock
  • Cloth Bucket Seats
  • Compass
  • Configurable instrumentation gauges
  • Console insert material Simulated carbon fiber console insert
  • Corrosion perforation warranty 60 month/unlimited
  • Cruise control Cruise control with steering wheel mounted controls
  • Cylinder head material Aluminum cylinder head
  • DRL preference setting
  • Data recorder Track Apps performance data recorder
  • Day/Night rearview mirror
  • Delay off headlights Delay-off headlights
  • Delay-off headlights
  • Door ajar warning Rear cargo area ajar warning
  • Door bins front Driver and passenger door bins
  • Door handle material Body-colored door handles
  • Door locks Power door locks with 2 stage unlocking
  • Door mirror style Body-colored door mirrors
  • Door mirror type Standard style side mirrors
  • Door mirrors Power door mirrors
  • Door panel insert Simulated carbon fiber door panel insert
  • Door trim insert Vinyl door trim insert
  • Drive type Rear-wheel drive
  • Driver attention monitor Driver Alert
  • Driver door bin
  • Driver foot rest
  • Driver information center
  • Driver seat direction Driver seat with 6-way directional controls
  • Driver selectable steering effort
  • Driver side rear seat easy entry Manual driver side rear seat easy entry
  • Driver vanity mirror
  • Drivetrain selectable Driver selectable drivetrain mode
  • Dual front impact airbags
  • Dual front side impact airbags
  • Electronic Stability Control
  • Electronic parking brake
  • Electronic stability control AdvanceTrac electronic stability control system…
  • Emergency SOS Capable 911 Assist emergency SOS system via mobile device
  • Emergency communication system: 911 Assist
  • Emissions LEV3-ULEV125 emissions
  • Emissions tiers Tier 3 Bin 125 emissions
  • Engine 5L V-8 port/direct injection, DOHC, Ti-VCT variable valve control, pr…
  • Engine Cylinders V8
  • Engine Location Front mounted engine
  • Engine Mounting direction Longitudinal mounted engine
  • Engine block material Aluminum engine block
  • Engine temperature warning
  • Engine/electric motor temperature gauge
  • Equipment Group 300A Standard Package
  • Exit warning External exit warning system
  • Exterior Parking Camera Rear
  • External memory SYNC 4 external memory control
  • First-row windows Power first-row windows
  • Floor console Full floor console
  • Floor console storage Covered floor console storage
  • Floor coverage Full floor coverage
  • Floor covering Full carpet floor covering
  • Floor mats Carpet front floor mats
  • Fob engine controls Smart key with hands-free access and push button start
  • Folding door mirrors Manual folding door mirrors
  • Folding rear seats 50-50 folding rear seats
  • Forward collision warning Automatic Emergency Braking (AEB) forward collisio…
  • Four wheel independent suspension
  • Front Bucket Seats
  • Front Center Armrest
  • Front anti-roll Front anti-roll bar
  • Front anti-roll bar
  • Front head restraint control Manual front seat head restraint control
  • Front head restraints Height and tilt adjustable front seat head restraints
  • Front impact airbag driver Driver front impact airbag
  • Front impact airbag passenger Passenger front impact airbag
  • Front reading lights
  • Front seat upholstery Cloth front seat upholstery
  • Front seatback upholstery Cloth front seatback upholstery
  • Front side impact airbag driver Seat mounted side impact driver airbag
  • Front side impact airbag passenger Seat mounted side impact front passenger …
  • Fuel Type Premium Unleaded
  • Full gauge cluster screen
  • Fully automatic headlights
  • Gas Guzzler Tax
  • Gauge cluster display size (inches) Gauge cluster display size: 12.40
  • Gearshifter material Leather and metal-look gear shifter material
  • Glove box Illuminated locking glove box
  • Grille style Black grille
  • Handsfree Bluetooth handsfree wireless device connectivity
  • Headlight type Projector beam headlights
  • Headlights LED low and high beam headlights
  • Headlights on reminder
  • Headliner coverage Full headliner coverage
  • Headliner material Cloth headliner material
  • High mount stop light High mounted center stop light
  • Hill Start Assist
  • Ignition Spark ignition system
  • Illuminated entry
  • Illuminated glove box
  • Illuminated ignition switch
  • Immobilizer SecuriLock immobilizer
  • Instrumentation display Digital/analog instrumentation display
  • Interior accents Chrome and metal-look interior accents
  • Interior courtesy lights Fade interior courtesy lights
  • Internet access FordPass Connect mobile hotspot internet access
  • Key in vehicle warning
  • Keyfob cargo controls Keyfob trunk control
  • Keyfob keyless entry
  • Keyfob remote start
  • Keyfob window controls Keyfob window control
  • Keyless Entry
  • Keyless Start
  • Knee airbag
  • Knee airbag Driver and passenger side knee airbag
  • LED brake lights
  • Lane Departure Warning
  • Lane departure Lane Keeping Alert
  • Leather Shift Knob
  • Leather steering wheel
  • Limited Slip Center Differential
  • Limited slip differential Mechanical limited slip differential
  • Lock-up transmission
  • Low level warnings Low level warning for oil, fuel and brake fluid
  • Low tire pressure warning
  • Low tire pressure warning Tire specific low air pressure warning
  • Manual driver seat controls Driver seat manual reclining, fore/aft control a…
  • Manual passenger seat controls Passenger seat manual reclining and fore/aft …
  • Mini Spare Wheel and Tire
  • Mobile app access FordPass App mobile app access
  • Multiple headlights Multiple enclosed headlights
  • Number of airbags 8 airbags
  • Number of beverage holders 2 beverage holders
  • Number of doors 2 doors
  • Number of first-row screens 2 total number of 1st row displays
  • Occupancy sensor Airbag occupancy sensor
  • Occupant sensing airbag
  • Oil level gauge
  • Oil pressure gauge
  • Oil pressure warning
  • Oil temperature gauge
  • One-touch down window Driver and passenger one-touch down windows
  • One-touch up window Driver and passenger one-touch up windows
  • Outside temperature display
  • Over the air updates
  • Overdrive transmission
  • Overhead airbag
  • Overhead airbags Curtain first and second-row overhead airbags
  • Overhead console
  • Overhead console Mini overhead console
  • Overhead console storage
  • Paint Non-metallic paint
  • Panel insert Simulated carbon fiber instrument panel insert
  • Panic alarm
  • Parking sensors Rear parking sensors
  • Passenger door bin
  • Passenger seat direction Front passenger seat with 4-way directional control…
  • Passenger side rear seat easy entry Manual passenger side rear seat easy ent…
  • Passenger vanity mirror
  • Pedestrian detection Pre-Collision Assist with Pedestrian Detection
  • Post collision braking system Ford Co-Pilot360 - Post Collision Braking auto…
  • Power door mirrors
  • Power steering
  • Power windows
  • Powertrain type ICE
  • Powertrain warranty 60 month/60,000 miles
  • Primary display size 13.2 inch primary display
  • Primary display touchscreen Primary monitor touchscreen
  • RDS Radio data system (RDS)
  • Radiator
  • Radio AM/FM
  • Radio data system
  • Rain Sensing Front Wipers
  • Rain detecting wipers
  • Rain sensing wipers
  • Rear Cross Traffic Alert
  • Rear Parking Sensors
  • Rear Spoiler
  • Rear Springs Regular grade rear springs
  • Rear anti-roll Rear anti-roll bar
  • Rear anti-roll bar
  • Rear camera Rear mounted camera
  • Rear cargo door Trunk
  • Rear collision warning Cross-Traffic Alert collision mitigation
  • Rear head restraint control 2 rear seat head restraints
  • Rear head restraints Fixed rear head restraints
  • Rear seat direction Front facing rear seat
  • Rear seat folding position Fold forward rear seatback
  • Rear seat upholstery Cloth rear seat upholstery
  • Rear seatback upholstery Carpet rear seatback upholstery
  • Rear seats Rear bench seat
  • Rear seats fixed or removable Fixed rear seats
  • Rear window defroster
  • Rear windshield Fixed rear windshield
  • Remote keyless entry
  • Remote panic alarm
  • Roadside warranty 60 month/60,000 miles
  • Running lights LED daytime running lights
  • SYNC 4.0 QNX
  • Seatbelt pretensioners Front seatbelt pretensioners
  • Seatbelt pretensioners number 2 seatbelt pre-tensioners
  • Seating capacity 4
  • Second-row windows Fixed second-row windows
  • Seek scan
  • Selectable mode transmission
  • Sequential shift control SelectShift Sequential shift with steering wheel co…
  • Service interval warning Service interval indicator
  • Shifter boot Vinyl shifter boot
  • Shock absorbers Gas-pressurized shock absorbers
  • Shutters Active grille shutters
  • Smart device integration SYNC 4 AppLink/Apple CarPlay/Android Auto smart dev…
  • Smart device remote start
  • Spare tire Compact spare tire with steel wheel
  • Spare tire location Spare tire mounted under the cargo floor
  • Speakers Standard grade speakers
  • Speakers number 6 speakers
  • Special paint Monotone paint
  • Speed control
  • Speed sensitive steering Speed sensitive power steering
  • Speed sensitive volume
  • Speed sensitive wipers
  • Speed-Sensitive Wipers
  • Speed-sensing steering
  • Speedometer Redundant digital speedometer
  • Split folding rear seat
  • Split front seats Bucket front seats
  • Spoiler
  • Spoiler Rear lip spoiler
  • Sport steering wheel
  • Springs front Front coil springs
  • Springs rear Rear coil springs
  • Stability Control
  • Start-stop engine Auto stop-start engine
  • Steering Electric power-assist steering system
  • Steering mounted audio control Steering wheel mounted audio controls
  • Steering type Rack-pinion steering
  • Steering wheel material Leather steering wheel
  • Steering wheel mounted audio controls
  • Steering wheel telescopic Manual telescopic steering wheel
  • Steering wheel tilt Manual tilting steering wheel
  • Suspension Standard ride suspension
  • Suspension ride type front Independent front suspension
  • Suspension ride type rear Independent rear suspension
  • Suspension type front Strut front suspension
  • Suspension type rear Multi-link rear suspension
  • Tachometer
  • Tailpipe Stainless steel dual exhaust with polished tailpipe finisher
  • Telescoping steering wheel
  • Temperature display Exterior temperature display
  • Tilt steering wheel
  • Tinted windows Light tinted windows
  • Tires P255/45VR18 AS BSW front and rear tires
  • Traction Control
  • Traction control
  • Traction control All-speed ABS and driveline traction control
  • Transmission 10-speed automatic
  • Transmission Type Automatic
  • Transmission electronic control
  • Transmission fluid temperature warning Transmission fluid temp warning
  • Transmission temperature gauge Transmission fluid temperature gauge
  • Trip computer
  • Trip odometer
  • Trunk lid trim Carpet trunk lid trim
  • Turn signal warning Turn signal on warning
  • USB Port
  • USB ports 2 USB ports
  • Variable intake manifold
  • Variable panel light Variable instrument panel light
  • Variably intermittent wipers
  • Vehicle tracker FordPass Connect vehicle tracker
  • Ventilated brakes Front and rear ventilated disc brakes
  • Visor driver expandable coverage Driver visor with expandable coverage
  • Visor driver mirror Driver visor mirror
  • Visor illuminated driver mirror Illuminated driver visor mirror
  • Visor illuminated passenger mirror Illuminated passenger visor mirror
  • Visor passenger expandable coverage Passenger visor with expandable coverage…
  • Visor passenger mirror Passenger visor mirror
  • Voice activated audio SYNC 4 with Enhanced Voice Recognition (Alexa-Built-In…
  • Voice activated climate control SYNC 4 with Enhanced Voice Recognition (Alex…
  • Voltmeter
  • WIFI Hotspot
  • Wheels 18 x 8.5-inch front and rear black aluminum wheels
  • Wheels: 18in x 8.5in Ebony Black Painted Aluminum
  • Window Trim Black side window trim
  • Wipers Variable intermittent front windshield wipers
  • Wireless streaming Bluetooth wireless audio streaming
2024 Award Winner

American Made Index

This car features on the American-Made Index, which analyzes five factors to find the most American cars.
See more details
award winner

Vehicle history by CARFAX

Accidents or damage
None reported
1-owner vehicle
Yes
Personal use only
Yes
Open recall
At least 1 open recall reported
The vehicle history information is supplied by third parties. Cars.com and the Seller are not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Please see Cars.com Terms and Conditions for further information.

Seller’s info

Younger Nissan

(3,222 reviews)
7418 Grove Rd, Frederick, MD 21704

Seller’s notes about this car

2024 Ford Mustang GT Shadow Black RWD 6-Speed Manual 5.0L V8 Ti-VCTAuto High-beam Headlights, Electronic Stability Control, Equipment Group 300A Standard Package, Exterior Parking Camera Rear, Power door mirrors, Rain sensing wipers, Rear Parking Sensors, Spoiler, Sport steering wheel, Tachometer, Telescoping steering wheel, Wheels: 18'' x 8.5'' Ebony Black Painted Aluminum.CARFAX One-Owner.Younger Nissan VIP Program Includes 2 Free Oil Changes with Each Used and New Car Purchase. Not all qualify. See dealer for details.DealerRater of the Year for 13 years running! 2013-2025. Only Nissan Dealership in Mid-Atlantic Region to achieve his feat. Check out our reviews online on DealerRater.com!Thank you for visiting Younger Nissan of Fredericks web site! Were a Nissan dealer near Germantown, Rockville, and Hagerstown, MD where you can get the best selection of vehicles, and Nissan service. Our goal is to give you access to our full inventory of new Nissans, our used car selection, and our on-site service and collision centers. Through this website, you can get a quote, apply for financing, or schedule an appointment at our service center. No matter the reason you end up coming to us, we promise that youll be given the best customer service by all of our employees. Were a Nissan dealer in Frederick, MD located at 7418 Grove Road. Pay us a visit or give us a call at (877) 522-9872 today!Dealer prices exclude TAXES, FREIGHT, TITLE, LICENSE, and DEALER PROCESSING FEE of $799.00.
Please visit www.youngernissan.com for your free Gift Card Offer! Use the Forum on this page to contact us OR call us at 1-888-227-8938 to schedule a NO PRESSURE test drive.

Have a question?

Get answers, see the car, or find a good time for a test drive. Take the next step and contact the seller.

Contact seller

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Price history

Listed 15 days ago.
8/30/25 Listed $38,500
9/03/25 -$100 $38,400
9/06/25 +$855 $39,255
9/09/25 -$255 $39,000
Total price amount is based on price change information provided by the seller.

Customize your payment

Based on est. car price of $39,000 at ...% APR* and ...% sales tax.
$... per month
Car price
$39,000
Down payment
-Not Priced
Trade-in value
-Not Priced
Estimated sales tax ...%
(based on ZIP)
+
Other fees*
Not included
Total loan amount
Total interest paid
(over life of loan)
+
Total loan & interest paid
Monthly payment
Ad
Estimate trade-in
Estimate trade-in
Get prequalified

Not all customers will qualify. All decisions related to submission of consumer’s credit application, assignment of financing agreement, and available lenders are at sole discretion of the dealer. Cars.com is not an automobile dealer or a lender, and will not render a credit decision.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Ad

Consumer reviews

See what others are saying about the 2024 Ford Mustang.
(6 reviews)
Rating breakdown (out of 5):
  • Comfort 4.3
  • Interior 4.5
  • Performance 4.8
  • Value 4.0
  • Exterior 4.3
  • Reliability 3.8

Most recent consumer reviews

Excellent value for the price.

Excellent value for the price. Do not purchase this vehicle without the active exhaust option. The fake vents are disappointing but otherwise the car is perfect.

Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 5.0
  • Performance 5.0
  • Value 5.0
  • Exterior 5.0
  • Reliability 5.0
  • Purchased a New car
  • Used for Having fun
  • Does recommend this car
1 person out of 2 found this review helpful. Did you?
Yes No

Poor workmanship.

Poor workmanship. Too many rattles for a car in this price range. Yes, it's fast...but how often can I open it up and enjoy it?

Rating breakdown (out of 5):
  • Comfort 2.0
  • Interior 2.0
  • Performance 4.0
  • Value 1.0
  • Exterior 4.0
  • Reliability 1.0
  • Purchased a New car
  • Used for Having fun
  • Does not recommend this car
5 people out of 5 found this review helpful. Did you?
Yes No

The issue wasn't the car.

The issue wasn't the car... it was that I drove 2 hours to get the car this afternoon, just for them to sell it 30 min before I got there. Do not buy a car from Heather Pugh.

Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 5.0
  • Performance 5.0
  • Value 5.0
  • Exterior 5.0
  • Reliability 4.0
  • Purchased a Used car
  • Used for Having fun
  • Does recommend this car
11 people out of 15 found this review helpful. Did you?
Yes No
See all 6 consumer reviews

Similar cars at this dealership

Used
2019 Ford Mustang Bullitt
19,530 mi.
$42,300 $2,000 price drop
Used
2024 Nissan Altima SR Intelligent AWD
17,587 mi.
$24,700 $650 price drop
Used
2023 Toyota Camry LE
55,522 mi.
$22,200 $100 price drop
Used
2023 Toyota Camry LE
60,201 mi.
$22,000
Ad

Car shopper resources

Cars.com Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; Cars.com is not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Click here for more details.

Bluetooth® is a registered mark of Bluetooth® SIG, Inc. Android Auto™ is a trademark of Google LLC. Apple CarPlay® is a registered trademark of Apple Inc. Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, Germany.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

Call
Check availability

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

  • Want to sell or trade-in your car fast? Get a free Instant Offer from local dealers.
  • Tell us about your car and get a free Instant Offer within minutes.
  • Schedule a car inspection with the dealer.
  • Use your Instant Offer to trade-in your car.
Get your Instant Offer