Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

New and used 2025 Chevrolet Colorado trucks for sale near Clarkson Valley, MO

Filters 5 Year Trim Model Price & payment Make Mileage Body style Ext. color All filters
57 matches 30 miles from 63011
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: U25458
VIN: 1GCPTCEKXS1223192

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Jim Trenary Chevrolet Buick GMC review

New car purchase

Our salesman Adrian Chambers was the highlight of our car buying experience at Jim Trenary of Union Missouri

Vehicle information

Ext. color: Black
Int. color: Jet Black/Adrenaline Red
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 195938
VIN: 1GCPTDEK7S1195938

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jim Butler Chevrolet review

Great atmosphere and Mike did an awesome job helping with

Great atmosphere and Mike did an awesome job helping with the purchase of my vehicle, I would recommend Jim Butler of Fenton ,MO to anyone looking to purchase a vehicle, thanks Mike

Vehicle information

Ext. color: Black
Int. color: Jet Black/Artemis
Drivetrain: Four-wheel Drive
MPG: 17-20
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbocharged Gas I4 2.7L/
Stock #: 2579560
VIN: 1GCPTFEKXS1209259

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Backup Camera, Blind Spot Monitor, Lane Departure Warning, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Elco Chevrolet & Cadillac review

The only disappointment was I scheduled an appt and was

The only disappointment was I scheduled an appt and was there on time yet still had to wait for 2 hours to get my car finished. Service advisor was awesome tho and kept us up to date on the progress. Overall great experience not he work that was done.

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Jet Black/Adrenaline Red
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: C196361
VIN: 1GCPTDEK5S1196361

Features

Convenience: Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jim Butler Chevrolet review

I was served well by my salesman James Willis, He was

I was served well by my salesman James Willis, He was very friendly, helpful and he took the time to explain the process and was so helpful in explaining all of the different versions of the Silverado. I am very grateful to all of the assistance he provided me and I am so happy with my purchase. Will definitely be referring my friends to your dearship,

Vehicle information

Ext. color: Summit White / White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: U25461
VIN: 1GCPTEEK4S1223314

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Jim Trenary Chevrolet Buick GMC review

Ryan did a GREAT job as did everyone else.

Purchased a 20yr old Nissan from Ryan, he and the team there gave me as much information and the condition of the vehicle as was possible based on the age and of course based on the age the car does have its issues which I had expected, but Ryan did a great job of working things out and as I arrived really late he and the necessary people to finish a deal were there and ready to help. I picked the car up the next morning with a full tank of gas ready for my 300 mile trip home. They gave me a great deal on the vehicle, far below what they were asking all said and done out the door.

Vehicle information

Ext. color: Black
Int. color: Jet Black/Adrenaline Red, Perforated Leather-Appointed Front Sea
Drivetrain: Four-wheel Drive
MPG: 18-22
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 255524
VIN: 1GCPTDEK4S1235635

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Memory Seat

Reviews

Sapaugh GM Country review

COULDNT ASK FOR BETTER SERVICE, GO SEE JOHN IN SERVICE TO

COULDNT ASK FOR BETTER SERVICE, GO SEE JOHN IN SERVICE TO GO ABOVE AND BEYOND YOUR NEEDS

Vehicle information

Ext. color: Snowdrift Metallic
Int. color: Jet Black/Adrenaline Red
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: T18986
VIN: 1GCPTDEK1S1156732

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Weber Chevrolet Creve Coeur review

Good communication about the work I needed done and how

Good communication about the work I needed done and how much it would cost. Fast work.

Vehicle information

Ext. color: Black
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-22
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbocharged Gas I4 2.7L/
Stock #: V578580
VIN: 1GCPTEEK2S1187963

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Backup Camera, Blind Spot Monitor, Lane Departure Warning, Stability Control

Reviews

Elco Chevrolet & Cadillac review

This is the fourth vehicle that we've purchased from ELCO

This is the fourth vehicle that we've purchased from ELCO Chevrolet, and there is a reason that I returned for my third Tahoe: they're the very best. Three weeks ago, I lost my husband unexpectedly and with two ELCO Chevy's, one 10 yr old Tahoe and a two-year-old Trailblazer that my children didn't want I felt it best to combine the trade-ins and purchase a new Tahoe that will take me another 10 years, providing me not only transportation but the security I need moving forward. The staff at ELCO were respectful, kind, understanding, and efficient. The purchasing experience was excellent from start to finish, and they took every step to make me feel like I was the only person in the dealership those two days. I am very grateful to Mark Gerecke and Branden Nehls for all they did to make the process as easy and comforting as possible given the circumstances. I am an ELCO customer for life.

Vehicle information

Ext. color: Summit White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 17-20
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbocharged Gas I4 2.7L/
Stock #: V578310
VIN: 1GCPTEEK0S1176346

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Backup Camera, Blind Spot Monitor, Lane Departure Warning, Stability Control

Reviews

Elco Chevrolet & Cadillac review

Joe is great as well as all the people I interacted with

Joe is great as well as all the people I interacted with at the dealership. They all were very friendly and professional. I appreciate Joe getting me the best deal possible with this being a second car loan.

Vehicle information

Ext. color: Summit White
Int. color: Jet Black/Artemis, Perforated Leather-Appointed Front Seat Trim
Drivetrain: Four-wheel Drive
MPG: 17-20
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 255491
VIN: 1GCPTFEK9S1218857

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Sapaugh GM Country review

As a woman who honestly knows nothing about cars, I was

As a woman who honestly knows nothing about cars, I was nervous that I was going to be conned into things I didn’t need. I was lucky enough to have Mike help me who was extremely professional, friendly, and explained in detail what I needed now and suggestions for services repairs that were not needed immediately. I never felt pressured but ended up doing everything. There is no other dealership I will use in the future!

Vehicle information

Ext. color: Summit White / White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: U25506
VIN: 1GCPTCEK5S1240286

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Jim Trenary Chevrolet Buick GMC review

My new vehicle

The team really took the time to help me figure out exactly which vehicle was meant for me! They all worked very hard to find my best deal for me, I am loving my choice!!!

Vehicle information

Ext. color: Summit White
Int. color: Jet Black/Artemis
Drivetrain: Four-wheel Drive
MPG: 17-20
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: F251099
VIN: 1GCPTFEK9S1241426

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jim Trenary Chevrolet review

Friendly, no hassle sales at Jim Trenary Chevrolet

Brett was able to locate a hard to find vehicle for me at a great price. No hassles.

Vehicle information

Ext. color: Snowdrift Metallic
Int. color: Jet Black, Cloth Seat Trim
Drivetrain: Rear-wheel Drive
MPG: 20-24
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 255421R
VIN: 1GCPSBEK2S1188533

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Sapaugh GM Country review

Conan Thomas was my service advisor and the service was

Conan Thomas was my service advisor and the service was excellent. Took care of everything and made this service call as easy for me as possible. I will always go back to Sapaugh.

Vehicle information

Ext. color: Radiant Red Tintcoat
Int. color: Jet Black/Adrenaline Red
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: T19506
VIN: 1GCPTDEK9S1244539

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Weber Chevrolet Creve Coeur review

Our salesman, Ben Vogt worked with the Sales Manager,

Our salesman, Ben Vogt worked with the Sales Manager, Steve Weis to give us acceptable offer for our trade in.

Vehicle information

Ext. color: Radiant Red Tintcoat
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: T19249
VIN: 1GCPTEEK5S1204853

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Weber Chevrolet Creve Coeur review

Car shopping at Weber (Richard Rukavina) was probably the

Car shopping at Weber (Richard Rukavina) was probably the best car buying experience I've had. He was thoughtful and friendly - none of those old car salesman tactics - and so easy to work with. I'll definitely be reaching out to Weber again for my next car purchase. The finance person was also fantastic.

Vehicle information

Ext. color: Red
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: T250900
VIN: 1GCPTBEK9S1241242

Features

Convenience: Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

George Weber Chevrolet Columbia review

Drew Shoemaker helped streamline the process, and got me

Drew Shoemaker helped streamline the process, and got me the best deal I could possibly get- a new experience for me, but one I’m grateful Mr. Shoemaker was there to assist with the purchase, and get me in my new vehicle!

Vehicle information

Ext. color: Metallic White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: U25507
VIN: 1GCPTCEK8S1240508

Features

Convenience: Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Jim Trenary Chevrolet Buick GMC review

I was working with this dealership back in September 2024

I was working with this dealership back in September 2024 and was looking for a traverse In within two days of asking, John Cushman found the traverse with everything in the exact color I wanted. I looked all over Columbus for it and couldn’t find it. He bent over backwards to help me now we are going to look for a 2025 new truck And I’m sure we will have him look around and find the truck that we want since he was so helpful with finding us our traverse. Can’t wait till spring, so I can come back there again and check out your line of trucks. Even after I got home, I called him several times and asked questions where to find this or that and he answered me promptly that same day. See John in the spring 😍

There are additional matching cars outside your search area.

Sorted by premium dealers first

Partial matches are generated by applying your search criteria to a larger search area. Our goal is to help you discover additional cars that match your search preferences.

As a benefit to some of our dealer customers, we display their listings first.

Vehicle information

Ext. color: Summit White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: P189
VIN: 1GCPTDEK9S1236411

Features

Convenience: Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-22
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 7562A
VIN: 1GCPTEEK6S1207339

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: S241
VIN: 1GCPTEEK7S1244898

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Summit White
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: GM128229
VIN: 1GCPTBEK0S1128229

Features

Convenience: Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Summit White
Int. color: Jet Black
Drivetrain: Rear-wheel Drive
MPG: 20-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: 186890
VIN: 1GCPSBEK5S1186890

Features

Convenience: Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Black
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: 155453
VIN: 1GCPTDEK3S1155453

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Vehicle information

Ext. color: Black
Int. color: Jet Black/Adrenaline Red
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: 38376
VIN: 1GCPTDEK2S1195037

Features

Convenience: Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: TurboMax 2.7L I-4 gasoline direct injection, DOHC, variable valv
Stock #: Z0528
VIN: 1GCPTCEK9S1231168

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Summit White
Int. color: Jet Black
Drivetrain: Rear-wheel Drive
MPG: 20-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: N25210
VIN: 1GCPSBEK1S1208383

Features

Convenience: Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Vehicle information

Ext. color: Sterling Gray Metallic
Int. color: Black
Drivetrain: Four-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.7L I4 16V GDI DOHC Turbo
Stock #: 184571
VIN: 1GCPTBEK5S1184571

Features

Convenience: Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Chevrolet Colorado prices by year

Model year Prices from Deals
2026 Chevrolet Colorado $31,445

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

57 matches Clear
Clear
Basics
Chevrolet models
Colorado trims
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only

Research the 2025 Chevrolet Colorado

Compare the 2025 Chevrolet Colorado

2025 Chevrolet Colorado Trucks by city

[{"applied_filter_criteria":"{\"bodystyle\":[\"truck\"],\"cpo_indicator\":true,\"make_model_trim\":[{\"make\":\"chevrolet\",\"model\":\"colorado\"}],\"max_year\":\"2025\",\"min_year\":\"2025\",\"search_range\":\"30\",\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"all\"}","search_type":"general-inventory-search","vehicle_array":[{"badges":["american_made_index_ranking"],"listing_id":"d7d45af6-4e29-40ba-a132-4337fa1a1561","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"180872","canonical_mmty":"Chevrolet:Colorado:LT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"LT","cat":"truck_compact","stock_sub":"","mileage":"1","sponsored_type":"standard","dealer_zip":"63084","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Jim Trenary Chevrolet Buick GMC","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:LT","stock_type":"New","price":"40315","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"43365","vin":"1GCPTCEKXS1223192","vertical_position":1,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"5bb1f850-4bb0-4137-8c6f-87239c8cfd5c","interior_color":"Jet Black/Adrenaline Red","cpo_indicator":false,"bodystyle":"Truck","customer_id":"190822","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"3","sponsored_type":"standard","dealer_zip":"63026","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Jim Butler Chevrolet","year":"2025","photo_count":24,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"50140","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"53390","vin":"1GCPTDEK7S1195938","vertical_position":2,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"727e86d2-485f-4788-8693-204f873eb785","interior_color":"Jet Black/Artemis","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19459","canonical_mmty":"Chevrolet:Colorado:4WD ZR2:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"4WD ZR2","cat":"truck_compact","stock_sub":"","mileage":"5","sponsored_type":"standard","dealer_zip":"63011","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Elco Chevrolet & Cadillac","year":"2025","photo_count":20,"canonical_mmt":"Chevrolet:Colorado:4WD ZR2","stock_type":"New","price":"48564","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"54064","vin":"1GCPTFEKXS1209259","vertical_position":3,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"5cfdc2f8-b0e5-4c2b-b27b-57f5f6c5b965","interior_color":"Jet Black/Adrenaline Red","cpo_indicator":false,"bodystyle":"Truck","customer_id":"190822","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"3","sponsored_type":"standard","dealer_zip":"63026","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Jim Butler Chevrolet","year":"2025","photo_count":25,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"44590","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"47840","vin":"1GCPTDEK5S1196361","vertical_position":4,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"c0fade83-41e8-43a9-972b-f0a99a2c9784","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"180872","canonical_mmty":"Chevrolet:Colorado:Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"1","sponsored_type":"standard","dealer_zip":"63084","exterior_color":"Summit White / White","fuel_type":"Gasoline","dealer_name":"Jim Trenary Chevrolet Buick GMC","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:Trail Boss","stock_type":"New","price":"45115","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"49015","vin":"1GCPTEEK4S1223314","vertical_position":5,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"4a403e34-4d91-4087-ba83-78d6804224d8","interior_color":"Jet Black/Adrenaline Red, Perforated Leather-Appointed Front Sea","cpo_indicator":false,"bodystyle":"Truck","customer_id":"151905","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"4","sponsored_type":"standard","dealer_zip":"63048","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Sapaugh GM Country","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"45563","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"49873","vin":"1GCPTDEK4S1235635","vertical_position":6,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"7776d56c-410c-4d77-9210-9882d3f6f510","interior_color":"Jet Black/Adrenaline Red","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19576","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"5","sponsored_type":"standard","dealer_zip":"63141","exterior_color":"Snowdrift Metallic","fuel_type":"Gasoline","dealer_name":"Weber Chevrolet Creve Coeur","year":"2025","photo_count":19,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"42490","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"47490","vin":"1GCPTDEK1S1156732","vertical_position":7,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["price_drop_in_cents","american_made_index_ranking"],"listing_id":"ba7bf963-75fb-4117-8f13-7b9e0cca729c","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19459","canonical_mmty":"Chevrolet:Colorado:4WD Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"4WD Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"4926","sponsored_type":"standard","dealer_zip":"63011","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Elco Chevrolet & Cadillac","year":"2025","photo_count":20,"canonical_mmt":"Chevrolet:Colorado:4WD Trail Boss","stock_type":"New","price":"39339","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"43339","vin":"1GCPTEEK2S1187963","vertical_position":8,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["price_drop_in_cents","american_made_index_ranking"],"listing_id":"c6611e7c-008b-4d6b-8116-62e470f97777","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19459","canonical_mmty":"Chevrolet:Colorado:4WD Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"4WD Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"4683","sponsored_type":"standard","dealer_zip":"63011","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Elco Chevrolet & Cadillac","year":"2025","photo_count":20,"canonical_mmt":"Chevrolet:Colorado:4WD Trail Boss","stock_type":"New","price":"42289","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"46289","vin":"1GCPTEEK0S1176346","vertical_position":9,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"d1658540-5c99-4052-9646-a705677022d4","interior_color":"Jet Black/Artemis, Perforated Leather-Appointed Front Seat Trim","cpo_indicator":false,"bodystyle":"Truck","customer_id":"151905","canonical_mmty":"Chevrolet:Colorado:ZR2:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"ZR2","cat":"truck_compact","stock_sub":"","mileage":"4","sponsored_type":"standard","dealer_zip":"63048","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Sapaugh GM Country","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:ZR2","stock_type":"New","price":"50077","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"54663","vin":"1GCPTFEK9S1218857","vertical_position":10,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"c9134968-9272-43bb-8ca0-a814dab86a03","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"180872","canonical_mmty":"Chevrolet:Colorado:LT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"LT","cat":"truck_compact","stock_sub":"","mileage":"1","sponsored_type":"standard","dealer_zip":"63084","exterior_color":"Summit White / White","fuel_type":"Gasoline","dealer_name":"Jim Trenary Chevrolet Buick GMC","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:LT","stock_type":"New","price":"41410","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"44460","vin":"1GCPTCEK5S1240286","vertical_position":11,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"830dcb16-be54-49b5-ad37-071cf834b3d9","interior_color":"Jet Black/Artemis","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19581","canonical_mmty":"Chevrolet:Colorado:ZR2:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"ZR2","cat":"truck_compact","stock_sub":"","mileage":"17","sponsored_type":"standard","dealer_zip":"63368","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Jim Trenary Chevrolet","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:ZR2","stock_type":"New","price":"49570","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"53820","vin":"1GCPTFEK9S1241426","vertical_position":12,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"7e83bb57-cad8-44dc-97ec-3afd0dee3ff1","interior_color":"Jet Black, Cloth Seat Trim","cpo_indicator":false,"bodystyle":"Truck","customer_id":"151905","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"1500","sponsored_type":"standard","dealer_zip":"63048","exterior_color":"Snowdrift Metallic","fuel_type":"Gasoline","dealer_name":"Sapaugh GM Country","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"37108","make":"Chevrolet","drivetrain":"Rear-wheel Drive","relevancy_score":null,"msrp":"35260","vin":"1GCPSBEK2S1188533","vertical_position":13,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"4e3f44b9-9248-44c8-b185-fbc8272616f9","interior_color":"Jet Black/Adrenaline Red","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19576","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"2","sponsored_type":"standard","dealer_zip":"63141","exterior_color":"Radiant Red Tintcoat","fuel_type":"Gasoline","dealer_name":"Weber Chevrolet Creve Coeur","year":"2025","photo_count":21,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"42590","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"47090","vin":"1GCPTDEK9S1244539","vertical_position":14,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"4bdf037a-47ae-484b-b367-83f09b364e54","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"19576","canonical_mmty":"Chevrolet:Colorado:Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"3","sponsored_type":"standard","dealer_zip":"63141","exterior_color":"Radiant Red Tintcoat","fuel_type":"Gasoline","dealer_name":"Weber Chevrolet Creve Coeur","year":"2025","photo_count":19,"canonical_mmt":"Chevrolet:Colorado:Trail Boss","stock_type":"New","price":"41465","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"45715","vin":"1GCPTEEK5S1204853","vertical_position":15,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"d714808f-b5ed-42d1-a5ae-7f0b37c970e3","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"152066","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"23","sponsored_type":"standard","dealer_zip":"62236","exterior_color":"Red","fuel_type":"Gasoline","dealer_name":"George Weber Chevrolet Columbia","year":"2025","photo_count":16,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"37954","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"40055","vin":"1GCPTBEK9S1241242","vertical_position":16,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"10270ae5-dcbd-4d10-bf91-891cf69fdbdc","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"180872","canonical_mmty":"Chevrolet:Colorado:LT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"LT","cat":"truck_compact","stock_sub":"","mileage":null,"sponsored_type":"standard","dealer_zip":"63084","exterior_color":"Metallic White","fuel_type":"Gasoline","dealer_name":"Jim Trenary Chevrolet Buick GMC","year":"2025","photo_count":0,"canonical_mmt":"Chevrolet:Colorado:LT","stock_type":"New","price":"41805","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"44855","vin":"1GCPTCEK8S1240508","vertical_position":17,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"23778807-f1bb-4d5f-ad3e-4a4b674e1bfb","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"180884","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"10","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62049","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Roger Jennings Inc.","year":"2025","photo_count":22,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"48599","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"50845","vin":"1GCPTDEK9S1236411","vertical_position":18,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"49767c94-16f1-4060-bfa8-250fae86dcf8","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"211646","canonical_mmty":"Chevrolet:Colorado:Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"1","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62694","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Marshall Chevrolet","year":"2025","photo_count":5,"canonical_mmt":"Chevrolet:Colorado:Trail Boss","stock_type":"New","price":"45170","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"45170","vin":"1GCPTEEK6S1207339","vertical_position":19,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"448a3e10-ad8f-41a4-b65e-ecff7866e684","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"181171","canonical_mmty":"Chevrolet:Colorado:Trail Boss:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Trail Boss","cat":"truck_compact","stock_sub":"","mileage":"0","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62674","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Smoky Jennings Chevrolet, Inc.","year":"2025","photo_count":18,"canonical_mmt":"Chevrolet:Colorado:Trail Boss","stock_type":"New","price":"45445","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"45445","vin":"1GCPTEEK7S1244898","vertical_position":20,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"6a8c1c2e-daba-41e4-9bfb-1dbdb700d84a","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"5379495","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"3","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62286","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Meier Chevrolet GMC","year":"2025","photo_count":18,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"38460","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"40460","vin":"1GCPTBEK0S1128229","vertical_position":21,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"9eea454c-5c74-4450-b906-f66b6f40f747","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"151953","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"3","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62263","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Meier Chevrolet","year":"2025","photo_count":28,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"33745","make":"Chevrolet","drivetrain":"Rear-wheel Drive","relevancy_score":null,"msrp":null,"vin":"1GCPSBEK5S1186890","vertical_position":22,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"7158936f-1444-46eb-989d-40285c6645ed","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"5363686","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"86","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"65051","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Jim Butler Linn Chevrolet","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"42145","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"45395","vin":"1GCPTDEK3S1155453","vertical_position":23,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"285ed68b-50f8-467a-b25f-fbd3a3c98ce0","interior_color":"Jet Black/Adrenaline Red","cpo_indicator":false,"bodystyle":"Truck","customer_id":"178626","canonical_mmty":"Chevrolet:Colorado:Z71:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"Z71","cat":"truck_compact","stock_sub":"","mileage":"10","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62249","exterior_color":"Black","fuel_type":"Gasoline","dealer_name":"Steve Schmitt, Inc.","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:Z71","stock_type":"New","price":"45459","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"48260","vin":"1GCPTDEK2S1195037","vertical_position":24,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"46e65e08-bf5f-4886-ba20-2fe371f31bfe","interior_color":"Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"6051175","canonical_mmty":"Chevrolet:Colorado:LT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"LT","cat":"truck_compact","stock_sub":"","mileage":"2","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"65101","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Rusty Drewing Chevrolet Buick GMC","year":"2025","photo_count":26,"canonical_mmt":"Chevrolet:Colorado:LT","stock_type":"New","price":"37569","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"40569","vin":"1GCPTCEK9S1231168","vertical_position":25,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["price_drop_in_cents","american_made_index_ranking"],"listing_id":"fb17d0cd-6af2-4cfe-91a1-b385b4e60552","interior_color":"Jet Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"151584","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"5","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"62901","exterior_color":"Summit White","fuel_type":"Gasoline","dealer_name":"Vic Koenig Chevrolet","year":"2025","photo_count":22,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"31808","make":"Chevrolet","drivetrain":"Rear-wheel Drive","relevancy_score":null,"msrp":"33595","vin":"1GCPSBEK1S1208383","vertical_position":26,"sponsored":false,"cpo_package":null,"model":"Colorado"},{"badges":["american_made_index_ranking"],"listing_id":"85eafce9-a84e-4b8c-ae0e-aa648319c22f","interior_color":"Black","cpo_indicator":false,"bodystyle":"Truck","customer_id":"5363686","canonical_mmty":"Chevrolet:Colorado:WT:2025","certified_preowned":false,"seller_type":"dealership","nvi_program":false,"trim":"WT","cat":"truck_compact","stock_sub":"","mileage":"93","sponsored_type":"search_expansion|radius_non_paid","dealer_zip":"65051","exterior_color":"Sterling Gray Metallic","fuel_type":"Gasoline","dealer_name":"Jim Butler Linn Chevrolet","year":"2025","photo_count":32,"canonical_mmt":"Chevrolet:Colorado:WT","stock_type":"New","price":"37005","make":"Chevrolet","drivetrain":"Four-wheel Drive","relevancy_score":null,"msrp":"40255","vin":"1GCPTBEK5S1184571","vertical_position":27,"sponsored":false,"cpo_package":null,"model":"Colorado"}],"sponsored_type_eligible":["inventory_ad"]}]