Skip to main content
Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe Photo of 2022 Summit White Chevrolet Tahoe
Photo of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe Thumbnail of 2022 Summit White Chevrolet Tahoe
Ad

Car shopper resources

Basics

Exterior color
Summit White
Interior color
Jet Black
Drivetrain
Four-wheel Drive
MPG
15–20

Based on EPA mileage ratings. Use for comparison purposes only. Actual mileage will vary depending on driving conditions, driving habits, vehicle maintenance, and other factors.

Fuel type
Gasoline
Transmission
10-Speed Automatic
Engine
5.3L V8 16V GDI OHV
VIN
1GNSKPKD6NR176217
Stock #
255881A
Mileage
57,333 mi.

Features

Convenience
  • Heated Seats
  • Heated Steering Wheel
  • Keyless Entry
  • Navigation System
  • Power Liftgate
  • Remote Start
Entertainment
  • Apple CarPlay®
  • Bluetooth®
  • Premium Sound System
  • Satellite Radio
Exterior
  • Alloy Wheels
  • Roof Rack
  • Sunroof/Moonroof
  • Tow Hitch
  • Tow Hooks
Safety
  • Backup Camera
  • Brake Assist
  • Lane Departure Warning
  • Rain Sensing Wipers
  • Rear Cross Traffic Alert
  • Stability Control
Seating
  • Leather Seats
  • Memory Seat
  • Third Row Seating
Additional popular features:
headlight control - auto highbeam, Keyless Start, LED Headlights, USB Port, Blind Spot Monitor, Automatic Emergency Braking, collision warning system, parking distance sensors, parking assistance
View all features

Features

These features are associated with this vehicle type. Contact the seller to confirm this specific vehicle has them.

  • 10-Way Power Driver & Passenger Seat Adjusters
  • 120v Ac Power Outlet : 2
  • 1st & 2nd Row Color-Keyed Carpeted Floor Mats
  • 1st, 2nd and 3rd row head airbags
  • 2-Speed Active Electronic Autotrac Transfer Case
  • 2nd Row Pwr Release 60/40 Split-Folding Bench Seat
  • 3.23 Rear Axle Ratio
  • 3rd Row 60/40 Power-Folding Split-Bench Seat
  • 3rd Row Head Room: 38.2"
  • 3rd Row Hip Room: 49.4"
  • 3rd Row Leg Room: 34.9"
  • 3rd Row Seats: Split-Bench
  • 3rd Row Shoulder Room : 62.7 "
  • 4-Wheel Disc Brakes
  • 4-wheel ABS Brakes
  • 60-40 Third Row Seat
  • 9 Speakers
  • ABS Brakes
  • ABS and Driveline Traction Control
  • AM/FM Radio: Siriusxm With 360l
  • Advanced Trailering Package
  • Air Conditioning
  • All-Weather Cargo Mat (Lpo)
  • All-Weather Floor Mats
  • Alloy Wheels
  • Anti-theft alarm system
  • Apple Carplay/Android Auto
  • Audio System Premium Brand Speakers: Bose
  • Audio System Premium Brand: Chevrolet Infotainment System 3
  • Audio controls on steering wheel
  • Audio system memory card slot
  • Auto High-Beam Headlights
  • Auto-Dimming Inside Rear-View Mirror
  • Auto-Dimming Rear-View Mirror
  • Automatic Stop/Start
  • Automatic Temperature Control
  • Automatic front air conditioning
  • Automatic locking hubs
  • Auxilliary engine cooler
  • Auxilliary transmission cooler
  • Backup Camera
  • Black Tubular Assist Steps
  • Bluetooth wireless phone connectivity
  • Bluetooth/Handsfree
  • Bose 9-Speaker Stereo Audio System Feature
  • Brake Assist
  • Braking Assist
  • Bright Front & Rear Door Sill Plates
  • Bucket front seats
  • Bumpers: Body-Color
  • Carfax 1-Owner
  • Cargo area light
  • Center Console: Full with covered storage
  • Clock: In-radio display
  • Coil front spring
  • Coil rear spring
  • Color-Keyed Carpeting Floor Covering
  • Compass
  • Cruise control
  • Cruise controls on steering wheel
  • Cupholders: Front and rear
  • Curb weight: 5,661 lbs.
  • Dark chrome grille
  • Daytime running lights
  • Delay-Off Headlights
  • Diameter of tires: 20.0"
  • Door pockets: Driver, passenger and rear
  • Door reinforcement: Side-impact door beam
  • Driver & Front Outboard Passenger Airbags
  • Driver Alert Package
  • Driver Door Bin
  • Driver Vanity Mirror
  • Driver and passenger heated-cushion, driver and passenger heated-seatback
  • Driver seat memory
  • Dual Front Impact Airbags
  • Dual Front Side Impact Airbags
  • Dual front air conditioning zones
  • Dual illuminated vanity mirrors
  • Dual-Pane Power Panoramic Sunroof
  • Dusk sensing headlights
  • Electrochromatic rearview mirror
  • Electronic Stability Control
  • Emergency Communication System: Onstar And Chevrolet Connected Services Capa…
  • Engine immobilizer
  • Enhanced Driver Information Center
  • External temperature display
  • Extra Capacity Cooling System
  • Floor Console W/Storage Area
  • Floor mats: Carpet front and rear
  • Four Wheel Independent Suspension
  • Four-wheel Independent Suspension
  • Front Anti-Roll Bar
  • Front Bucket Seats
  • Front Center Armrest
  • Front Dual Zone A/C
  • Front Head Room: 42.3"
  • Front High-Approach Angle Fascia
  • Front High-Back Reclining Bucket Seats
  • Front Hip Room: 61.5"
  • Front Leg Room: 44.5"
  • Front Reading Lights
  • Front Shoulder Room: 66.0"
  • Front Ventilated disc brakes
  • Front and rear reading lights
  • Front and rear suspension stabilizer bars
  • Fuel Capacity: 24.0 gal.
  • Fuel Consumption: City: 15 mpg
  • Fuel Consumption: Highway: 20 mpg
  • Fuel Type: Regular unleaded
  • Fully Automatic Headlights
  • Gross vehicle weight: 7,500 lbs.
  • HD Surround Vision
  • Hands-Free Rear Power Programmable Liftgate
  • Headlights off auto delay
  • Heated 2nd Row Outboard Seats
  • Heated Door Mirrors
  • Heated Driver & Front Passenger Seats
  • Heated Front Seats
  • Heated Steering Wheel
  • Heated driver mirror
  • Heated passenger mirror
  • Hill Descent Control
  • Hitch Guidance W/Hitch View
  • Illuminated Entry
  • Independent front suspension classification
  • Independent rear suspension
  • Infotainment Display
  • Instrumentation: Low fuel level
  • Integrated Navigation System : with voice activation
  • Integrated Trailer Brake Controller
  • Interior air filtration
  • LED Daytime Running Lamps
  • Lane Change Alert W/Side Blind Zone Alert
  • Leather Steering Wheel
  • Leather seat upholstery
  • Leather steering wheel trim
  • Leather-Appointed Seat Trim
  • Leather-Wrapped Steering Wheel
  • Low Tire Pressure Warning
  • Luxury Package
  • Machined aluminum rims w/ painted accents
  • Manual Folding Third Row Seat
  • Max Trailering Package
  • Max cargo capacity: 123 cu.ft.
  • Memorized Settings for 2 drivers
  • Memory Seat
  • Memory Settings
  • Memory Settings For Driver
  • Multi-link rear suspension
  • Navigation System
  • Not Equipped W/Heated Steering Wheel (Disc)
  • Not Equipped W/Steering Column Lock
  • Occupant Sensing Airbag
  • OnStar and Chevrolet connected services capable
  • One 12V DC power outlet
  • Outside Heated Power-Adjustable Mirrors
  • Outside Temperature Display
  • Overall Length : 210.7 "
  • Overall Width : 81.1 "
  • Overall height: 75.9"
  • Overhead Airbag
  • Overhead Console
  • Overhead console: Mini with storage
  • Panic Alarm
  • Passenger Airbag
  • Passenger Door Bin
  • Passenger Vanity Mirror
  • Power Door Mirrors
  • Power Driver Seat
  • Power Passenger Seat
  • Power Release 2nd Row Bucket Seats
  • Power Steering
  • Power Tilt & Telescopic Steering Column
  • Power liftgate
  • Power remote driver mirror adjustment
  • Power remote passenger mirror adjustment
  • Power windows
  • Preferred Equipment Group 2z7
  • Premium Audio System: Chevrolet Infotainment System 3
  • Premium Smooth Ride Suspension
  • Privacy glass: Deep
  • Proximity remote trunk release
  • Radio: Chevrolet Infotainment 3 Premium System
  • Rain Sensing Wipers
  • Rain sensing front wipers
  • Rear Air Conditioning
  • Rear Anti-Roll Bar
  • Rear Cross Traffic Alert
  • Rear Head Room: 38.9"
  • Rear Hip Room: 61.3"
  • Rear Leg Room: 42.0"
  • Rear Pedestrian Alert
  • Rear Reading Lights
  • Rear Seat Center Armrest
  • Rear Shoulder Room: 64.8"
  • Rear Stabilizer Bar: Regular
  • Rear Window Defroster
  • Rear Window Wiper
  • Rear air conditioning with separate controls
  • Rear center seatbelt: 3-point belt
  • Rear heat ducts with separate controls
  • Rear seats center armrest
  • Rear spoiler: Lip
  • Red Horizontal-Mounted Recovery Hooks
  • Regular front stabilizer bar
  • Remote Engine Start : Remote start - keyfob and smart device (subscription r…
  • Remote Keyless Entry
  • Remote Start
  • Remote activated exterior entry lights
  • Remote power door locks
  • Roof Rack: Rails Only
  • Roof rails
  • Seatback storage: 2
  • Seatbelt pretensioners: Front
  • Security System
  • Set Of 4 Wheel Locks (Lpo)
  • Short and long arm front suspension
  • Side airbag
  • SiriusXM with 360L AM/FM/Satellite Radio
  • SiriusXM with 360L Satellite Radio
  • Siriusxm Radio W/360l
  • Smart Trailer Integration Indicator
  • Spare Tire Mount Location: Underbody w/crankdown
  • Speed Control
  • Speed Sensitive Audio Volume Control
  • Speed-Sensing Steering
  • Speed-proportional electric power steering
  • Split Folding Rear Seat
  • Split rear bench
  • Spoiler
  • Stability controll with anti-roll
  • Start/Stop System Disable Button
  • Steel spare wheel rim
  • Steering Wheel Mounted Audio Controls
  • Surround Audio
  • Suspension class: Regular
  • Tachometer
  • Telescoping Steering Wheel
  • This Vehicle Is Nicely Equiped With...
  • Tilt Steering Wheel
  • Tilt and telescopic steering wheel
  • Tire Pressure Monitoring System: Tire specific
  • Tires: Prefix: P
  • Tires: Profile: 60
  • Tires: Speed Rating: S
  • Tires: Width: 275 mm
  • Total Number of Speakers: 9
  • Traction Control
  • Trailer hitch
  • Transmission hill holder
  • Trip computer
  • Tumble forward rear seats
  • Type of tires: AT
  • Universal Home Remote
  • Variable intermittent front wipers
  • Variably Intermittent Wipers
  • Vehicle Emissions: LEV3-ULEV50
  • Vertical Cargo Net (Lpo)
  • Video Monitor Location: Front
  • Voltmeter
  • Wheel Diameter: 20
  • Wheel Width: 9
  • Wheelbase: 120.9"
  • Wheels: 20 X 9 Machined Aluminum
  • Wireless Charging

Vehicle history by CARFAX

Accidents or damage
At least 1 accident or damage reported
1-owner vehicle
No
Personal use only
Yes
The vehicle history information is supplied by third parties. Cars.com and the Seller are not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Please see Cars.com Terms and Conditions for further information.

Seller’s info

Webb Chevy Plainfield

(966 reviews)
16140 S Lincoln Hwy, Plainfield, IL 60586

Seller’s notes about this car

2022 Chevrolet Tahoe Z71 Summit White EcoTec3 5.3L V8 4WD This vehicle is nicely equiped with..., Backup Camera, Bluetooth/Handsfree, Remote Start, Carfax 1-Owner, 10-Way Power Driver & Passenger Seat Adjusters, 1st & 2nd Row Color-Keyed Carpeted Floor Mats, 2-Speed Active Electronic AutoTrac Transfer Case, 2nd Row Pwr Release 60/40 Split-Folding Bench Seat, 3rd Row 60/40 Power-Folding Split-Bench Seat, Advanced Trailering Package, Auto-Dimming Inside Rear-View Mirror, Automatic Stop/Start, Black Tubular Assist Steps, Bose 9-Speaker Stereo Audio System Feature, Bright Front & Rear Door Sill Plates, Color-Keyed Carpeting Floor Covering, Driver & Front Outboard Passenger Airbags, Driver Alert Package, Enhanced Driver Information Center, Extra Capacity Cooling System, Floor Console w/Storage Area, Front dual zone A/C, Front High-Approach Angle Fascia, Hands-Free Rear Power Programmable Liftgate, HD Surround Vision, Heated 2nd Row Outboard Seats, Heated Driver & Front Passenger Seats, Heated Steering Wheel, Hill Descent Control, Hitch Guidance w/Hitch View, Infotainment Display, Integrated Trailer Brake Controller, Lane Change Alert w/Side Blind Zone Alert, Leather-Wrapped Steering Wheel, LED Daytime Running Lamps, Luxury Package, Max Trailering Package, Memory Settings, Memory Settings for Driver, Navigation System, Outside Heated Power-Adjustable Mirrors, Power Liftgate, Power Tilt & Telescopic Steering Column, Preferred Equipment Group 2Z7, Rain sensing wipers, Rear Cross Traffic Alert, Rear Pedestrian Alert, Red Horizontal-Mounted Recovery Hooks, Remote Start, SiriusXM Radio w/360L, Smart Trailer Integration Indicator, Start/Stop System Disable Button, Universal Home Remote, Wireless Charging. Awards: ALG Residual Value Webb Chevy Plainfield goes the extra mile for you! Conveniently located on Rt. 30 just west of I-55 in Plainfield, we primarily serve Joliet, Crest Hill, Bolingbrook, Channahon, and Aurora. Webb Chevy Plainfield is a new and used car dealership located on Rt. 30 in Plainfield, IL. Webb Chevrolet Plainfield carries a large selection of new, used, and certified pre-owed cars, trucks, SUVs, and vans. We carry Acura, Alfa Romeo, Audi, BMW, Buick, Cadillac, Chevrolet, Chrysler, Dodge, Fiat, Ford, Genesis, GMC, Honda, Hyundai, INFINITI, Jaguar, Jeep, KIA, Land Rover, Lexus, Lincoln, Mazda, Mercedes-Benz, Mitsubishi, Nissan, RAM, Scion, Subaru, Toyota, Volkswagen, and Volvo. Financing and leasing options available. The features and options listed are for a New 2022 Tahoe and may not apply to this specific vehicle.
Thank you for your interest in a vehicle from Webb Chevrolet Plainfield. In addition to our massive inventory of new Chevrolet cars and trucks, we have hundreds used cars, trucks, and vans in stock, many still under factory warranty! We will not be undersold! Contact Sales at Webb Chevrolet Plainfield 888-8939439. See why, "THE WHOLE TOWN'S TALKIN ABOUT THE WEBB BOYS"!!!

Have a question?

Get answers, see the car, or find a good time for a test drive. Take the next step and contact the seller.

Contact seller

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your payment

Based on est. car price of $51,874 at ...% APR* and ...% sales tax.
$... per month
Car price
$51,874
Down payment
-Not Priced
Trade-in value
-Not Priced
Estimated sales tax ...%
(based on ZIP)
+
Other fees*
Not included
Total loan amount
Total interest paid
(over life of loan)
+
Total loan & interest paid
Monthly payment
Ad
Estimate trade-in
Estimate trade-in
Get prequalified

Not all customers will qualify. All decisions related to submission of consumer’s credit application, assignment of financing agreement, and available lenders are at sole discretion of the dealer. Cars.com is not an automobile dealer or a lender, and will not render a credit decision.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Ad

Consumer reviews

See what others are saying about the 2022 Chevrolet Tahoe.
(5 reviews)
Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 4.6
  • Performance 5.0
  • Value 5.0
  • Exterior 4.8
  • Reliability 5.0

Most recent consumer reviews

2022 Tahoe RST

I traded my 2021 BMW M8 Competition. What a change! I love the fact that my RST is Dark Ash Grey with little hue of purple in direct sunlight. Absolutely stunning. Performance when needed, can haul whole family in comfort, amenities and useful space, nice not too flashy styling with 22" black rims, and most importantly, I can put regular unleaded at any gas station! Long way Chevrolet have come with Tahoe. Great improvement in reliability and styling. I prefer this over GMW Yukon or Cadillac Escalade.

Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 5.0
  • Performance 5.0
  • Value 5.0
  • Exterior 5.0
  • Reliability 5.0
  • Purchased a Used car
  • Used for Commuting
  • Does recommend this car
5 people out of 5 found this review helpful. Did you?
Yes No

diesel

I bought a 2022 Tahoe RST with a 3.0 diesel engine absolulity love it comfort style handling plenty of power and MPG is city 27 highway 32 with a max MPG of 37 Anyone on the fence of getting the diesel engine My opinion its well worth investment

Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 4.0
  • Performance 5.0
  • Value 5.0
  • Exterior 5.0
  • Reliability 5.0
  • Purchased a New car
  • Used for Commuting
  • Does recommend this car
1 person out of 3 found this review helpful. Did you?
Yes No

Imported from Detroit

My 2022 RST w/ the 6.2 and 22" all black rims is a head turner. I traded a 2021 BMW X7 because my teens needed more leg room behind their 6'2" dad. What I gave up in luxury, I gained in good ole Merica v-8 Detroit rumble. The utility of this SUV is 2nd to none. Build quality in Merica is back. Thanks GM the bailout was well worth it.

Rating breakdown (out of 5):
  • Comfort 5.0
  • Interior 4.0
  • Performance 5.0
  • Value 5.0
  • Exterior 4.0
  • Reliability 5.0
  • Purchased a New car
  • Used for Transporting family
  • Does recommend this car
6 people out of 7 found this review helpful. Did you?
Yes No
See all 5 consumer reviews

Similar cars at this dealership

Chevrolet Certified
2023 Chevrolet Tahoe Z71
59,165 mi.
$55,130 $600 price drop
Used
2021 Chevrolet Tahoe RST
64,804 mi.
$46,910 $705 price drop
New
2025 Chevrolet Suburban Premier
$78,185 $600 price drop
Chevrolet Certified
2024 Chevrolet Traverse Z71
11,368 mi.
$46,477 $300 price drop
Ad

Car shopper resources

Cars.com Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; Cars.com is not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Click here for more details.

Bluetooth® is a registered mark of Bluetooth® SIG, Inc. Android Auto™ is a trademark of Google LLC. Apple CarPlay® is a registered trademark of Apple Inc. Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, Germany.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

Call
Check availability

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

  • Want to sell or trade-in your car fast? Get a free Instant Offer from local dealers.
  • Tell us about your car and get a free Instant Offer within minutes.
  • Schedule a car inspection with the dealer.
  • Use your Instant Offer to trade-in your car.
Get your Instant Offer