Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Used BMW cars for sale near Port Wentworth, GA under $1,000,000

Filters 3 Year Model Price & payment Make Mileage Body style Ext. color All filters
93 matches 30 miles from 31407
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Brooklyn Grey Metallic
Int. color: Silverstone
Drivetrain: All-wheel Drive
MPG: 22-26
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: T9122924
VIN: 5UX33EX03T9122924

Features

Convenience: Automatic Parking, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Porsche Hilton Head review

Great customer service as always.

Great customer service as always. Service advisor knowledgeable and friendly. Work completed ahead of promised time.

Vehicle information

Ext. color: White
Int. color: GRAY
Drivetrain: Four-wheel Drive
MPG: 23-33
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbo Gas
Stock #: 27751723
VIN: WBA2M9C59HV717467

Features

Convenience: Heated Steering Wheel
Entertainment: Bluetooth®
Exterior: Alloy Wheels
Safety: Backup Camera, Rain Sensing Wipers
Seating: Leather Seats, Memory Seat

Reviews

2017 BMW 230 XI review

BMW A1

Fantastic car purchased 2/2022 used with 6545 miles. My wife loves this cars handling. I love the sporty car very fast and quick. A steal for the money

Vehicle information

Ext. color: Silver Metallic
Int. color: Canberra Beige/Black
Drivetrain: All-wheel Drive
MPG: 23-33
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: LC6000A
VIN: WBAJA7C3XHG904714

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, CD Player, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2017 BMW 530 xDrive review

Beautiful BMW

This car is simply beautiful, spacious, unique color. It is gorgeous inside out. You don't see too many BMWs this color so I think it is unique color. It has one of the smoothest ride, which I find a plus for long trips. Love it!

Vehicle information

Ext. color: Black Sapphire Met
Int. color: Black
Drivetrain: Rear-wheel Drive
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: R8D96377
VIN: 3MW39FF00R8D96377

Features

Convenience: Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, LED Headlights, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

AutoNation Subaru Hilton Head review

always a pleasure to bring our car in for service,

always a pleasure to bring our car in for service, friendly, courteous staff, right on schedule, we will be back again and will recommend to our friends

Vehicle information

Ext. color: Jet Black
Int. color: Black
Drivetrain: Rear-wheel Drive
MPG: 25-33
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.0L I4 16V GDI DOHC Turbo
Stock #: MCF06741
VIN: WBA53BH04MCF06741

Features

Convenience: Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors
Entertainment: Bluetooth®, HomeLink, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Vaden Nissan of Hilton Head review

Wonderful experience

Really fast and easy experience , questions answered , so refreshing coming from somewhere where I used to wait hours to get help and was given one word answers .

2021 BMW 530 i review

Purchased a 2021 cert pre-owned from dealer w/ 26k miles.

Purchased a 2021 cert pre-owned from dealer w/ 26k miles. 530i xdrive, car handles like a true Beamer, so tight and feels great driving. A little disappointed the entire 5-series class isn't 6 cylinder however the 4 turbo feels like one anyways, only with improved gas mileage, so not really a compliant just a preference. The dealer recommended using premium fuel, and I use it maybe once a month to keep the engine running smooth and also 10k in between oil changes. Pretty nice! Would absolutely purchase again. Next major service at 80k as well.

Vehicle information

Ext. color: Brooklyn Grey Metallic
Int. color: Black
Drivetrain: Rear-wheel Drive
MPG: 23-32
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: S8F59248
VIN: 3MW43CM09S8F59248

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Remote Start
Entertainment: Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Porsche Hilton Head review

It was super easy to get an appointment.

It was super easy to get an appointment. The staff were courteous and helpful. The car was serviced in a timely banner, and I loved the video they sent through a text message showing me what needed to be repaired. They recommended some additional services. But we’re not pushy when I declined.

Vehicle information

Ext. color: WHITE
Int. color: Other
Drivetrain: Rear-wheel Drive
MPG: 22-34
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: 15339
VIN: WBA3A5C55DF358130

Features

Convenience: Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player, Premium Sound System, Satellite Radio, USB Port
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Keller's Auto Sales review

Great People- Great Service

During my 16 month stay in Savannah these people helped me to get a good, reliable car for a reasonable price. When I had a little problem, they repaired my car in no time. After these 16 month they helped me to sell the car for a good price. Always very freiendly and helpful. Special Thanks to John and Hubert !! Good luck for the future!

2013 BMW 328 328i review

5th 3

Have had 5 3 series`, and I wont drive anything else, starting with a `78 323. Love the whole layout, including the battery...surprising power for a 4 cylinder. My last was an inline 6, and this is far quicker. I`m 6 ft tall, and the back seat is , well, a back seat. You have as much legroom as the front seaters allow, but even with the front seats pulled a few inches forward, there is still ample room in front (and back). Only drawback? The shift into second can be a little abrupt, that`s about it. Thx.

Vehicle information

Ext. color: Mineral Gray Metallic
Int. color: Other
Drivetrain: Rear-wheel Drive
MPG: 23-36
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: 15457
VIN: WBA1F9C56FVW98718

Features

Convenience: Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Keller's Auto Sales review

Best car lot ever!

I have taken to long to give Keller's a great review. My wife and I bought her a car last June. No problems! I asked Jeff to find me one like it; he did and texted me. I placed a deposit the next day. We have two cars from them and I told him my next is for me. The one I just bought I'll give to my daughter. He texted two days ago about another that I told him I wanted. They do not pressure, have great customer relationships and highly competitive prices. If I don't buy this third now, I will within a year!

2015 BMW 228 228i review

In love

This car has so far met my expectations. Great handling and smooth ride. With the sport/comfort option you can really feel the power. It’s got a touch of sport, sexy, and classy

Vehicle information

Ext. color: Black Sapphire Metallic
Int. color: Tacora Red
Drivetrain: All-wheel Drive
MPG: 21-26
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: P9P13157
VIN: 5UX83DP08P9P13157

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Hilton Head BMW review

Called the day my engine light went in and they got me

Called the day my engine light went in and they got me right in! Took care of the sensor issue I had from a squirrel quickly

2023 BMW X3 M40i review

Love it.

Love it. Car is comfy, quick and the wonderful B58 Twin-Scroll Turbo I6 makes all the right noises! Awesome daily driver. Period! Interior has all of the amenities you could ever ask for. Ride is luxury-oriented but also can grip & RIP through the corners, almost as well as any sports sedan out there pretty much.

Vehicle information

Ext. color: Brooklyn Grey Metallic
Int. color: Tacora Red
Drivetrain: All-wheel Drive
MPG: 21-26
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: P9S53585
VIN: 5UX83DP07P9S53585

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Hilton Head BMW review

Enjoyed the interaction Casey, the best of customer

Enjoyed the interaction Casey, the best of customer care The wash and vacuuming prior to my picking up the car PERFECTION Spent time loitering around the yard - found next purchase - when time in correct

Vehicle information

Ext. color: Space Silver Metallic
Int. color: Red/Black Bicolor
Drivetrain: All-wheel Drive
MPG: 24-33
Fuel type: Gasoline
Transmission: 7-Speed A/T
Engine: 2L I-4 port/direct injection, DOHC, variable valve control, inte
Stock #: S5273015
VIN: WBX73EF01S5273015

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Hilton Head BMW review

Always pleasant and friendly in the service department

Always pleasant and friendly in the service department and my car drives like new now even though it is over 5 years old. Don?t plan on ever getting any other kind of car.

2025 BMW X1 xDrive28i review

Vehicle is a strong performer (no surprise here given its

Vehicle is a strong performer (no surprise here given its "M" designation. No disapointments in that regard. Sport seats are very supportive; especially with the lumbar support adjustability. Cabin tech is abysmal though. Not at all intuitive; functions nested down menus where you would never expect them. Owners manual is 480 pages! Really ! While the vehicle makes me smile quite often the complexity of the cabin tech has me cursing every time I start the vehicle. The so-called "Genius" program help line only works Mon. - Fri. Central time in the US! Not too happy about that either.

Vehicle information

Ext. color: Alpine White
Int. color: Canberra Beige
Drivetrain: Rear-wheel Drive
MPG: 26-36
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: MFL43387
VIN: WBA5R1C02MFL43387

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Hilton Head BMW review

Had appointment, easy check in.

Had appointment, easy check in. Updated they were behind and asked me if had other appointments that might be impacted. Still service conpleted in under 2 hours. Friendly and nice staff

2021 BMW 330 330i review

I absolutely love this car.

I absolutely love this car. I’ve owned it for over a year purchased and certified preowned with 26,000 miles and currently has 48,000 miles. I previously owned a 2022 Lexus iS 350 which I also liked and a 2017 Lexus iS 300 really enjoyed owning both but this one is the best of both worlds. Its fuel efficient and a joy to drive every day. Maintenance will be slightly higher than the Japanese brand. It’s a delightful vehicle for long trips. Highly recommend.

Vehicle information

Ext. color: Glacier Silver Metallic
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 25-34
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: LFJ23908
VIN: WBA5R7C09LFJ23908

Features

Convenience: Keyless Entry, Keyless Start, Navigation System
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Hilton Head BMW review

Excellent!

Excellent! Kobey and Steve are the best! I highly recommend Hilton Head BMW to anyone buying a new or used car. I have bought a few cars and would definitely go back again.

2020 BMW 330 xDrive review

Reliable

No problems in the three years I have had the car. Great for commuting and for long trips. I have had no major expenses or issues

Vehicle information

Ext. color: Black Sapphire Metallic
Int. color: Cognac
Drivetrain: Rear-wheel Drive
MPG: 25-33
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: PWY21510
VIN: WBA53BH04PWY21510

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Vehicle information

Ext. color: Alpine White
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 19-24
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: M9F36052
VIN: 5UXCW2C04M9F36052

Features

Convenience: Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Reviews

2021 BMW X7 xDrive40i review

Amazing Vehicle

I could not be more happy with this vehicle. It is amazingly quiet and comfortable, but still fun to drive. It has tons of space and the interior is impeccable. The technology is top-notch and intuitive. This one is the turbo I6 and is faster than it feels (so smooth and quiet), but lacks the “hold your breath” acceleration of the V8.

Vehicle information

Ext. color: Skyscraper Grey Metallic
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 23-27
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: R9T46447
VIN: 5UX23EU07R9T46447

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2024 BMW X5 xDrive40i review

I have this car for 26,000 miles now.

I have this car for 26,000 miles now. This is the best X5 that I have ever owned. The new engine is great on the xdrive 40i. No need for the M60. 0-60 in 3.9 seconds. Handling is great. Tires and much better than on the previous generation. The ride is tight and comfortable. They did an awesome job. Hopefully, this car will last as long as my previous 2010 X5.

Vehicle information

Ext. color: Black
Int. color: TAN
Drivetrain: Rear-wheel Drive
MPG: 23-35
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbo Gas
Stock #: 28047445
VIN: WBA8A9C36HK864297

Features

Entertainment: Bluetooth®
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Rain Sensing Wipers
Seating: Leather Seats

Reviews

2017 BMW 320 I review

Best balanced car I ever owned.

The car exceeds my expectations. It has plenty of pep and rides very comfortably. The interior is one of the nicest that I have seen. Looking forward to many years of good service.

Vehicle information

Ext. color: Black Sapphire Metallic
Int. color: Black
Drivetrain: Rear-wheel Drive
MPG: 22-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: NWX71041
VIN: WBAHF9C05NWX71041

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, LED Headlights, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Audi Hilton Head review

Very friendly people.

Very friendly people. They took my car right on time and they made very good recommendations. They explained everything to me that they were going to do with my car and even sent me a video.

Vehicle information

Ext. color: Alpine White
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 15-20
Fuel type: Gasoline
Transmission: 8-Speed A/T
Engine: 3L I-6 gasoline direct injection, DOHC, variable valve control,
Stock #: P9P74285
VIN: 5YM13EC06P9P74285

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2023 BMW X3 M AWD review

BMW X3M40i

I've had my X3M40i for 1 year and love it. Absolutely no problems at all. Just had my 1 year oil change and the oil was still clean. I highly recommend this vehicle !

Vehicle information

Ext. color: Alpine White
Int. color: Oyster w/Stitching
Drivetrain: All-wheel Drive
MPG: 25-34
Fuel type: Gasoline
Transmission: 7-Speed A/T
Engine: 2L I-4 port/direct injection, DOHC, variable valve control, inte
Stock #: P5W12951
VIN: WBX73EF07P5W12951

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2023 BMW X1 xDrive28i review

Reliable and high performance BMW x1 with excellent value

Reliable and high performance BMW x1 with excellent value for the money. It’s exactly the same as an x3, but smaller cargo space. Easily fits 2 rear passengers.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

93 matches Clear
Reset
Basics
BMW models
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only
[{"applied_filter_criteria":"{\"cpo_indicator\":false,\"make_model_trim\":[{\"make\":\"bmw\"}],\"max_price_range\":1000000,\"search_range\":\"30\",\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"used\"}","search_type":"general-inventory-search","sponsored_type_eligible":["inventory_ad"],"vehicle_array":[{"dealer_zip":"29927","nvi_program":false,"stock_sub":"","badges":["price_drop_in_cents","fair_deal"],"canonical_mmt":"BMW:X6:xDrive40i","bodystyle":"SUV","trim":"xDrive40i","msrp":"0","photo_count":25,"cpo_indicator":false,"price":"81906","certified_preowned":false,"exterior_color":"Brooklyn Grey Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5UX33EX03T9122924","interior_color":"Silverstone","drivetrain":"All-wheel Drive","customer_id":"6000964","seller_type":"dealership","dealer_name":"Porsche Hilton Head","mileage":"2341","listing_id":"5fa6ccab-3b5a-41a3-bdc3-8c67643860d0","make":"BMW","stock_type":"Used","model":"X6","cat":"luxurysuv_crossover","vertical_position":1,"cpo_package":null,"year":"2026","sponsored":false,"canonical_mmty":"BMW:X6:xDrive40i:2026","relevancy_score":null},{"dealer_zip":"31406","nvi_program":false,"stock_sub":"","badges":["good_deal"],"canonical_mmt":"BMW:230:XI","bodystyle":"Convertible","trim":"XI","msrp":null,"photo_count":26,"cpo_indicator":false,"price":"23998","certified_preowned":false,"exterior_color":"White","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA2M9C59HV717467","interior_color":"GRAY","drivetrain":"Four-wheel Drive","customer_id":"5254003","seller_type":"dealership","dealer_name":"CarMax Savannah","mileage":"33356","listing_id":"73fd6998-8f8d-439e-aeb9-6a95866d0cd9","make":"BMW","stock_type":"Used","model":"230","cat":"coupeconvertible_coupe","vertical_position":2,"cpo_package":null,"year":"2017","sponsored":false,"canonical_mmty":"BMW:230:XI:2017","relevancy_score":null},{"dealer_zip":"31406","nvi_program":false,"stock_sub":"","badges":["great_deal"],"canonical_mmt":"BMW:530:xDrive","bodystyle":"Sedan","trim":"xDrive","msrp":"0","photo_count":31,"cpo_indicator":false,"price":"21000","certified_preowned":false,"exterior_color":"Silver Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBAJA7C3XHG904714","interior_color":"Canberra Beige/Black","drivetrain":"All-wheel Drive","customer_id":"6039661","seller_type":"dealership","dealer_name":"J.C. Lewis Lincoln of Savannah","mileage":"28828","listing_id":"a4eb07cc-fc56-488f-9d0f-d4dc41a70f30","make":"BMW","stock_type":"Used","model":"530","cat":"luxurypassenger_plus","vertical_position":3,"cpo_package":null,"year":"2017","sponsored":false,"canonical_mmty":"BMW:530:xDrive:2017","relevancy_score":null},{"dealer_zip":"29927","nvi_program":false,"stock_sub":"","badges":["price_drop_in_cents","great_deal"],"canonical_mmt":"BMW:330e:330e","bodystyle":"Sedan","trim":"330e","msrp":"0","photo_count":22,"cpo_indicator":false,"price":"30862","certified_preowned":false,"exterior_color":"Black Sapphire Met","fuel_type":"Gasoline","sponsored_type":"standard","vin":"3MW39FF00R8D96377","interior_color":"Black","drivetrain":"Rear-wheel Drive","customer_id":"6000961","seller_type":"dealership","dealer_name":"AutoNation Subaru Hilton Head","mileage":"23076","listing_id":"9f46e898-2016-4c4b-8b7b-5c3eda2e4644","make":"BMW","stock_type":"Used","model":"330e","cat":"hybrid_passenger","vertical_position":4,"cpo_package":null,"year":"2024","sponsored":false,"canonical_mmty":"BMW:330e:330e:2024","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["good_deal"],"canonical_mmt":"BMW:530:i","bodystyle":"Sedan","trim":"i","msrp":null,"photo_count":30,"cpo_indicator":false,"price":"29500","certified_preowned":false,"exterior_color":"Jet Black","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA53BH04MCF06741","interior_color":"Black","drivetrain":"Rear-wheel Drive","customer_id":"209831","seller_type":"dealership","dealer_name":"Vaden Nissan of Hilton Head","mileage":"32918","listing_id":"b886b42b-c560-4684-85b0-f68e3d346b3c","make":"BMW","stock_type":"Used","model":"530","cat":"luxurypassenger_plus","vertical_position":5,"cpo_package":null,"year":"2021","sponsored":false,"canonical_mmty":"BMW:530:i:2021","relevancy_score":null},{"dealer_zip":"29927","nvi_program":false,"stock_sub":"","badges":["good_deal"],"canonical_mmt":"BMW:M240:i","bodystyle":"Convertible","trim":"i","msrp":"0","photo_count":25,"cpo_indicator":false,"price":"55275","certified_preowned":false,"exterior_color":"Brooklyn Grey Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"3MW43CM09S8F59248","interior_color":"Black","drivetrain":"Rear-wheel Drive","customer_id":"6000964","seller_type":"dealership","dealer_name":"Porsche Hilton Head","mileage":"2063","listing_id":"d0848aff-5112-4195-ae83-3db7eb590b1e","make":"BMW","stock_type":"Used","model":"M240","cat":"coupeconvertible_coupesport","vertical_position":6,"cpo_package":null,"year":"2025","sponsored":false,"canonical_mmty":"BMW:M240:i:2025","relevancy_score":null},{"dealer_zip":"31419","nvi_program":false,"stock_sub":"","badges":["good_deal"],"canonical_mmt":"BMW:328:328i","bodystyle":"Sedan","trim":"328i","msrp":"0","photo_count":22,"cpo_indicator":false,"price":"8995","certified_preowned":false,"exterior_color":"WHITE","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA3A5C55DF358130","interior_color":"Other","drivetrain":"Rear-wheel Drive","customer_id":"190592","seller_type":"dealership","dealer_name":"Keller's Auto Sales","mileage":"123978","listing_id":"912fa337-e308-41bd-a655-0afae27aeb5e","make":"BMW","stock_type":"Used","model":"328","cat":"luxurypassenger_standard","vertical_position":7,"cpo_package":null,"year":"2013","sponsored":false,"canonical_mmty":"BMW:328:328i:2013","relevancy_score":null},{"dealer_zip":"31419","nvi_program":false,"stock_sub":"","badges":["fair_deal"],"canonical_mmt":"BMW:228:228i","bodystyle":"Coupe","trim":"228i","msrp":"0","photo_count":22,"cpo_indicator":false,"price":"11450","certified_preowned":false,"exterior_color":"Mineral Gray Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA1F9C56FVW98718","interior_color":"Other","drivetrain":"Rear-wheel Drive","customer_id":"190592","seller_type":"dealership","dealer_name":"Keller's Auto Sales","mileage":"112752","listing_id":"3dccf8df-9527-4ff1-8cf1-6c1b648882e8","make":"BMW","stock_type":"Used","model":"228","cat":"coupeconvertible_coupe","vertical_position":8,"cpo_package":null,"year":"2015","sponsored":false,"canonical_mmty":"BMW:228:228i:2015","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["price_drop_in_cents","great_deal","cpo"],"canonical_mmt":"BMW:X3:M40i","bodystyle":"SUV","trim":"M40i","msrp":"0","photo_count":35,"cpo_indicator":true,"price":"44300","certified_preowned":true,"exterior_color":"Black Sapphire Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5UX83DP08P9P13157","interior_color":"Tacora Red","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"33745","listing_id":"a1630738-8fe3-4ec8-a8b9-952d9daeca34","make":"BMW","stock_type":"Used","model":"X3","cat":"luxurysuv_crossover","vertical_position":9,"cpo_package":"BMW","year":"2023","sponsored":true,"canonical_mmty":"BMW:X3:M40i:2023","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["price_drop_in_cents","good_deal","cpo"],"canonical_mmt":"BMW:X3:M40i","bodystyle":"SUV","trim":"M40i","msrp":"0","photo_count":36,"cpo_indicator":true,"price":"51700","certified_preowned":true,"exterior_color":"Brooklyn Grey Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5UX83DP07P9S53585","interior_color":"Tacora Red","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"9722","listing_id":"eb00ff54-7ddc-47c3-9820-b7c2d129f72e","make":"BMW","stock_type":"Used","model":"X3","cat":"luxurysuv_crossover","vertical_position":10,"cpo_package":"BMW","year":"2023","sponsored":true,"canonical_mmty":"BMW:X3:M40i:2023","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["great_deal","cpo"],"canonical_mmt":"BMW:X1:xDrive28i","bodystyle":"SUV","trim":"xDrive28i","msrp":"0","photo_count":34,"cpo_indicator":true,"price":"39300","certified_preowned":true,"exterior_color":"Space Silver Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBX73EF01S5273015","interior_color":"Red/Black Bicolor","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"17628","listing_id":"cfb04bf8-7264-43a6-a73e-7ca56f59c9b1","make":"BMW","stock_type":"Used","model":"X1","cat":"luxurysuv_crossover","vertical_position":11,"cpo_package":"BMW","year":"2025","sponsored":true,"canonical_mmty":"BMW:X1:xDrive28i:2025","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["fair_deal"],"canonical_mmt":"BMW:330:330i","bodystyle":"Sedan","trim":"330i","msrp":"0","photo_count":35,"cpo_indicator":false,"price":"28700","certified_preowned":false,"exterior_color":"Alpine White","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA5R1C02MFL43387","interior_color":"Canberra Beige","drivetrain":"Rear-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"40797","listing_id":"71428781-cbcd-4839-b87e-a7d0fa3e0ce9","make":"BMW","stock_type":"Used","model":"330","cat":"luxurypassenger_standard","vertical_position":12,"cpo_package":null,"year":"2021","sponsored":false,"canonical_mmty":"BMW:330:330i:2021","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["good_deal"],"canonical_mmt":"BMW:330:xDrive","bodystyle":"Sedan","trim":"xDrive","msrp":"0","photo_count":35,"cpo_indicator":false,"price":"25600","certified_preowned":false,"exterior_color":"Glacier Silver Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA5R7C09LFJ23908","interior_color":"Black","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"48506","listing_id":"fc6959a9-cfce-42a2-89a7-ca6847a54b18","make":"BMW","stock_type":"Used","model":"330","cat":"luxurypassenger_standard","vertical_position":13,"cpo_package":null,"year":"2020","sponsored":false,"canonical_mmty":"BMW:330:xDrive:2020","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["good_deal","hot_car","cpo"],"canonical_mmt":"BMW:530:i","bodystyle":"Sedan","trim":"i","msrp":"0","photo_count":35,"cpo_indicator":true,"price":"36900","certified_preowned":true,"exterior_color":"Black Sapphire Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA53BH04PWY21510","interior_color":"Cognac","drivetrain":"Rear-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"31725","listing_id":"a5d75cf8-9df6-4c15-8228-529a60bac79f","make":"BMW","stock_type":"Used","model":"530","cat":"luxurypassenger_plus","vertical_position":14,"cpo_package":"BMW","year":"2023","sponsored":true,"canonical_mmty":"BMW:530:i:2023","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["great_deal"],"canonical_mmt":"BMW:X7:xDrive40i","bodystyle":"SUV","trim":"xDrive40i","msrp":"0","photo_count":36,"cpo_indicator":false,"price":"36900","certified_preowned":false,"exterior_color":"Alpine White","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5UXCW2C04M9F36052","interior_color":"Black","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"82341","listing_id":"db3b4a0b-2e28-423d-b4f1-e026eb2ca6c3","make":"BMW","stock_type":"Used","model":"X7","cat":"luxurysuv_crossover","vertical_position":15,"cpo_package":null,"year":"2021","sponsored":false,"canonical_mmty":"BMW:X7:xDrive40i:2021","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["fair_deal","american_made_index_ranking"],"canonical_mmt":"BMW:X5:xDrive40i","bodystyle":"SUV","trim":"xDrive40i","msrp":"0","photo_count":33,"cpo_indicator":false,"price":"56700","certified_preowned":false,"exterior_color":"Skyscraper Grey Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5UX23EU07R9T46447","interior_color":"Black","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"33819","listing_id":"6ae93adb-0640-4e65-9ef3-c77f217ae64d","make":"BMW","stock_type":"Used","model":"X5","cat":"luxurysuv_crossover","vertical_position":16,"cpo_package":null,"year":"2024","sponsored":false,"canonical_mmty":"BMW:X5:xDrive40i:2024","relevancy_score":null},{"dealer_zip":"31406","nvi_program":false,"stock_sub":"","badges":[],"canonical_mmt":"BMW:320:I","bodystyle":"Sedan","trim":"I","msrp":null,"photo_count":26,"cpo_indicator":false,"price":"18998","certified_preowned":false,"exterior_color":"Black","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBA8A9C36HK864297","interior_color":"TAN","drivetrain":"Rear-wheel Drive","customer_id":"5254003","seller_type":"dealership","dealer_name":"CarMax Savannah","mileage":"44924","listing_id":"6f4bd131-a4d9-4f61-8b2d-a41ff8299df2","make":"BMW","stock_type":"Used","model":"320","cat":"luxurypassenger_standard","vertical_position":17,"cpo_package":null,"year":"2017","sponsored":false,"canonical_mmty":"BMW:320:I:2017","relevancy_score":null},{"dealer_zip":"29927","nvi_program":false,"stock_sub":"","badges":["price_drop_in_cents","good_deal"],"canonical_mmt":"BMW:Z4:M40i","bodystyle":"Convertible","trim":"M40i","msrp":"0","photo_count":23,"cpo_indicator":false,"price":"49015","certified_preowned":false,"exterior_color":"Black Sapphire Metallic","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBAHF9C05NWX71041","interior_color":"Black","drivetrain":"Rear-wheel Drive","customer_id":"6000992","seller_type":"dealership","dealer_name":"Audi Hilton Head","mileage":"8228","listing_id":"f8b48873-8b07-47f0-ac0c-448bbd6ece93","make":"BMW","stock_type":"Used","model":"Z4","cat":"coupeconvertible_convertible","vertical_position":18,"cpo_package":null,"year":"2022","sponsored":false,"canonical_mmty":"BMW:Z4:M40i:2022","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["fair_deal"],"canonical_mmt":"BMW:X3 M:AWD","bodystyle":"SUV","trim":"AWD","msrp":"0","photo_count":35,"cpo_indicator":false,"price":"62800","certified_preowned":false,"exterior_color":"Alpine White","fuel_type":"Gasoline","sponsored_type":"standard","vin":"5YM13EC06P9P74285","interior_color":"Black","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"52521","listing_id":"52fc817b-b056-47f7-880f-6ff9f68c80ed","make":"BMW","stock_type":"Used","model":"X3 M","cat":"luxurysuv_crossover","vertical_position":19,"cpo_package":null,"year":"2023","sponsored":false,"canonical_mmty":"BMW:X3 M:AWD:2023","relevancy_score":null},{"dealer_zip":"29910","nvi_program":false,"stock_sub":"","badges":["good_deal","cpo"],"canonical_mmt":"BMW:X1:xDrive28i","bodystyle":"SUV","trim":"xDrive28i","msrp":"0","photo_count":36,"cpo_indicator":true,"price":"33500","certified_preowned":true,"exterior_color":"Alpine White","fuel_type":"Gasoline","sponsored_type":"standard","vin":"WBX73EF07P5W12951","interior_color":"Oyster w/Stitching","drivetrain":"All-wheel Drive","customer_id":"209811","seller_type":"dealership","dealer_name":"Hilton Head BMW","mileage":"20121","listing_id":"45abe511-b1ed-4c42-9708-0803fab58cd4","make":"BMW","stock_type":"Used","model":"X1","cat":"luxurysuv_crossover","vertical_position":20,"cpo_package":"BMW","year":"2023","sponsored":true,"canonical_mmty":"BMW:X1:xDrive28i:2023","relevancy_score":null}]}]