Skip to main content
Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90 Photo of 2026 Onyx Black Metallic Volvo XC90
Photo of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90 Thumbnail of 2026 Onyx Black Metallic Volvo XC90
Ad

Car shopper resources

Basics

Exterior color
Onyx Black Metallic
Interior color
Rce0
Drivetrain
All-wheel Drive
MPG
20–26

Based on EPA mileage ratings. Use for comparison purposes only. Actual mileage will vary depending on driving conditions, driving habits, vehicle maintenance, and other factors.

Fuel type
Gasoline
Transmission
Automatic
Engine
2L I-4 gasoline direct injection, DOHC, variable valve control,
VIN
YV4062JM1T1428666
Stock #
V15033
Mileage
0 mi.

Features

Convenience
  • Adaptive Cruise Control
  • Cooled Seats
  • Heated Seats
  • Heated Steering Wheel
  • Keyless Entry
  • Keyless Start
  • Navigation System
  • Power Folding Mirrors
  • Power Liftgate
Entertainment
  • Apple CarPlay®
  • Bluetooth®
  • HomeLink
  • Premium Sound System
  • Satellite Radio
  • USB Port
  • WiFi Hotspot
Exterior
  • Alloy Wheels
  • Roof Rack
  • Sunroof/Moonroof
Safety
  • Automatic Emergency Braking
  • Backup Camera
  • Blind Spot Monitor
  • Brake Assist
  • LED Headlights
  • Lane Departure Warning
  • Rain Sensing Wipers
  • Rear Cross Traffic Alert
  • Stability Control
Seating
  • Leather Seats
  • Memory Seat
  • Third Row Seating
View all features

Features

These features are associated with this vehicle type. Contact the seller to confirm this specific vehicle has them.

  • 12V power outlets 2 12V power outlets
  • 14 Speakers
  • 2.0L Direct-Injected Turbocharged Engine
  • 3-point seatbelt Rear seat center 3-point seatbelt
  • 3rd Row Seat
  • 3rd row seats: bucket
  • 4 Cylinder Engine
  • 4-Wheel Disc Brakes
  • 4WD type Full-time AWD
  • 8-Speed A/T
  • A/C
  • A/T
  • ABS
  • ABS Brakes 4-wheel antilock (ABS) brakes
  • ABS Brakes Four channel ABS brakes
  • ABS brakes
  • AM/FM Stereo
  • AM/FM radio: SiriusXM
  • Accessory power Retained accessory power
  • Adaptive Cruise Control
  • Adaptive cruise control Adaptive Cruise Control (ACC)
  • Adjustable Steering Wheel
  • Aerial View Display System
  • Air Conditioning
  • Air conditioning Yes
  • All Wheel Drive
  • All-in-one key All-in-one remote fob and ignition key
  • Alloy wheels
  • Alternator Type Hybrid electric motor alternator
  • Aluminum Wheels
  • Ambient lighting
  • Amplifier 600W amplifier
  • Antenna Diversity antenna
  • Antenna Window grid audio antenna
  • Anti-whiplash front head restraints
  • Apple CarPlay
  • Armrests front center Front seat center armrest
  • Armrests front storage Front seat armrest storage
  • Audio theft deterrent Audio system theft deterrent
  • Auto High-beam Headlights
  • Auto door locks Auto-locking doors
  • Auto headlights Auto on/off headlight control
  • Auto high-beam headlights Auto Highbeam (AHB) auto high-beam headlights
  • Auto levelling headlights Auto-leveling headlights
  • Auto-Dimming Rearview Mirror
  • Auto-dimming Rear-View mirror
  • Auto-dimming door mirror driver Auto-dimming driver side mirror
  • Auto-dimming door mirror passenger Auto-dimming passenger side mirror
  • Auto-dimming door mirrors
  • Automatic Emergency Braking
  • Automatic Headlights
  • Automatic Highbeams
  • Automatic brake hold
  • Automatic temperature control
  • Autonomous cruise control Pilot Assist hands-on cruise control
  • Auxiliary Audio Input
  • Back-Up Camera
  • Backup Camera
  • Basic warranty 48 month/50,000 miles
  • Battery charge warning
  • Battery run down protection
  • Battery type Lead acid battery
  • Beverage holders Front beverage holders
  • Beverage holders rear Rear beverage holders
  • Blind Spot Monitor
  • Blind spot BLIS active blind spot system
  • Bluetooth Connection
  • Body panels Composite/galvanized steel body panels with side impact beams
  • Bodyside cladding Black bodyside cladding
  • Brake Assist
  • Brake assist
  • Brake assist system
  • Brake type 4-wheel disc brakes
  • Bucket Seats
  • Bumper insert Black rear bumper insert
  • Bumper rub strip front Black front bumper rub strip
  • Bumper rub strip rear Body-colored rear bumper rub strip
  • Bumpers front Body-colored front bumper
  • Bumpers rear Body-colored rear bumper
  • Bumpers: body-color
  • Cabin air filter
  • Camera Aerial view camera
  • Capless fuel filler
  • Cargo access Proximity cargo area access release
  • Cargo floor type Carpet cargo area floor
  • Cargo light Cargo area light
  • Cargo tie downs Cargo area tie downs
  • Child Safety Locks
  • Child door locks Power rear child safety door locks
  • Climate Control
  • Climate control Automatic climate control
  • Climate control ionization
  • Clock Digital clock
  • Compressor Intercooled turbo
  • Concealed cargo storage Cargo area concealed storage
  • Configurable instrumentation gauges
  • Console insert material Genuine wood and piano black console insert
  • Cooled Driver Seat
  • Cooled Front Seat(s)
  • Cooled Passenger Seat
  • Cooled front seats Ventilated driver and front passenger seats
  • Corrosion perforation warranty 144 month/unlimited
  • Cross-Traffic Alert
  • Cruise Control
  • Cruise Control Steering Assist
  • Cruise control Cruise control with steering wheel mounted controls
  • Cylinder head material Aluminum cylinder head
  • Dashboard material Leatherette upholstered dashboard
  • Day/Night rearview mirror
  • Daytime Running Lights
  • Delay off headlights Delay-off headlights
  • Delay-off headlights
  • Digital signal processor Harman/kardon digital signal processor
  • Door ajar warning Rear cargo area ajar warning
  • Door bins front Driver and passenger door bins
  • Door bins rear Rear door bins
  • Door handle material Body-colored door handles
  • Door locks Power door locks with 2 stage unlocking
  • Door mirror style Black door mirrors
  • Door mirror type Standard style side mirrors
  • Door mirrors Power door mirrors
  • Door panel insert Genuine wood door panel insert
  • Door trim insert Leather door trim insert
  • Drive type All-wheel drive
  • Driver Adjustable Lumbar
  • Driver Air Bag
  • Driver Illuminated Vanity Mirror
  • Driver Monitoring
  • Driver Restriction Features
  • Driver attention monitor Driver Alert Control
  • Driver door bin
  • Driver foot rest
  • Driver lumbar Driver seat with 4-way power lumbar
  • Driver seat direction Driver seat with 12-way directional controls
  • Driver selectable steering effort Drive Mode Settings driver selectable stee…
  • Driver vanity mirror
  • Drivetrain selectable Drive Mode Settings driver selectable drivetrain mode
  • Dual Climate Control
  • Dual front impact airbags
  • Dual front side impact airbags
  • Dual-zone front climate control
  • Dual-zone rear climate control
  • Electric compressor
  • Electric power regeneration gauge Electric power/regeneration gauge
  • Electric powertrain MHEV (mild hybrid electric vehicle)
  • Electronic Stability Control
  • Electronic parking brake
  • Electronic stability control DSTC/RSC electronic stability control system wi…
  • Emergency SOS Volvo Cars App w/4 Year Subscription vehicle integrated emerge…
  • Emergency communication system: Volvo Cars App w/4 Year Subscription
  • Emissions LEV3-ULEV70 emissions
  • Emissions tiers Tier 3 Bin 70 emissions
  • Engine 2L I-4 gasoline direct injection, DOHC, variable valve control, inter…
  • Engine Cylinders I4
  • Engine Location Front mounted engine
  • Engine Mounting direction Transverse mounted engine
  • Engine block material Aluminum engine block
  • Engine cooler Engine oil cooler
  • Engine/electric motor temperature gauge
  • Equalizer Automatic audio equalizer
  • Evasion Assist
  • Evasion assist system
  • Exterior Parking Camera Rear
  • External memory External memory control
  • First-row sunroof First and second-row sliding and tilting laminated glass s…
  • First-row windows Power first-row windows
  • Floor Mats
  • Floor console Full floor console
  • Floor console storage Covered floor console storage
  • Floor coverage Full floor coverage
  • Floor covering Full carpet floor covering
  • Floor mats Carpet front and rear floor mats
  • Fob engine controls Keyless Drive with hands-free access and push button sta…
  • Folding door mirrors Power folding door mirrors
  • Fore and aft second-row seat Second-row seats with manual fore and aft
  • Forward collision warning Collision Avoidance forward collision mitigation w…
  • Four wheel independent suspension
  • Front Bucket Seats
  • Front Center Armrest w/Storage
  • Front Collision Mitigation
  • Front Head Air Bag
  • Front Side Air Bag
  • Front anti-roll Front anti-roll bar
  • Front anti-roll bar
  • Front anti-whiplash head restraints WHIPS anti-whiplash front seat head rest…
  • Front beverage holders
  • Front camera Front mounted camera
  • Front cross traffic warning Cross-Traffic Alert w/Autobrake front cross traf…
  • Front dual zone A/C
  • Front head restraints Fixed front seat head restraints
  • Front impact airbag driver Driver front impact airbag
  • Front impact airbag passenger Passenger front impact airbag
  • Front passenger lumbar Front passenger seat with 4-way power lumbar
  • Front reading lights
  • Front seat upholstery Nappa leather front seat upholstery
  • Front seatback upholstery Plastic front seatback upholstery
  • Front side impact airbag driver SIPS seat mounted side impact driver airbag
  • Front side impact airbag passenger SIPS seat mounted side impact front passe…
  • Fuel Type Premium Unleaded
  • Fuel door lock Power fuel door lock
  • Full gauge cluster screen
  • Fully automatic headlights
  • Garage door opener HomeLink garage door opener
  • Garage door transmitter: HomeLink
  • Gasoline/Mild Electric Hybrid
  • Gauge cluster display size (inches) Gauge cluster display size: 12.30
  • Gearshifter material Glass and metal-look gear shifter material
  • Generic Sun/Moonroof
  • Genuine wood dashboard insert
  • Genuine wood door panel insert
  • Glove box Illuminated locking glove box
  • Grille style Black grille
  • HID Headlights
  • Hands-Free Liftgate
  • Handsfree Bluetooth handsfree wireless device connectivity
  • Head up display Head-up display
  • Head-Up Display
  • Headlight cleaning
  • Headlight type Reflector headlights
  • Headlight washers Front headlight washers
  • Headlights LED low and high beam headlights
  • Headlights-Auto-Leveling
  • Headliner coverage Full headliner coverage
  • Headliner material Cloth headliner material
  • Heads-Up Display
  • Heated Front Bucket Seats w/Power Side Support
  • Heated Front Seat(s)
  • Heated Mirrors
  • Heated Rear Seat(s)
  • Heated Seats
  • Heated Steering Wheel
  • Heated door mirrors
  • Heated door mirrors Heated driver and passenger side door mirrors
  • Heated front seats
  • Heated front seats Heated driver and front passenger seats
  • Heated rear seats
  • Heated steering wheel
  • Heated wipers Heated windshield wiper park
  • High mount stop light High mounted center stop light
  • Hill control Hill descent control
  • Hybrid
  • Hybrid/electric components warranty 96 month/100000 miles
  • Ignition Spark ignition system
  • Illuminated entry
  • Illuminated glove box
  • Illuminated ignition switch
  • Illuminated sill plates
  • Immobilizer
  • Instrumentation display Digital/analog instrumentation display
  • Integrated Turn Signal Mirrors
  • Integrated navigation Integrated navigation system with voice activation
  • Interior accents Metal-look interior accents
  • Interior courtesy lights Fade interior courtesy lights
  • Intermittent Wipers
  • Internet access Google Automotive Services full service internet access
  • Key in vehicle warning
  • Keyfob cargo controls Keyfob trunk control
  • Keyfob door locks Keyfob activated door locks
  • Keyless Entry
  • Keyless Start
  • Knee Air Bag
  • Knee airbag
  • Knee airbag Driver side knee airbag
  • LED Headlights
  • LED brake lights
  • Laminated window Laminated side window glass
  • Lane Departure Warning
  • Lane Keeping Assist
  • Lane departure Lane Keeping Aid/Run-off Road Mitigation
  • Leather Seats
  • Leather Steering Wheel
  • Left camera Left side camera
  • License plate front bracket Front license plate bracket
  • Lithium Ion Traction Battery
  • Lock-up transmission
  • Locking hub control Permanent locking hub control
  • Low level warnings Low level warning for oil, fuel, washer fluid and brake f…
  • Low tire pressure warning
  • MP3 Capability
  • Maintenance warranty 36 month/30,000 miles
  • Maximum roof rack load 220.5 lbs. maximum roof rack load
  • Memory Seat
  • Memory seat
  • Memory settings Memory settings include: door mirrors
  • Mirror Memory
  • Mobile app access
  • Multi-Zone A/C
  • Multiple headlights Multiple enclosed headlights
  • Navigation System
  • Noise cancellation Active noise cancellation
  • Number of airbags 7 airbags
  • Number of beverage holders 12 beverage holders
  • Number of doors 4 doors
  • Number of first-row screens 2 total number of 1st row displays
  • Number of memory settings 3 memory settings
  • Occupancy sensor Airbag occupancy sensor
  • Occupant sensing airbag
  • Oil pressure warning
  • One-touch down window Driver and passenger one-touch down windows
  • One-touch up window Driver and passenger one-touch up windows
  • Outside temperature display
  • Over the air updates
  • Overdrive transmission
  • Overhead airbag
  • Overhead airbags Curtain first, second and third-row overhead airbags
  • Paint Metallic paint
  • Panel insert Genuine wood instrument panel insert
  • Panic alarm
  • Panoramic Roof
  • Parking sensors Park Assist - Front, Rear and Side front, rear and side park…
  • Passenger Adjustable Lumbar
  • Passenger Air Bag
  • Passenger Air Bag Sensor
  • Passenger Illuminated Visor Mirror
  • Passenger door bin
  • Passenger doors rear left Conventional left rear passenger door
  • Passenger doors rear right Conventional right rear passenger door
  • Passenger seat direction Front passenger seat with 12-way directional contro…
  • Passenger vanity mirror
  • Pedestrian detection Pedestrian impact prevention
  • Perimeter approach lighting Remote activated perimeter approach lighting
  • Post collision braking system Automatic post-collision braking system
  • Power Door Locks
  • Power Driver Seat
  • Power Folding Mirrors
  • Power Liftgate
  • Power Mirror(s)
  • Power door mirrors
  • Power driver seat
  • Power driver seat controls Driver seat power reclining, lumbar support, cush…
  • Power moonroof
  • Power passenger seat
  • Power passenger seat controls Passenger seat power reclining, lumbar support…
  • Power steering
  • Power windows
  • Powertrain type Hybrid
  • Powertrain warranty 48 month/50,000 miles
  • Premium Sound System
  • Primary display size 11.2 inch primary display
  • Primary display touchscreen Primary monitor touchscreen
  • Privacy Glass
  • RDS Radio data system (RDS)
  • Radiator
  • Radio AM/FM/SiriusXMsatellite
  • Radio data system
  • Radio: High Performance Audio System
  • Rain Sensing Front Wipers
  • Rain detecting wipers
  • Rain sensing wipers
  • Real time traffic Real-time traffic
  • Rear A/C
  • Rear Air Conditioning Controls
  • Rear Bucket Seats
  • Rear Collision Mitigation
  • Rear Cross Traffic Alert
  • Rear Defrost
  • Rear Head Air Bag
  • Rear Parking Aid
  • Rear Spoiler
  • Rear Springs Regular grade rear springs
  • Rear air conditioning
  • Rear anti-roll Rear anti-roll bar
  • Rear anti-roll bar
  • Rear camera Rear mounted camera
  • Rear cargo door Power liftgate rear cargo door
  • Rear climate control Rear climate control system with separate controls
  • Rear collision warning Cross Traffic Alert collision mitigation
  • Rear console climate control ducts
  • Rear dual zone A/C
  • Rear fog lights
  • Rear head restraint control 2 rear seat head restraints
  • Rear head restraint control Power rear seat head restraint control
  • Rear head restraints Foldable rear seat head restraints
  • Rear headliner/pillar ducts Rear headliner/pillar climate control ducts
  • Rear reading lights
  • Rear seat direction Front facing rear seat
  • Rear seat upholstery Nappa leather rear seat upholstery
  • Rear seatback upholstery Carpet rear seatback upholstery
  • Rear sun blinds Manual rear side window sunblinds
  • Rear under seat ducts Rear under seat climate control ducts
  • Rear window defroster
  • Rear window wiper
  • Rear windshield Fixed rear windshield
  • Rear windshield wipers Yes rear windshield wipers
  • Rearview mirror Auto-dimming rear view mirror
  • Reclining second-row seats Manual reclining second-row seats
  • Regenerative brakes
  • Remote Trunk Release
  • Remote keyless entry
  • Remote panic alarm
  • Requires Subscription
  • Restricted driving mode Care Key restricted driving mode
  • Right camera Right side camera
  • Roadside warranty 48 month/unlimited
  • Roof rails
  • Running lights LED daytime running lights
  • SAE Autonomy Level 2 - partial automation SAE Autonomy
  • Satellite Radio
  • Satellite trial 3 month satellite trial subscription
  • Seat Memory
  • Seatbelt pretensioners Front and rear seatbelt pretensioners
  • Seatbelt pretensioners number 6 seatbelt pre-tensioners
  • Seating capacity 6
  • Second-row seat folding position Fold forward second-row seatback
  • Second-row seats Second-row bucket seats
  • Second-row seats fixed or removable Fixed second-row seats
  • Second-row windows Power second-row windows
  • Security system
  • Seek scan
  • Selectable mode transmission Drive Mode Settings selectable mode transmissio…
  • Sequential shift control Geartronic Sequential shift control
  • Service interval warning Service interval indicator
  • Shock absorbers Gas-pressurized shock absorbers
  • Smart Device Integration
  • Smart device integration Apple CarPlay smart device mirroring
  • Spare tire Compact spare tire with steel wheel
  • Spare tire location Spare tire mounted under the cargo floor
  • Speakers Bowers & Wilkins speakers
  • Speakers number 14 speakers
  • Special paint Monotone paint
  • Speed control
  • Speed sensitive steering Speed sensitive power steering
  • Speed sensitive volume
  • Speed-sensing steering
  • Speedometer Redundant digital speedometer
  • Split folding rear seat
  • Split front seats Bucket front seats
  • Spoiler
  • Spoiler Rear lip spoiler
  • Springs front Front coil springs
  • Springs rear Rear transverse leaf spring
  • Stability Control
  • Start-stop engine Auto stop-start engine
  • Starter Hybrid electric motor starter
  • Steering Electric power-assist steering system
  • Steering Wheel Audio Controls
  • Steering mounted audio control Steering wheel mounted audio controls
  • Steering type Rack-pinion steering
  • Steering type number of wheels 2-wheel steering system
  • Steering wheel material Leather and metal-look steering wheel
  • Steering wheel mounted audio controls
  • Steering wheel telescopic Manual telescopic steering wheel
  • Supercharged
  • Suspension Standard ride suspension
  • Suspension ride type front Independent front suspension
  • Suspension ride type rear Independent rear suspension
  • Suspension type front Double wishbone front suspension
  • Suspension type rear Multi-link rear suspension
  • Tachometer
  • Tailgate control Tailgate/power door lock
  • Tailpipe Stainless steel quasi-dual exhaust
  • Telematics
  • Telescoping steering wheel
  • Temperature display Exterior temperature display
  • Temporary Spare Tire
  • Third Row Seating
  • Third-row bucket seats
  • Third-row fold into floor seats Manual fold into floor third-row seat
  • Third-row head restraint control Power third-row head restraint control
  • Third-row head restraint number 2 third-row head restraints
  • Third-row head restraints Height adjustable third-row head restraints
  • Third-row seat facing Front facing third-row seat
  • Third-row seat fixed or removable Fixed third-row seats
  • Third-row seat upholstery Leather rear seat upholstery
  • Third-row seatback upholstery Carpet third-row seatback upholstery
  • Third-row seats folding Third-row bucket seats
  • Third-row windows Fixed third-row windows
  • Tinted windows Deep tinted windows
  • Tire Pressure Monitor
  • Tires - Front Performance
  • Tires - Rear Performance
  • Tires P275/40VR21 AS BSW front and rear tires
  • Traction Control
  • Traction battery type Lithium ion (Li-ion)
  • Traction control
  • Traction control All-speed ABS and driveline traction control
  • Traffic sign information Road Sign Information (RSI)
  • Transmission 8-speed automatic
  • Transmission Type Automatic
  • Transmission electronic control
  • Transmission w/Dual Shift Mode
  • Trip computer
  • Trip odometer
  • Trunk hatch Trunk/hatch auto-latching
  • Trunk lid trim Plastic trunk lid trim
  • Turbo/Supercharged
  • Turbocharged
  • Turn signal in door mirrors Turn signal indicator in door mirrors
  • Turn signal indicator mirrors
  • USB Port
  • USB ports 4 USB ports
  • Universal Garage Door Opener
  • Unresponsive driver assist Emergency Stop Assist (ESA) unresponsive driver a…
  • V traction battery 48
  • Valet key
  • Variable Speed Intermittent Wipers
  • Variable panel light Variable instrument panel light
  • Variably intermittent wipers
  • Vehicle tracker
  • Vehicle-to-everything (V2X) Connected Safety vehicle-to-everything (V2X) wir…
  • Ventilated Nappa Leather Upholstery
  • Ventilated brakes Front and rear ventilated disc brakes
  • Ventilated front seats
  • Visor driver mirror Driver visor mirror
  • Visor illuminated driver mirror Illuminated driver visor mirror
  • Visor illuminated passenger mirror Illuminated passenger visor mirror
  • Visor passenger mirror Passenger visor mirror
  • Voice activated audio Voice activated audio controls
  • Voice activated climate control Voice-activated climate control
  • WIFI Hotspot
  • Wheels 22 x 9-inch front and rear machined w/painted accents aluminum wheels…
  • Wheels: 21'' 5-Multi Spoke Black Diamond Cut Alloy
  • Window Trim Black side window trim
  • Wipers Variable intermittent front windshield wipers
  • Wireless device charging Front wireless smart device charging
  • Wireless streaming Bluetooth wireless audio streaming
  • Woodgrain Interior Trim
  • harman/kardon Speakers

Factory warranties

Powertrain
48 month/50,000 miles

Seller’s info

Germain Volvo Cars North Hills

Not rated Dealerships need five reviews in the past 24 months before we can display a rating. (1 review)
15035 Perry Highway, Wexford, PA 15090

Seller’s notes about this car

Have a question?

Get answers, see the car, or find a good time for a test drive. Take the next step and contact the seller.

Contact seller

Contact seller

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your payment

Based on est. car price of $83,530 at ...% APR* and ...% sales tax.
$... per month
Car price
$83,530
Down payment
-Not Priced
Trade-in value
-Not Priced
Estimated sales tax ...%
(based on ZIP)
+
Other fees*
Not included
Total loan amount
Total interest paid
(over life of loan)
+
Total loan & interest paid
Monthly payment
Ad
Estimate trade-in
Estimate trade-in

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Ad
Ad

Car shopper resources

Cars.com Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; Cars.com is not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Click here for more details.

Bluetooth® is a registered mark of Bluetooth® SIG, Inc. Android Auto™ is a trademark of Google LLC. Apple CarPlay® is a registered trademark of Apple Inc. Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, Germany.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

Call
Check availability

Contact seller

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

  • Want to sell or trade-in your car fast? Get a free Instant Offer from local dealers.
  • Tell us about your car and get a free Instant Offer within minutes.
  • Schedule a car inspection with the dealer.
  • Use your Instant Offer to trade-in your car.
Get your Instant Offer