-
1.6L Turbo GDI DOHC I4 CVVD Engine
-
10.25in Display
-
12V power outlets 1 12V power outlet
-
18in x 7.5J Alloy Wheels
-
3-point seatbelt Rear seat center 3-point seatbelt
-
4-Wheel Disc Brakes
-
6 Speakers
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
ABS brakes
-
AM/FM radio: SiriusXM
-
Accessory power Retained accessory power
-
Air Conditioning
-
Air conditioning Yes
-
All-in-one key All-in-one remote fob and ignition key
-
Alternator Type Alternator
-
Android Auto
-
Antenna Window grid and roof mount audio antenna
-
Apple CarPlay
-
Apple CarPlay & Android Auto
-
Armrests front center Front seat center armrest
-
Armrests rear Rear seat center armrest
-
Auto High-beam Headlights
-
Auto door locks Auto-locking doors
-
Auto headlights Auto on/off headlight control
-
Auto high-beam headlights High Beam Assist (HBA) auto high-beam headlights
-
Automatic Emergency Braking
-
Automatic temperature control
-
Autonomous cruise control Lane Following Assist (LFA) hands-on cruise contro…
-
Aux input jack Auxiliary input jack
-
Backup Camera
-
Basic warranty 60 month/60,000 miles
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Black W/Red Stitching
-
Blind Spot Monitor
-
Blind Spot Monitor w/ Rear Cross Traffic Alert
-
Blind spot Blind-Spot Collision-Avoidance Assist (BCA) active blind spot sys…
-
Bluetooth
-
Body panels Fully galvanized steel body panels with side impact beams
-
Bodyside insert Black bodyside insert
-
Brake Assist
-
Brake assist
-
Brake assist system
-
Brake type 4-wheel disc brakes
-
Bulb warning Bulb failure warning
-
Bumper insert Black front and rear bumper inserts
-
Bumpers front Body-colored front bumper
-
Bumpers rear Body-colored rear bumper
-
Bumpers: body-color
-
Cabin air filter
-
Cargo Net
-
Cargo Side Bins
-
Cargo access Smart Trunk proximity cargo area access release
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo net
-
Cargo tie downs Cargo area tie downs
-
Cargo tray organizer Cargo area tray/organizer
-
Carpeted Floor Mats
-
Child door locks Manual rear child safety door locks
-
Climate control Automatic climate control
-
Clock Digital clock
-
Combination Cloth & Leather Seating Surfaces
-
Combination Cloth and Leather Seating Surfaces
-
Compressor Intercooled turbo
-
Configurable instrumentation gauges
-
Console insert material Metal-look console insert
-
Corrosion perforation warranty 84 month/unlimited
-
Cruise control Cruise control with steering wheel mounted controls
-
Cylinder head material Aluminum cylinder head
-
DRL preference setting
-
Day/Night rearview mirror
-
Delay off headlights Delay-off headlights
-
Delay-off headlights
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Body-colored door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Black door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirrors Power door mirrors
-
Door panel insert Metal-look door panel insert
-
Door trim insert Leatherette door trim insert
-
Drive type Front-wheel drive
-
Driver Attention Warning
-
Driver attention monitor Driver Attention Warning (DAW)
-
Driver door bin
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 2-way power lumbar
-
Driver seat direction Driver seat with 6-way directional controls
-
Driver selectable steering effort Drive Mode Select driver selectable steeri…
-
Driver vanity mirror
-
Drivetrain selectable Driver selectable drivetrain mode
-
Dual Climate Control
-
Dual front impact airbags
-
Dual front side impact airbags
-
Dual-zone front climate control
-
Dynamic Voice Recognition
-
Electronic Stability Control
-
Electronic stability control Electronic stability control system
-
Emergency SOS Blue Link Connected Car Service (3-year complimentary subscrip…
-
Emergency communication system: Blue Link Connected Car Service (3-year comp…
-
Engine 1.6L I-4 gasoline direct injection, DOHC, CVVD variable valve control…
-
Engine Cylinders I4
-
Engine Location Front mounted engine
-
Engine Mounting direction Transverse mounted engine
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gage
-
Exit warning Safe Exit Warning (SEW) external exit warning system
-
Exterior Parking Camera Rear
-
External memory External memory control
-
First Aid Kit
-
First aid kit
-
First-row sunroof First-row sliding and tilting glass sunroof with express o…
-
First-row windows Power first-row windows
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Floor mats Carpet front and rear floor mats
-
Fob engine controls Smart key with hands-free access and push button start
-
Folding door mirrors Manual folding door mirrors
-
Folding rear seats 60-40 folding rear seats
-
Forward Collision Avoidance w/ Stop
-
Forward collision warning Forward Collision-Avoidance Assist (FCA) w/Pedestr…
-
Four wheel independent suspension
-
Front Bucket Seats
-
Front Center Armrest
-
Front anti-roll Front anti-roll bar
-
Front anti-roll bar
-
Front dual zone A/C
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front reading lights
-
Front seat type Sport front bucket seats
-
Front seat upholstery Cloth and leather front seat upholstery
-
Front seatback upholstery Plastic front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Front windshield solar coating
-
Fuel Type Regular Unleaded
-
Fuel door Manual fuel door release
-
Fully automatic headlights
-
Gage cluster display size (inches) Gage cluster display size: 10.25
-
Gearshifter material Leather and metal-look gear shifter material
-
Glove box Standard glove box
-
Grille style Dark chrome grille
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Headlight type Projector beam headlights
-
Headlights Halogen headlights
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated Front Sport Bucket Seats
-
Heated Seats
-
Heated door mirrors
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated front seats
-
Heated front seats Heated driver and front passenger seats
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill start assist
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated ignition switch
-
Immobilizer
-
Instrumentation display Digital/analog instrumentation display
-
Integrated navigation Integrated navigation system with voice activation
-
Interior accents Chrome and metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet access Blue Link Connected Car Service (3-year complimentary subscr…
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob door locks Keyfob activated door locks
-
Keyless Entry
-
Keyless Start
-
LED brake lights
-
Lane Departure Warning
-
Lane Keep Assist
-
Lane departure Lane Keeping Assist (LKA)
-
Leather Seats
-
Leather Shift Knob
-
Leather steering wheel
-
Low level warnings Low level warning for fuel, washer fluid and brake fluid
-
Low tire pressure warning
-
Low tire pressure warning Tire Pressure Monitoring System tire specific low …
-
Maintenance warranty 36 month/36,000 miles
-
Manual passenger seat controls Passenger seat manual reclining, fore/aft con…
-
Moonroof
-
Multiple headlights Multiple enclosed headlights
-
Navigation
-
Navigation System
-
Number of airbags 6 airbags
-
Number of beverage holders 9 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Occupancy sensor Airbag occupancy sensor
-
Occupant sensing airbag
-
Oil pressure warning
-
One-touch down window Driver one-touch down window
-
One-touch up window Driver one-touch up window
-
Option Group 01
-
Outside temperature display
-
Overdrive transmission
-
Overhead airbag
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console
-
Overhead console Mini overhead console
-
Paint Clearcoat paint
-
Panel insert Metal-look instrument panel insert
-
Panic alarm
-
Passenger door bin
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 6-way directional control…
-
Passenger vanity mirror
-
Pedestrian detection Forward Collision-Avoidance Assist (FCA) w/Pedestrian D…
-
Perimeter approach lighting Remote activated perimeter approach lighting
-
Power Driver Seat
-
Power door mirrors
-
Power driver seat
-
Power driver seat controls Driver seat power reclining, lumbar support, fore…
-
Power moonroof
-
Power steering
-
Power windows
-
Powertrain type ICE
-
Powertrain warranty 120 month/100,000 miles
-
Preferred Accessory Package
-
Primary display size 10.2 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
Prox Key w/ Push Button Start
-
Radiator
-
Radio AM/FM/digital/SiriusXMsatellite
-
Radio: AM/FM/HD/SiriusXM Display Audio
-
Real time traffic NavTraffic real-time traffic
-
Real time weather NavWeather real-time weather
-
Rear Cross Traffic Alert
-
Rear Spoiler
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear anti-roll bar
-
Rear bench seats Rear bench seat
-
Rear camera Rear mounted camera
-
Rear cargo door Trunk
-
Rear collision warning Rear Cross-Traffic Collision-Avoidance Assist (RCCA)
-
Rear head restraint control 3 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear seat center armrest
-
Rear seat check warning Rear Occupant Alert (ROA) rear seat check warning
-
Rear seat direction Front facing rear seat
-
Rear seat folding position Fold forward rear seatback
-
Rear seat upholstery Cloth and leather rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats fixed or removable Fixed rear seats
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear windshield Fixed rear windshield
-
Rearview Camera
-
Remote keyless entry
-
Remote panic alarm
-
Roadside warranty 60 month/unlimited
-
Running lights LED daytime running lights
-
Safe Exit Warning
-
Satellite trial 3 month satellite trial subscription
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seating capacity 5
-
Second-row windows Power second-row windows
-
Security system
-
Seek scan
-
Selectable mode transmission
-
Sequential shift control Sequential shift with steering wheel controls
-
Service interval warning Blue Link Connected Car Service (3-year complimenta…
-
Shifter boot Leatherette shifter boot
-
Shock absorbers Gas-pressurized shock absorbers
-
Shutters Active grille shutters
-
Smart device integration Apple CarPlay & Android Auto smart device mirroring…
-
Smart device-as-key proximity door locks Hyundai Digital Key smart device-as…
-
Spare tire Compact spare tire with steel wheel
-
Spare tire location Spare tire mounted under the cargo floor
-
Speakers Standard grade speakers
-
Speakers number 6 speakers
-
Special paint Monotone paint
-
Speed control
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Speed-sensing steering
-
Split folding rear seat
-
Split front seats Bucket front seats
-
Spoiler
-
Spoiler Rear lip spoiler
-
Sport pedals Sport style pedals
-
Sport steering wheel
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering type number of wheels 2-wheel steering system
-
Steering wheel material Leather steering wheel
-
Steering wheel mounted audio controls
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Sunroof/Moonroof
-
Suspension Sport ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailpipe Stainless steel single exhaust with chrome tailpipe finisher
-
Telescoping steering wheel
-
Temperature display Exterior temperature display
-
Tilt steering wheel
-
Tinted windows Light tinted windows
-
Tires P235/40WR18 performance AS BSW front and rear tires
-
Traction Control
-
Traction control
-
Traction control All-speed ABS and driveline traction control
-
Transmission 7-speed auto-shift manual
-
Transmission Type Automatic
-
Transmission electronic control
-
Trip computer
-
Trip odometer
-
Trunk lid trim Carpet trunk lid trim
-
Trunk/Cargo Hook
-
Turbocharged
-
Turn-by-turn nav Blue Link Guidance (3-year subscription) turn-by-turn navig…
-
USB Port
-
USB ports 2 USB ports
-
Variable panel light Variable instrument panel light
-
Variably intermittent wipers
-
Vehicle tracker Blue Link Connected Car Service (3-year complimentary subscr…
-
Ventilated brakes Front ventilated disc brakes
-
Visor driver expandable coverage Driver visor with expandable coverage
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger expandable coverage Passenger visor with expandable coverage…
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Dynamic Voice Recognition voice activated audio contro…
-
Voice activated climate control Dynamic Voice Recognition voice-activated cl…
-
WIFI Hotspot
-
Wheels 18 x 7.5-inch front and rear machined w/painted accents aluminum whee…
-
Window Trim Black side window trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless Charging Pad
-
Wireless device charging Qi Wireless Charging front wireless smart device ch…
-
Wireless streaming Bluetooth wireless audio streaming