-
12V power outlets 2 12V power outlets
-
14 Speakers
-
2-Way Power Driver Lumbar Control Seat Adjuster
-
2-Way Power Passenger Lumbar Control Seat Adjuster
-
2.0L Turbo 4-Cylinder SIDI Engine
-
3-point seatbelt Rear seat center 3-point seatbelt
-
3.47 Axle Ratio
-
4-Wheel Disc Brakes
-
4-Wheel Independent Suspension
-
4WD type Part and full-time AWD
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
ABS brakes
-
AM/FM radio: SiriusXM
-
Accessory power Retained accessory power
-
Air Conditioning
-
Air conditioning Yes
-
All Wheel Drive
-
All-in-one key All-in-one remote fob and ignition key
-
Alloy wheels
-
Alternator Type Alternator
-
Ambient lighting
-
Amplifier Premium grade amplifier
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Armrests front center Front seat center armrest
-
Armrests rear Rear seat center armrest
-
Audio memory
-
Auto High-beam Headlights
-
Auto door locks Auto-locking doors
-
Auto headlights Twilight Sentinel auto on/off headlight control
-
Auto high-beam headlights IntelliBeam auto high-beam headlights
-
Auto-dimming Rear-View mirror
-
Auto-dimming door mirror driver Auto-dimming driver side mirror
-
Auto-dimming door mirrors
-
Automatic Dual-Zone Climate Control
-
Automatic Emergency Braking
-
Automatic Stop/Start w/Disable
-
Automatic temperature control
-
Aux input jack Auxiliary input jack
-
Backup Camera
-
Basic warranty 48 month/50,000 miles
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Blind Spot Monitor
-
Blind spot Lane Change Alert with Side Blind Zone Alert blind spot warning
-
Body panels Galvanized steel/aluminum body panels with side impact beams
-
Bodyside cladding Black bodyside cladding
-
Bodyside moldings
-
Bodyside moldings Aluminum bodyside moldings
-
Bose Performance Series 14-Speaker System
-
Brake Assist
-
Brake assist
-
Brake assist system
-
Brake type 4-wheel disc brakes
-
Bulb warning Bulb failure warning
-
Bumper insert Aluminum front and rear bumper inserts
-
Bumpers front Body-colored front bumper
-
Bumpers rear Black rear bumper
-
Bumpers: body-color
-
Cabin air filter
-
Capless fuel filler
-
Cargo access Proximity cargo area access release
-
Cargo cover Roll-up cargo cover
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo rail Cargo rail system
-
Cargo tie downs Cargo area tie downs
-
Child door locks Manual rear child safety door locks
-
Climate control Automatic climate control
-
Clock In-radio display clock
-
Compass
-
Compressor Intercooled turbo
-
Concealed cargo storage Cargo area concealed storage
-
Corrosion perforation warranty 72 month/unlimited
-
Cruise control Cruise control with steering wheel mounted controls
-
Cylinder head material Aluminum cylinder head
-
Day/Night rearview mirror
-
Delay off headlights Delay-off headlights
-
Delay-off headlights
-
Digital signal processor Bose Performance Series digital signal processor
-
Distance alert Following Distance Indicator
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Chrome door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Body-colored door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirror with tilt-down in reverse Power driver and passenger door mirror…
-
Door panel insert Genuine wood and metal-look door panel insert
-
Door trim insert Leatherette door trim insert
-
Drive type All-wheel drive
-
Driver door bin
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 2-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Driver selectable steering effort Driver Mode Control driver selectable stee…
-
Driver vanity mirror
-
Drivetrain selectable Drivesense driver selectable drivetrain mode
-
Dual Climate Control
-
Dual Driver Info Center Display Gauge Cluster
-
Dual front impact airbags
-
Dual front side impact airbags
-
Dual-zone front climate control
-
Electronic Stability Control
-
Electronic parking brake
-
Electronic stability control StabiliTrak electronic stability control system…
-
Emergency SOS OnStar and Cadillac connected services capable vehicle integra…
-
Emergency communication system: OnStar and Cadillac connected services capab…
-
Emissions LEV3-ULEV50 emissions
-
Emissions tiers Tier 3 Bin 50 emissions
-
Engine 2L I-4 gasoline direct injection, DOHC, variable valve control, inter…
-
Engine Cylinders I4
-
Engine Location Front mounted engine
-
Engine Mounting direction Transverse mounted engine
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gage
-
Equalizer Automatic audio equalizer
-
External memory External memory control
-
First-row sunroof First and second-row sliding and tilting glass sunroof wit…
-
First-row windows Power first-row windows
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Floor mats Carpet front and rear floor mats
-
Fob engine controls Smart key with hands-free access and push button start
-
Fob remote vehicle controls Smart device and keyfob engine start control
-
Fob window controls Keyfob window control
-
Folding door mirrors Power folding door mirrors
-
Folding rear seats 60-40 folding rear seats
-
Fore and aft rear seat Rear seats with manual fore and aft
-
Forward collision warning Enhanced Automatic Emergency Braking forward colli…
-
Four wheel independent suspension
-
Front & Rear Park Assist
-
Front Bucket Seats
-
Front Center Armrest
-
Front anti-roll Front anti-roll bar
-
Front anti-roll bar
-
Front beverage holders
-
Front cornering lights
-
Front dual zone A/C
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front passenger lumbar Front passenger seat with 2-way power lumbar
-
Front reading lights
-
Front seat upholstery Leather front seat upholstery
-
Front seatback upholstery Plastic front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Fuel Type Premium Unleaded
-
Fuel door lock Power fuel door lock
-
Fully automatic headlights
-
Gage cluster display size (inches) Gage cluster display size: 5.70
-
Garage door opener
-
Garage door transmitter
-
Gearshifter material Urethane gear shifter material
-
Genuine wood dashboard insert
-
Genuine wood door panel insert
-
Glove box Illuminated locking glove box
-
Grille style Chrome grille
-
HD Rear Vision Camera
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Head-Up Display
-
Headlight type Projector beam headlights
-
Headlights LED low and high beam headlights
-
Headlights on reminder
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated Driver & Front Passenger Seats
-
Heated Seats
-
Heated Steering Wheel
-
Heated door mirrors
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated front seats
-
Heated front seats Heated driver and front passenger seats
-
Heated steering wheel
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill start assist
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated glove box
-
Illuminated ignition switch
-
Immobilizer
-
Inside Rear-View Auto-Dimming Mirror
-
Instrumentation display Analog instrumentation display
-
Integrated navigation Integrated navigation system with voice activation
-
Interior accents Metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet access Wi-Fi Hotspot capable mobile hotspot internet access
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob door locks Keyfob activated door locks
-
Keyless Entry
-
Keyless Start
-
Knee airbag
-
Knee airbag Driver side knee airbag
-
LED brake lights
-
Laminated window Laminated side window glass
-
Lane Departure Warning
-
Lane departure Lane Keep Assist
-
Leather Seating Surfaces w/Mini Perforated Inserts
-
Leather Seats
-
Lock-up transmission
-
Locking hub control Auto locking hub control
-
Low level warnings Low level warning for oil, fuel, washer fluid and brake f…
-
Low tire pressure warning
-
Low tire pressure warning Tire specific low air pressure warning
-
Maintenance warranty 12 month/unlimited
-
Memory Seat
-
Memory seat
-
Memory settings Memory settings include: door mirrors, steering wheel and au…
-
Mobile app access MyCadillac Mobile App mobile app access
-
Navigation System
-
Noise cancellation Active noise cancellation
-
Number of airbags 7 airbags
-
Number of beverage holders 4 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Number of memory settings 2 memory settings
-
Occupancy sensor Airbag occupancy sensor
-
Occupant sensing airbag
-
Oil pressure gage
-
Oil pressure warning
-
Oil temperature gage
-
One-touch down window Front and rear one-touch down windows
-
One-touch up window Driver and passenger one-touch up windows
-
Outside temperature display
-
Over the air updates
-
Overdrive transmission
-
Overhead airbag
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console
-
Overhead console Mini overhead console
-
Overhead console storage
-
Paint Metallic paint
-
Panel insert Genuine wood and metal-look instrument panel insert
-
Panic alarm
-
Parking Assist
-
Parking sensors Automatic Parking Assist front and rear parking sensors
-
Passenger door bin
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 8-way directional control…
-
Passenger vanity mirror
-
Pedestrian detection Front Pedestrian Braking
-
Perimeter approach lighting Remote activated perimeter approach lighting
-
Power Driver Seat
-
Power Liftgate
-
Power door mirrors
-
Power driver seat
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Power moonroof: UltraView
-
Power passenger seat
-
Power passenger seat controls Passenger seat power reclining, lumbar support…
-
Power steering
-
Power windows
-
Powertrain type ICE
-
Powertrain warranty 72 month/70,000 miles
-
Primary display size 8 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
RDS Radio data system (RDS)
-
Radiator
-
Radio AM/FM/SiriusXMsatellite
-
Radio data system
-
Radio: Cadillac User Experience w/Embedded Nav
-
Rain Sensing Front Wipers
-
Rain detecting wipers Rainsense rain detecting wipers
-
Rain sensing wipers
-
Real time traffic Real-time traffic
-
Real time weather Real-time weather
-
Rear Cross Traffic Alert
-
Rear Spoiler
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear anti-roll bar
-
Rear bench seats Split-bench rear seat
-
Rear camera HD Rear Vision Camera rear mounted camera
-
Rear cargo door Power liftgate rear cargo door
-
Rear collision warning Rear Cross Traffic Alert collision warning
-
Rear console climate control ducts
-
Rear head restraint control 2 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear reading lights
-
Rear seat center armrest
-
Rear seat check warning
-
Rear seat direction Front facing rear seat
-
Rear seat folding position Fold forward rear seatback
-
Rear seat upholstery Leather rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats fixed or removable Fixed rear seats
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear window wiper
-
Rear windshield Fixed rear windshield
-
Rear windshield wipers Fixed interval rear windshield wipers
-
Rearview mirror Auto-dimming rear view mirror
-
Reclining rear seats Manual reclining rear seats
-
Remote keyless entry
-
Remote panic alarm
-
Restricted driving mode Teen Driver restricted driving mode
-
Roadside warranty 72 month/70,000 miles
-
Roof rails
-
Running lights LED daytime running lights
-
Satellite trial 3 month satellite trial subscription
-
Seatback storage pockets 2 seatback storage pockets
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seating capacity 5
-
Second-row windows Power second-row windows
-
Security system
-
Seek scan
-
Selectable mode transmission Drivesense selectable mode transmission
-
Sequential shift control Sequential shift with steering wheel controls
-
Service interval warning Service interval indicator
-
Shock absorbers Gas-pressurized shock absorbers
-
Shutters Active grille shutters
-
SiriusXM w/360L Trial Subscription
-
Smart device integration Smart device wireless mirroring
-
Spare tire Compact spare tire with steel wheel
-
Spare tire location Spare tire mounted under the cargo floor
-
Speakers Bose Performance Series speakers
-
Speakers number 14 speakers
-
Special paint Monotone paint
-
Speed control
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Speed-sensing steering
-
Speedometer Redundant digital speedometer
-
Split folding rear seat
-
Split front seats Bucket front seats
-
Spoiler
-
Spoiler Rear lip spoiler
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Start-stop engine Auto stop-start engine
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering type number of wheels 2-wheel steering system
-
Steering wheel material Leatherette steering wheel
-
Steering wheel memory
-
Steering wheel mounted audio controls
-
Steering wheel telescopic Power telescopic steering wheel
-
Steering wheel tilt Power tilting steering wheel
-
Sunroof/Moonroof
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailgate control Tailgate/power door lock
-
Tailpipe Stainless steel quasi-dual exhaust with chrome tailpipe finisher
-
Teen Driver
-
Telescoping steering wheel
-
Temperature display Exterior temperature display
-
Third-row windows Fixed third-row windows
-
Tilt steering wheel
-
Tinted windows Deep tinted windows
-
Tires P235/55HR20 AS BSW front and rear tires
-
Towing trailer sway Trailer sway control
-
Traction Control
-
Traction control
-
Traction control All-speed ABS and driveline traction control
-
Transfer case Electronic transfer case shift
-
Transmission 9-speed automatic
-
Transmission Type Automatic
-
Transmission electronic control
-
Transmission oil cooler
-
Trip computer
-
Trip odometer
-
Trunk hatch Trunk/hatch auto-latching
-
Trunk lid trim Plastic trunk lid trim
-
Turbocharged
-
Turn signal in door mirrors Turn signal indicator in door mirrors
-
Turn signal indicator mirrors
-
Turn signal warning Turn signal on warning
-
Turn-by-turn nav Turn-by-turn navigation system
-
USB Port
-
USB ports 4 USB ports
-
Valet key
-
Variable panel light Variable instrument panel light
-
Variably intermittent wipers
-
Vehicle tracker Stolen Vehicle Assistance vehicle tracker with vehicle slowd…
-
Ventilated brakes Front and rear ventilated disc brakes
-
Visor driver expandable coverage Driver visor with expandable coverage
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger expandable coverage Passenger visor with expandable coverage…
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Voice activated audio controls
-
Voltmeter
-
WIFI Hotspot
-
Wheel locks Wheel security locks
-
Wheel well trim Body-colored wheel well trim
-
Wheels 20 x 8-inch front and rear black aluminum wheels
-
Wheels: 20in 6-Split Spoke Alloy
-
Window Trim Aluminum side window trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless Apple CarPlay/Wireless Android Auto
-
Wireless Phone Charging
-
Wireless device charging Front wireless smart device charging
-
Wireless streaming Wireless audio streaming