-
2-position memory and front passenger's seat w/4-way power adjustment
-
Brake Assist
-
Clock
-
Conversation Mirror and 1 12V DC Power Outlet
-
Engine Coolant Temp
-
Front Vented Discs
-
Heated Wiper Park and Defroster
-
Height Adjusters and Pretensioners
-
Hill Hold Control and Electric Parking Brake
-
Illuminated Entry
-
Illuminated Ignition Switch and Panic Button
-
Manual Folding and Turn Signal Indicator
-
Metal-Look Console Insert and Chrome/Metal-Look Interior Accents
-
Mini Overhead Console w/Storage
-
Odometer
-
Simulated Wood Door Panel Insert
-
Steering Wheel Controls and Voice Activation
-
Sunroof/Convertible Roof and Remote Start
-
Tachometer
-
Trip Odometer and Trip Computer
-
Windows
-
including 4-way power lumbar support
-
1 12V DC Power Outlet
-
1 Seatback Storage Pocket
-
1.5L I-4 16-Valve DOHC Engine with Turbocharger
-
12V power outlets 1 12V power outlet
-
14 Gal. Fuel Tank
-
2 LCD Monitors In The Front
-
3-point seatbelt Rear seat center 3-point seatbelt
-
36-Amp/Hr 410CCA Maintenance-Free Battery
-
4-Wheel Disc Brakes w/4-Wheel ABS
-
4WD type Real Time AWD w/Intelligent Control System automatic full-time AWD
-
5.64 Axle Ratio
-
60-40 Folding Split-Bench Front Facing Manual Reclining Fold Forward Seatbac…
-
739 lbs
-
8-Way Driver Seat
-
850# Maximum Payload
-
ABS And Driveline Traction Control
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
Accessory power Retained accessory power
-
Adaptive Cruise Control
-
Adaptive cruise control Adaptive Cruise Control (ACC) with Low-Speed Follow
-
Adaptive w/Traffic Stop-Go
-
Air Filtration
-
Air conditioning Yes
-
Airbag Occupancy Sensor
-
All Wheel Drive
-
All-in-one key All-in-one remote fob and ignition key
-
Alternator Type Alternator
-
Amplifier 180W amplifier
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Armrests front center Sliding front seat center armrest
-
Armrests rear Rear seat center armrest
-
Audio Theft Deterrent
-
Audio theft deterrent Audio system theft deterrent
-
Auto door locks Auto-locking doors
-
Auto headlights Programmable headlight control
-
Auto high-beam headlights
-
Automatic Emergency Braking
-
Automatic Full-Time All-Wheel
-
Automatic brake hold
-
Back-Up Camera
-
Backup Camera
-
Basic warranty 36 month/36,000 miles
-
Battery charge warning
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Black Bodyside Cladding and Black Wheel Well Trim
-
Black Rear Bumper w/Metal-Look Bumper Insert
-
Blind Spot Information (BSI) System Blind Spot
-
Blind Spot Monitor
-
Blind spot Blind Spot Information (BSI) System
-
Body panels Fully galvanized steel body panels with side impact beams
-
Body-Colored Door Handles
-
Body-Colored Front Bumper w/Black Rub Strip/Fascia Accent and Metal-Look Bum…
-
Body-Colored Power Heated Side Mirrors w/Convex Spotter
-
Bodyside cladding Black bodyside cladding
-
Brake Assist
-
Brake assist system
-
Brake type 4-wheel disc brakes
-
Bumper insert Metal-look front and rear bumper inserts
-
Bumper rub strip front Black front bumper rub strip
-
Bumpers front Body-colored front bumper
-
Bumpers rear Black rear bumper
-
Cabin air filter
-
Capless fuel filler
-
Cargo Area Concealed Storage
-
Cargo Space Lights
-
Cargo access Power cargo area access release
-
Cargo cover Roll-up cargo cover
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo tie downs Cargo area tie downs
-
Carpet Floor Trim
-
Child door locks Manual rear child safety door locks
-
Chrome Side Windows Trim and Black Front Windshield Trim
-
Clearcoat Paint
-
Climate control Automatic climate control
-
Clock Digital clock
-
Collision Mitigation Braking System (CMBS) + FCW and Cross Traffic Monitor
-
Collision Mitigation-Front
-
Compact Spare Tire Mounted Inside Under Cargo
-
Compass
-
Compressor Intercooled turbo
-
Concealed cargo storage Cargo area concealed storage
-
Configurable instrumentation gauges
-
Console insert material Metal-look console insert
-
Conversation mirror
-
Convertible
-
Convex spotter Driver convex spotter mirror
-
Corrosion perforation warranty 60 month/unlimited
-
Cruise Control w/Steering Wheel Controls
-
Cruise control Cruise control with steering wheel mounted controls
-
Curtain 1st And 2nd Row Airbags
-
Cylinder head material Aluminum cylinder head
-
Day-Night Auto-Dimming Rearview Mirror
-
Day/Night rearview mirror
-
Deep Tinted Glass
-
Delay off headlights Delay-off headlights
-
Delayed Accessory Power
-
Digital Appearance
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Body-colored door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Body-colored door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirrors Power door mirrors
-
Door panel insert Simulated wood door panel insert
-
Door trim insert Leatherette door trim insert
-
Drive type All-wheel drive
-
Driver / Passenger And Rear Door Bins
-
Driver And Passenger Visor Vanity Mirrors w/Driver And Passenger Illuminatio…
-
Driver Foot Rest
-
Driver Information Center
-
Driver Monitoring-Alert
-
Driver attention monitor Driver attention alert
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 4-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Drivetrain selectable Eco Assist driver selectable drivetrain mode
-
Dual Climate Control
-
Dual Stage Driver And Passenger Front Airbags
-
Dual Stage Driver And Passenger Seat-Mounted Side Airbags
-
Dual Zone Front Automatic Air Conditioning
-
Dual-zone front climate control
-
Eco Feedback Eco Assist ECO feedback display gauge
-
Electric Power-Assist Speed-Sensing Steering
-
Electronic Stability Control (ESC)
-
Electronic parking brake
-
Electronic stability control Electronic stability control system
-
Emissions LEV3-ULEV50 emissions
-
Emissions tiers Tier 3 Bin 50 emissions
-
Engine 1.5L I-4 gasoline direct injection, DOHC, variable valve control, int…
-
Engine Auto Stop-Start Feature
-
Engine Cylinders I4
-
Engine Location Front mounted engine
-
Engine Mounting direction Transverse mounted engine
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gauge
-
Engine: 1.5L I-4 16-Valve DOHC w/Turbocharger
-
Express Open/Close Sliding And Tilting Glass 1st Row Sunroof w/Sunshade
-
External memory HondaLink external memory control
-
FOB Controls -inc: Cargo Access
-
Fade-To-Off Interior Lighting
-
First-row moonroof First-row sliding and tilting glass moonroof with express…
-
First-row windows Power first-row windows
-
Fixed Rear Window w/Fixed Interval Wiper
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Floor mats Carpet front and rear floor mats
-
Fob engine controls Smart Entry with Walk Away Auto Lock with hands-free acc…
-
Fob moonroof controls Keyfob moonroof/convertible roof control
-
Fob remote vehicle controls Keyfob remote engine start
-
Fob window controls Keyfob window control
-
Fog lights LED front fog lights
-
Folding door mirrors Manual folding door mirrors
-
Folding rear seats 60-40 folding rear seats
-
Forward collision warning Collision Mitigation Braking System (CMBS) + FCW f…
-
Front And Rear Anti-Roll Bars
-
Front Cupholder
-
Front Fog Lamps
-
Front Map Lights
-
Front anti-roll Front anti-roll bar
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front reading lights
-
Front seat upholstery Leather front seat upholstery
-
Front seatback upholstery Leatherette front seatback upholstery
-
Front side impact airbag driver SmartVent seat mounted side impact driver ai…
-
Front side impact airbag passenger SmartVent seat mounted side impact front …
-
Fuel Type Regular Unleaded
-
Fuel door Manual fuel door release
-
Full Carpet Floor Covering -inc: Carpet Front And Rear Floor Mats
-
Full Cloth Headliner
-
Full Floor Console w/Covered Storage
-
Fully Galvanized Steel Panels
-
GVWR: 4
-
Garage door opener HomeLink garage door opener
-
Gas-Pressurized Shock Absorbers
-
Gauges -inc: Speedometer
-
Gearshifter material Leather gear shifter material
-
Glove box Locking glove box
-
Grille style Grille with chrome bar
-
Grille w/Chrome Bar
-
HVAC -inc: Underseat Ducts and Console Ducts
-
Handsfree Bluetooth HandsFreeLink handsfree wireless device connectivity
-
Headlight type Projector beam headlights
-
Headlights Halogen headlights
-
Headlights on reminder
-
Headlights-Automatic Highbeams
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated Front Bucket Seats -inc: driver's seat w/12-way power adjustment
-
Heated Seats
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated front seats Heated driver and front passenger seats
-
Heated wiper area Heated rear wiper park
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill Start Assist
-
HomeLink Garage Door Transmitter
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated ignition switch
-
Immobilizer
-
Instrumentation display Digital instrumentation display
-
Integrated Roof Antenna
-
Interior Trim -inc: Simulated Wood Instrument Panel Insert
-
Interior accents Chrome and metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet radio capability Pandora compatibility internet radio capability
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob door locks Keyfob activated door locks
-
Keyless Entry
-
Keyless Start
-
LED Brakelights
-
LED brake lights
-
Lane Departure Warning
-
Lane Keeping Assist System (LKAS) w/Road Departure Mitigation (RDM) Lane Dep…
-
Lane Keeping Assist System (LKAS) w/Road Departure Mitigation (RDM) Lane Kee…
-
Lane departure Lane Keeping Assist System (LKAS) w/Road Departure Mitigation…
-
Leather Gear Shifter Material
-
Leather Seat Trim
-
Leather Seats
-
Leather/Metal-Look Steering Wheel
-
Leatherette Door Trim Insert
-
Lip Spoiler
-
Locking Glove Box
-
Locking hub control Permanent locking hub control
-
Low Tire Pressure Warning
-
Low level warnings Low level warning for fuel and brake fluid
-
Low tire pressure warning
-
Manual Adjustable Front Head Restraints and Manual Adjustable Rear Head Rest…
-
Manual Tilt/Telescoping Steering Column
-
Memory Seat
-
Multi-Link Rear Suspension w/Coil Springs
-
Multi-level cargo floor
-
Multiple headlights Multiple enclosed headlights
-
Noise cancellation Active noise cancellation
-
Number of airbags 6 airbags
-
Number of beverage holders 8 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Number of memory settings 2 memory settings
-
Occupancy sensor Airbag occupancy sensor
-
Oil pressure warning
-
One-touch down window Driver and passenger one-touch down windows
-
One-touch up window Driver and passenger one-touch up windows
-
Outboard Front Lap And Shoulder Safety Belts -inc: Rear Center 3 Point
-
Outside Temp Gauge
-
Overdrive transmission
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console Mini overhead console
-
Overhead console storage
-
Paint Pearlcoat paint
-
Panel insert Simulated wood instrument panel insert
-
Passenger Seat
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 4-way directional control…
-
Pedestrian detection Collision Mitigation Braking System (CMBS) pedestrian i…
-
Perimeter Alarm
-
Perimeter approach lighting Remote activated perimeter approach lighting
-
Perimeter/Approach Lights
-
Permanent Locking Hubs
-
Power 1st Row Windows w/Driver And Passenger 1-Touch Up/Down
-
Power Door Locks w/Autolock Feature
-
Power Driver Seat
-
Power Liftgate Rear Cargo Access
-
Power Rear Windows and Fixed 3rd Row Windows
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Power passenger seat controls Passenger seat power reclining and fore/aft co…
-
Powertrain type ICE
-
Powertrain warranty 60 month/60,000 miles
-
Primary display size 7 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
Programmable Projector Beam Halogen Daytime Running Auto High-Beam Headlamps…
-
Proximity Key For Doors And Push Button Start
-
Quasi-Dual Stainless Steel Exhaust
-
RDS Radio data system (RDS)
-
Radiator
-
Radio AM/FM/digital/SiriusXMsatellite
-
Radio w/Seek-Scan
-
Rear Child Safety Locks
-
Rear Cross Traffic Alert
-
Rear Cupholder
-
Rear Spoiler
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear bench seats Split-bench rear seat
-
Rear camera Rear mounted camera
-
Rear cargo door Power liftgate rear cargo door
-
Rear collision warning Cross Traffic Monitor collision warning
-
Rear console climate control ducts
-
Rear head restraint control 3 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear seat direction Front facing rear seat
-
Rear seat folding position Fold forward rear seatback
-
Rear seat upholstery Leather rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats fixed or removable Fixed rear seats
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear windshield Fixed rear windshield
-
Rear windshield wipers Yes rear windshield wipers
-
Rearview mirror Auto-dimming rear view mirror
-
Reclining rear seats Manual reclining rear seats
-
Remote Keyless Entry w/Integrated Key Transmitter
-
Remote Releases -Inc: Power Cargo Access and Mechanical Fuel
-
Remote panic alarm
-
Roadside warranty 36 month/36,000 miles
-
Roll-Up Cargo Cover
-
Running lights LED daytime running lights
-
Satellite trial 3 month satellite trial subscription
-
Seatback storage pockets 1 seatback storage pocket
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seating capacity 5
-
Seats w/Leatherette Back Material
-
Second-row windows Power second-row windows
-
Security system
-
Seek scan
-
Selectable mode transmission
-
Service interval warning Service interval indicator
-
Shock absorbers Gas-pressurized shock absorbers
-
Shutters Active grille shutters
-
Side Impact Beams
-
Sliding Front Center Armrest and Rear Center Armrest
-
Smart device integration Apple CarPlay/Android Auto smart device mirroring
-
Spare tire Compact spare tire with steel wheel
-
Spare tire location Spare tire mounted under the cargo floor
-
Speakers Standard grade speakers
-
Speakers number 8 speakers
-
Special paint Monotone paint
-
Speed Sensitive Variable Intermittent Wipers
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Speed sensitive wipers
-
Split front seats Bucket front seats
-
Spoiler Rear lip spoiler
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Start-stop engine Idle-Stop auto stop-start engine
-
Steel Spare Wheel
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering type number of wheels 2-wheel steering system
-
Steering wheel material Leather and metal-look steering wheel
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Strut Front Suspension w/Coil Springs
-
Sunroof/Moonroof
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailgate control Tailgate/power door lock
-
Tailgate/Rear Door Lock Included w/Power Door Locks
-
Tailpipe Stainless steel quasi-dual exhaust with polished tailpipe finisher
-
Temperature display Exterior temperature display
-
Third-row windows Fixed third-row windows
-
Tinted windows Deep tinted windows
-
Tires P235/55HR19 AS BSW front and rear tires
-
Tires: 235/60R18 103H All-Season
-
Traction Control
-
Traction control All-speed ABS and driveline traction control
-
Transmission CVT
-
Transmission Type Automatic
-
Transmission electronic control
-
Transmission fluid temperature warning Transmission fluid temp warning
-
Transmission: Continuously Variable w/Sport Mode
-
Trip Computer
-
Trip computer
-
Trip odometer
-
Trunk hatch Trunk/hatch auto-latching
-
Trunk lid trim Plastic trunk lid trim
-
Trunk/Hatch Auto-Latch
-
Turbocharged
-
Turn signal in door mirrors Turn signal indicator in door mirrors
-
USB Port
-
USB ports 4 USB ports
-
Valet Function
-
Valet key
-
Variable intake manifold
-
Variable panel light Variable instrument panel light
-
Ventilated brakes Front ventilated disc brakes
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Voice activated audio controls
-
Wheel well trim Black wheel well trim
-
Wheels 19 x 7.5-inch front and rear black aluminum wheels
-
Wheels 19 x 7.5-inch front and rear machined w/painted accents aluminum whee…
-
Wheels: 18 Alloy
-
Window Trim Chrome side window trim
-
Windshield trim Black windshield trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless streaming Bluetooth wireless audio streaming