-
12V power outlets 2 12V power outlets
-
2.0L I4 Turbocharged P250 Engine
-
3-point seatbelt Rear seat center 3-point seatbelt
-
4-Wheel Disc Brakes
-
4WD type Full-time AWD
-
6 Speakers
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
AM/FM radio
-
Accessory power Retained accessory power
-
Air Conditioning
-
Air conditioning Yes
-
All Wheel Drive
-
All-in-one key All-in-one remote fob and ignition key
-
Alloy wheels
-
Alternator Type Alternator
-
Ambient lighting
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Apple CarPlay/Android Auto
-
Armrests front center Front seat center armrest
-
Armrests rear Rear seat center armrest
-
Ashtray
-
Auto High-beam Headlights
-
Auto door locks Auto-locking doors
-
Auto headlights Auto on/off headlight control
-
Auto high-beam headlights
-
Auto levelling headlights Auto-leveling headlights
-
Auto-dimming Rear-View mirror
-
Automatic Emergency Braking
-
Automatic temperature control
-
Aux input jack Auxiliary input jack
-
Backup Camera
-
Basic warranty 60 month/60,000 miles
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Blind Spot Monitor
-
Body panels Galvanized steel/aluminum body panels with side impact beams
-
Brake Assist
-
Brake assist
-
Brake assist system
-
Brake pad warning Brake pad wear indicator
-
Brake type 4-wheel disc brakes
-
Bumper rub strip rear Black rear bumper rub strip
-
Bumpers front Body-colored front bumper
-
Bumpers rear Body-colored rear bumper
-
Bumpers: body-color
-
Cabin air filter
-
Camera Aerial view camera
-
Cargo access Power cargo area access release
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo tie downs Cargo area tie downs
-
Child door locks Power rear child safety door locks
-
Cigarette lighter Front cigarette lighter
-
Climate control Automatic climate control
-
Clock Digital clock
-
Compressor Intercooled turbo
-
Console insert material Piano black console insert
-
Corrosion perforation warranty 72 month/unlimited
-
Cruise control Cruise control with steering wheel mounted controls
-
Cylinder head material Aluminum cylinder head
-
Dashboard material LuxTec leatherette upholstered dashboard
-
Day/Night rearview mirror
-
Delay off headlights Delay-off headlights
-
Delay-off headlights
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Body-colored door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Body-colored door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirror with tilt-down in reverse Power passenger door mirror with tilt …
-
Door mirrors Power door mirrors
-
Door panel insert Piano black door panel insert
-
Door trim insert Leather door trim insert
-
Drive type All-wheel drive
-
Driver attention monitor Driver Condition Monitor
-
Driver door bin
-
Driver information center
-
Driver lumbar Driver seat with 4-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Driver selectable steering effort
-
Driver vanity mirror
-
Drivetrain selectable JaguarDrive Control driver selectable drivetrain mode
-
Dual Climate Control
-
Dual front impact airbags
-
Dual front side impact airbags
-
Dual-zone front climate control
-
Eco Feedback ECO feedback display gauge
-
Electronic Stability Control
-
Electronic parking brake
-
Electronic stability control Dynamic Stability Control electronic stability …
-
Emergency SOS Capable InControl Protect vehicle integrated emergency SOS sys…
-
Emergency communication system: InControl Protect
-
Emissions LEV3-SULEV30 emissions
-
Emissions tiers Tier 3 Bin 30 emissions
-
Engine Cylinders Ingenium I4
-
Engine Ingenium 2L I-4 gasoline direct injection, DOHC, variable valve contr…
-
Engine Location Front mounted engine
-
Engine Mounting direction Longitudinal mounted engine
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gauge
-
Equalizer Audyssey MultEQ automatic audio equalizer
-
External memory External memory control
-
First-row sunroof First-row sliding and tilting glass sunroof with express o…
-
First-row windows Power first-row windows
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Floor mats Carpet front and rear floor mats
-
Fob engine controls Jaguar Smart Key System with push button start
-
Folding door mirrors Manual folding door mirrors
-
Folding rear seats 40-20-40 folding rear seats
-
Forward collision warning Emergency Braking forward collision mitigation
-
Four wheel independent suspension
-
Front Bucket Seats
-
Front Center Armrest
-
Front anti-roll Front anti-roll bar
-
Front anti-roll bar
-
Front beverage holders
-
Front dual zone A/C
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front passenger lumbar Front passenger seat with 4-way power lumbar
-
Front reading lights
-
Front seat upholstery Leather front seat upholstery
-
Front seatback upholstery Leatherette front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Fuel Type Premium Unleaded
-
Fuel door Power fuel door release
-
Fully automatic headlights
-
Gearshifter material Leather gear shifter material
-
Glove box Locking glove box
-
Grained Leather Seat Trim
-
Grille style Black grille with chrome surround
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Headlight type Reflector headlights
-
Headlights LED low and high beam headlights
-
Headlights on reminder
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated Seats
-
Heated Steering Wheel
-
Heated door mirrors
-
Heated door mirrors Heated driver and passenger side door mirrors
-
High mount stop light High mounted center stop light
-
Hill control Hill descent control
-
Hill start assist
-
Ignition Spark ignition system
-
Illuminated entry
-
Immobilizer
-
Instrumentation display Analog instrumentation display
-
Interior accents Metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet radio capability Spotify internet radio capability
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob keyless entry
-
Keyfob window controls Keyfob window control
-
Keyless Entry
-
Keyless Start
-
Lane Departure Warning
-
Lane departure Lane Keep Assist
-
Leather Seats
-
Leather Shift Knob
-
Limited Slip Center Differential
-
Limited slip differential Torque Vectoring by Braking (TVbB) brake actuated …
-
Lock-up transmission
-
Locking hub control Permanent locking hub control
-
Low level warnings Low level warning for fuel, washer fluid and brake fluid
-
Low tire pressure warning
-
Low tire pressure warning Tire specific low air pressure warning
-
Maintenance warranty 60 month/60,000 miles
-
Memory Seat
-
Multiple headlights Multiple enclosed headlights
-
Navigation System
-
Number of airbags 6 airbags
-
Number of beverage holders 4 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Occupancy sensor Airbag occupancy sensor
-
Occupant sensing airbag
-
Oil pressure warning
-
One-touch down window Front and rear one-touch down windows
-
One-touch up window Front and rear one-touch up windows
-
Outside temperature display
-
Overdrive transmission
-
Overhead airbag
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console
-
Overhead console Mini overhead console
-
Overhead console storage
-
Panel insert Piano black instrument panel insert
-
Panic alarm
-
Park Assist (Front & Rear) Incl. Surround View
-
Parking sensors Front and rear parking sensors
-
Passenger door bin
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 8-way directional control…
-
Passenger vanity mirror
-
Perimeter approach lighting Remote activated perimeter approach lighting
-
Porsche Ceramic Composite Brake (PCCB)
-
Power Driver Seat
-
Power door mirrors
-
Power driver seat
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Power moonroof
-
Power passenger seat
-
Power passenger seat controls Passenger seat power reclining, lumbar support…
-
Power steering Plus
-
Power windows
-
Powertrain type ICE
-
Powertrain warranty 60 month/60,000 miles
-
Primary display size 10 inch primary display
-
Primary display touchscreen InControl Touch Pro primary monitor touchscreen
-
RDS Radio data system (RDS)
-
Radiator
-
Radio AM/FM/digital
-
Radio data system
-
Radio: Jaguar Sound System
-
Rain Sensing Front Wipers
-
Rain detecting wipers
-
Rain sensing wipers
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear anti-roll bar
-
Rear camera Rear mounted camera
-
Rear cargo door Trunk
-
Rear console climate control ducts
-
Rear fog lights
-
Rear head restraint control 3 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear seat center armrest
-
Rear seat direction Front facing rear seat
-
Rear seat upholstery Leather rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats Rear bench seat
-
Rear seats fixed or removable Fixed rear seats
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear windshield Fixed rear windshield
-
Rearview mirror Auto-dimming rear view mirror
-
Remote keyless entry
-
Remote panic alarm
-
Roadside warranty 60 month/60,000 miles
-
Running lights LED daytime running lights
-
Seatback storage pockets 2 seatback storage pockets
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seating capacity 5
-
Second-row windows Power second-row windows
-
Security system
-
Seek scan
-
Selectable mode transmission JaguarDrive Control selectable mode transmissio…
-
Sequential shift control
-
Service interval warning Service interval indicator
-
Shock absorbers Gas-pressurized shock absorbers
-
Smart device integration Apple CarPlay/Android Auto smart device mirroring
-
Smart device remote start
-
Spare tire Compact spare tire with aluminum wheel
-
Spare tire location Spare tire mounted under the cargo floor
-
Speakers Standard grade speakers
-
Speakers number 6 speakers
-
Special paint Monotone paint
-
Speed control
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Speed-sensing steering
-
Split folding rear seat
-
Split front seats Bucket front seats
-
Sport pedals Sport style pedals
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Start-stop engine Auto stop-start engine
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering wheel material Leather and metal-look steering wheel
-
Steering wheel mounted audio controls
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Sunroof/Moonroof
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Double wishbone front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailpipe Stainless steel quasi-dual exhaust with polished tailpipe finisher
-
Telescoping steering wheel
-
Temperature display Exterior temperature display
-
Tilt steering wheel
-
Tinted windows Light tinted windows
-
Tires P225/45HR18 AS BSW front and rear tires
-
Traction Control
-
Traction control
-
Traction control All-speed ABS and driveline traction control
-
Transmission 8-speed automatic
-
Transmission Type Automatic
-
Transmission electronic control
-
Trip computer
-
Trip odometer
-
Trunk lid trim Carpet trunk lid trim
-
Turbocharged
-
Turn signal in door mirrors Turn signal indicator in door mirrors
-
Turn signal indicator mirrors
-
USB Port
-
USB ports 2 USB ports
-
Valet key
-
Variable panel light Variable instrument panel light
-
Variably intermittent wipers
-
Vehicle tracker InControl Protect vehicle tracker
-
Ventilated brakes Front and rear ventilated disc brakes
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Voice activated audio controls
-
Wheels 18 x 7.5-inch front and rear black aluminum wheels
-
Wheels 19 x 7.5-inch front and 19 x 8.5-inch rear black aluminum wheels
-
Wheels: 18in Gloss Sparkle Silver (Style 1022)
-
Window Trim Chrome side window trim
-
Windshield trim Black windshield trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless streaming Bluetooth wireless audio streaming