Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Used Genesis cars for sale near Hillside, IL under $899,990

Filters 3 Year Model Price & payment Make Mileage Body style Ext. color All filters
235 matches 30 miles from 60162
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Uyuni White
Int. color: Black
Drivetrain: Rear-wheel Drive
MPG: 16-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 5.0L V8 32V GDI DOHC
Stock #: GD250958AAA
VIN: KMTF54PH4LU076821

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, CD Player, DVD Player, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of Downers Grove review

I bought my car G80 here when it was Pugi ,and I had

I bought my car G80 here when it was Pugi ,and I had service issues with GPS. I was begging to think I made a mistake buying a Genesis. Since Castel took over, they had some issues in the transition. But Castle has changed how I feel about Genesis. I really see them striving to achieve a premium service. Great Job Castle Genesis. Thank you for changing how I feel about my Genesis purchase again. And the G80 is truly a premium car Thank you.

2020 Genesis G90 5.0 Ultimate review

Outstanding in every way

I bought my G90 Ultimate AWD new about four years ago and have loved it ever since. It is comfortable and many have mistaken it for a Bentley. I've driven newer G90s which do not compare to the 2020 model. I will never part with this vehicle until it falls apart which will probably be years from now as I've never had a maintenance problem.

Vehicle information

Ext. color: Red
Int. color: TAN
Drivetrain: Four-wheel Drive
MPG: 22-28
Fuel type: Gasoline
Transmission: Automatic
Engine: Turbo Gas
Stock #: 27356771
VIN: KMUMADTBXPU109536

Features

Convenience: Heated Steering Wheel, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Blind Spot Monitor, Lane Departure Warning, Rain Sensing Wipers
Seating: Leather Seats, Memory Seat

Reviews

CarMax Naperville review

Price listed is the price you pay!

Dealt with this CarMax dealer over the phone and email. Tried to negotiate a price based on other dealers in the area for the same vehicle and was told that the price listed was the price you pay!

2023 Genesis GV70 review

Great SUV

Good value,Safety, amazing technology. Luxury for slightly more then std midsize suvs GV70’s Technology is work in progress and I suspect more improvement will happen in the future … Plus more safety features will be added

Vehicle information

Ext. color: Savile Silver
Int. color: Bordeaux Red
Drivetrain: All-wheel Drive
MPG: 16-22
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.5L V6 24V PDI DOHC Twin Turbo
Stock #: G9195
VIN: KMUHEESC2TU296173

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Vehicle information

Ext. color: Makalu Gray Matte
Int. color: Black/Black
Drivetrain: All-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.5L V6 CYLINDER
Stock #: 8957
VIN: KMUHCESC5RU177080

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Driven Auto of Oak Forest review

Brazil at Driven Auto of Oak Forest was AMAZING.

Brazil at Driven Auto of Oak Forest was AMAZING. He was very helpful and knowledgeable. Amir the finance manager was patient, understanding and helpful.

2024 Genesis GV80 3.5T review

Better than the German Trios

I’ve had a GLE and an Audi Q7 and this has truly been the only car I’ve bought and loved the longer I had it. The design to the technology is beyond what I was offered elsewhere at this price point.

Vehicle information

Ext. color: Vik Black
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 19-25
Fuel type: Gasoline
Transmission: Automatic
Engine: Twin Turbo Premium Unleaded V-6 3.5 L/212
Stock #: F11067
VIN: KMUMCDTC9NU022937

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Bluetooth®, HomeLink
Exterior: Sunroof/Moonroof
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Family Hyundai review

It was really a low pressure experience my salesman,

It was really a low pressure experience my salesman, Garret was awesome as well as the finance guy Ruben, the only issue was when I got the car home a few days later I had to jumpstart the vehicle due to a bad battery.

2022 Genesis GV70 3.5T Sport review

I’ll buy again

Bought this as one of the first gv70 an out. The car is probably one of the nicest cars I’ve owned, I’m 76 so I’ve had a few. Great styling inside and out. Service has been a struggle at some dealers. I have 18,000 miles on the car and so far no complaints

Vehicle information

Ext. color: Vik Black
Int. color: Blue
Drivetrain: All-wheel Drive
MPG: 19-25
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 port/direct injection, DOHC, variable valve control, tw
Stock #: Z2525
VIN: KMUMCDTC3NU010721

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Old Orchard Nissan review

buena atención Joel Hernández muy amable y calidad en

buena atención Joel Hernández muy amable y calidad en servicio y rapidez en su trabajo

2022 Genesis GV70 3.5T AWD Sport review

As fine a vehicle as any on the market

I looked at a few SUV's and amongst Porsche, Audi and Mercedes, and found for comfort, ride, power and value, Genesis was my perfect choice. I leased the Genesis October 2021 and 27 months ago. I have had zero issue, nothing. They send you a monthly "health report" and it's always perfect. every month Genesis send up and update.The service I had in October, they aded some washer fluid. That's it! Driving is a pleasure, performance better than you would expect for a SUV, and when the Turbos kick in, you pass the others quickly. The car is very well built and especially quiet. The electronics are amazing, so many options at your finger tips. If you are considering a new car, be it an SUV or Sedan, I highly recommend your test driving Genesis

Vehicle information

Ext. color: Mallorca Blue
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 17-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic with SHIFTRONIC
Engine: Lambda 3.3L V-6 gasoline direct injection, DOHC, D-CVVT variable
Stock #: X5426A
VIN: KMTFN4JB1LU329601

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

McGrath Acura of Libertyville review

My sales guy Andre was a pleasure to work with.

My sales guy Andre was a pleasure to work with. He made the sale smooth and took care of business quickly and efficiently.

2020 Genesis G80 3.3T Sport review

Love our G80

Has lived up to all of our expectations. Lack of a nearby Genesis Dealer?Service Center has been the only drawback as the closest one is 30+ miles away. As a result the free Valet service offered by Genesis requires many weeks of advanced notice.

Vehicle information

Ext. color: Capri Blue
Int. color: Black/Black
Drivetrain: All-wheel Drive
MPG: 22-28
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L I-4 port/direct injection, DOHC, variable valve control, in
Stock #: G2614A
VIN: 5NMMADTB0SH024515

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of Aurora review

I had an excellent experience at this dealership?

I had an excellent experience at this dealership?the staff was knowledgeable, friendly, and honest, making the car-buying process smooth and stress-free. Highly recommend for great deals and top-notch customer service!

2025 Genesis GV70 2.5T AWD review

Bought my GV70 with 2000 miles on it and it was no

Bought my GV70 with 2000 miles on it and it was no different than a new one. I love it very much for my first high end SUV. I'm still learning all the stuff inside but it makes it more exciting to learn. It is just as quick as the 3.5 and the power is great for me with the 2.5 turbo engine with 300HP is enough for me. Very cool looking too. I'm going to say that the Milford Genesis dealership has been great 👍 Evan is always polite and very professional and he always has a smile when he greets me.

Vehicle information

Ext. color: Vik Black
Int. color: Frozen Gray/Urban Brown
Drivetrain: All-wheel Drive
MPG: 22-28
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.5L I-4 port/direct injection, DOHC, variable valve control, in
Stock #: GKBB008
VIN: 5NMMBDTB5TH040823

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of Aurora review

Everyone was super welcoming, and the hospitality was

Everyone was super welcoming, and the hospitality was great. Kurt is an amazing person to work with, I?ll always recommend him for any business.

2026 Genesis GV70 2.5T Advanced review

Very attractive car handles beautifully all the features

Very attractive car handles beautifully all the features are easy to operate and easy to learn.This is my second Genesis and I highly recommend it to anyone looking to purchase a luxury vehicle.

Vehicle information

Ext. color: Himalayan Gray
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 17-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.3L V6 24V GDI DOHC Twin Turbo
Stock #: U10429
VIN: KMHG34JA6JU039573

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Remote Start
Entertainment: Bluetooth®, CD Player, DVD Player, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of Highland Park review

1 contact and best pricing all in less then an hour best

1 contact and best pricing all in less then an hour best buying experience I have ever had

2018 Genesis G90 3.3T Premium review

One of the most reliable vehicles I’ve owned!!!

This vehicle can be placed along side of the Mercedes, BMW, Audi, Lexus, etc. I test drove all of the previously mentioned vehicles and the G90 provides all of what I wanted and with extra features. You get more bang for you buck!!!! No Buyers Remorse on this end!!!!

Vehicle information

Ext. color: Vik Black
Int. color: Black/Black
Drivetrain: All-wheel Drive
MPG: 20-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.5L I-4 port/direct injection, DOHC, variable valve control, in
Stock #: P1507
VIN: KMUHBDSB4RU193954

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Zeigler Chevrolet review

Ted was great it was a great experience this is my fifth

Ted was great it was a great experience this is my fifth car I bought from this place

2024 Genesis GV80 2.5T review

Brand New

I have had this vehicle less than a week, 250 miles driven. The navigation settings have been difficult and the screen setup still needs work. The custom seat setting feature was amazing. The seats are very comfortable. It is a nice driving vehicle.

Vehicle information

Ext. color: Uyuni White
Int. color: Nnb
Drivetrain: All-wheel Drive
MPG: 18-24
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 port/direct injection, DOHC, variable valve control, tw
Stock #: G71402A
VIN: KMUMCDTC2SU192195

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of North Aurora review

Salesperson Seth Greene was very patient and understood

Salesperson Seth Greene was very patient and understood our objectives. Physical dealership itself was very clean and portrayed the proper image for a Genesis vehicle in my estimation. Had an issue days after purchase and was promptly taken care of by the service manager Ken and Seth. All things considered the experience was good and Seth has provided good follow up and teachings of the vehicle after the purchase.

2025 Genesis GV70 3.5T AWD Sport review

We are 12,000 miles into our new GV70, and so far we love

We are 12,000 miles into our new GV70, and so far we love it. We had a Volvo XC90 for 13+ years, and we loved it, too. But the GV70 is quieter, faster, and more comfortable than our Volvo. Our only complaint is the level of electronic control for almost everything. I long for the days of analog controls in a car. Other than that, I HIGHLY recommend the Genesis GV70.

Vehicle information

Ext. color: Vik Black
Int. color: Obsidian Black
Drivetrain: All-wheel Drive
MPG: 20-29
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.5L I4 16V PDI DOHC Turbo
Stock #: ZB1283
VIN: KMTGB4SC5SU253688

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Vehicle information

Ext. color: Himalayan Gray
Int. color: Black/Black
Drivetrain: All-wheel Drive
MPG: 16-23
Fuel type: Gasoline
Transmission: Automatic
Engine: 5L V-8 gasoline direct injection, DOHC, variable valve control,
Stock #: 9980
VIN: KMTF54PH1NU092638

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, DVD Player, HomeLink, Rear Seat Entertainment, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Lux Cars Chicago review

Fast simple car buying

Fast and easy experience here was greeted by Joel who was very friendly after flying in from NY pick up my beautiful bmw m5 would highly recommend!

Vehicle information

Ext. color: Vik Black
Int. color: Black / Beige
Drivetrain: All-wheel Drive
MPG: 20-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.5L I4 16V PDI DOHC Turbo
Stock #: PGD0340
VIN: KMUHBDSB8PU103752

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio
Exterior: Alloy Wheels
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Genesis of Downers Grove review

Sales associates where friendly,knowledgeable and

Sales associates where friendly,knowledgeable and listened to my concerns about the car good experience

2023 Genesis GV80 2.5T review

Perfect Vehicle

The GV80 is extremely safe and operates smoothly, in harmony with different driver preferences. It handles perfectly in the snow and ice with different drive mode options. Looking forward to another GV80 after this one !

Vehicle information

Ext. color: Vik Black
Int. color: Bordeaux Brown/Slate Gray
Drivetrain: All-wheel Drive
MPG: 16-22
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 port/direct injection, DOHC, D-CVVT variable valve cont
Stock #: L251360A
VIN: KMUHEESC9SU225860

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Fields Lexus Glenview review

Great detail to attention and very courteous.

Great detail to attention and very courteous. All the staff were amazing! Will highly recommend taking your vehicle to Field’s Lexus!

2025 Genesis GV80 3.5T review

Owned the GV80 for 6 months, the smaller engine is

Owned the GV80 for 6 months, the smaller engine is plenty. The ride is better than my 2018 Lexus rx350L. Only draw back navigation good be better.

Vehicle information

Ext. color: Adriatic Blue
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 18-23
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.5L V6 24V PDI DOHC Twin Turbo
Stock #: GD250984A
VIN: KMUHCESC5PU119273

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2023 Genesis GV80 3.5T review

A head turner

Plain and simple its a great s.u.v. , people notice this vehicle and I have had many good comments about it. Strangers have come up to me and asked if its a Bentley . Wow

Vehicle information

Ext. color: Caspian Black
Int. color: Beige
Drivetrain: All-wheel Drive
MPG: 17-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.3L V6 24V GDI DOHC Twin Turbo
Stock #: A4212
VIN: KMHG34JAXHU026562

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Navigation System, Remote Start
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Affinity Auto Sales review

Great selection of cars.

Great selection of cars. I bought my Tesla at Affinity and couldn't be happier. After going to a few different places Affinity had the cleanest and by far the best service. I will be back again when the time comes.

2017 Genesis G90 3.3T Premium review

Only brand around

Nice line, very load it !!! No many cars this kind around 100 miles, It is in excellent shape inside outside Beautiful color just close to 13,000 miles The “price” is Right .

Vehicle information

Ext. color: Savile Silver
Int. color: Obsidian Black
Drivetrain: All-wheel Drive
Fuel type: Electric
Transmission: 1-Speed Automatic
Engine: Electric
Stock #: G6709
VIN: KMUKCDSC8RU020451

Features

Convenience: Adaptive Cruise Control, Heated Steering Wheel, Navigation System, Power Liftgate
Entertainment: Bluetooth®, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Napleton Hyundai of Glenview review

ASK FOR KEVIN

Kevin was the best got exactly what I wanted because of him! A brand new 2022 with only 53 miles I wanted to cry! Definitely the man to see

Vehicle information

Ext. color: Savile Silver
Int. color: Gray
Drivetrain: All-wheel Drive
MPG: 20-28
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.5L I4 16V PDI DOHC Turbo
Stock #: 284300
VIN: KMTG34SC5RU143425

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System
Entertainment: Bluetooth®, HomeLink, Satellite Radio
Exterior: Alloy Wheels
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

Chignoli Auto Sales review

trustworthy for life

A friend recommended Chignoli to me for a used car. He has bought all his cars from them for decades. Now, I plan to buy all my cars from them from now on. They don't push you to buy. They ask what you are looking for, and your price range. They listen. Then, if they don't have it on the lot, they go hunting for what you want. They won't sell you a cheap lemon. And they offer a solid warranty. Our family bought two used cars from them in the past two years. Both run great. We couldn't be happier.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

235 matches Clear
Reset
Basics
Genesis models
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only

Used Genesis by price

Genesis under $899,990 by city

Genesis under $899,990 in Hillside, IL by model

[{"applied_filter_criteria":"{\"cpo_indicator\":false,\"make_model_trim\":[{\"make\":\"genesis\"}],\"max_price_range\":899990,\"search_range\":\"30\",\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"used\"}","search_type":"general-inventory-search","sponsored_type_eligible":["inventory_ad"],"vehicle_array":[{"sponsored_type":"standard","dealer_name":"Genesis of Downers Grove","interior_color":"Black","cpo_package":null,"price":"34600","vin":"KMTF54PH4LU076821","trim":"5.0 Ultimate","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G90:5.0 Ultimate:2020","year":"2020","vertical_position":1,"msrp":null,"bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G90:5.0 Ultimate","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60515","drivetrain":"Rear-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_plus","customer_id":"6063725","make":"Genesis","photo_count":42,"mileage":"40907","badges":["price_drop_in_cents","fair_deal"],"exterior_color":"Uyuni White","listing_id":"c6614a18-b96a-470e-96c1-1af27e0cb639","model":"G90"},{"sponsored_type":"standard","dealer_name":"CarMax Naperville","interior_color":"TAN","cpo_package":null,"price":"38998","vin":"KMUMADTBXPU109536","trim":null,"fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV70::2023","year":"2023","vertical_position":2,"msrp":null,"bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV70:","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60563","drivetrain":"Four-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"172871","make":"Genesis","photo_count":28,"mileage":"30766","badges":["good_deal"],"exterior_color":"Red","listing_id":"c27068c2-167a-4127-97ff-e6e2547d7880","model":"GV70"},{"sponsored_type":"standard","dealer_name":"Genesis of Schaumburg","interior_color":"Bordeaux Red","cpo_package":null,"price":"75588","vin":"KMUHEESC2TU296173","trim":"3.5T Prestige","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:3.5T Prestige:2026","year":"2026","vertical_position":3,"msrp":null,"bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:3.5T Prestige","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60173","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6000882","make":"Genesis","photo_count":39,"mileage":"1984","badges":["price_drop_in_cents","fair_deal"],"exterior_color":"Savile Silver","listing_id":"d8a09b04-7d5c-4e1b-947a-64b4dd78ac26","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Driven Auto of Oak Forest","interior_color":"Black/Black","cpo_package":null,"price":"44980","vin":"KMUHCESC5RU177080","trim":"3.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:3.5T:2024","year":"2024","vertical_position":4,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:3.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60452","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"5378991","make":"Genesis","photo_count":55,"mileage":"55016","badges":["good_deal"],"exterior_color":"Makalu Gray Matte","listing_id":"8f38996d-e417-441e-a4fd-395368287906","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Family Hyundai","interior_color":"Black","cpo_package":null,"price":"40988","vin":"KMUMCDTC9NU022937","trim":"3.5T Sport","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV70:3.5T Sport:2022","year":"2022","vertical_position":5,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV70:3.5T Sport","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60477","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"187778","make":"Genesis","photo_count":37,"mileage":"34448","badges":["price_drop_in_cents","fair_deal"],"exterior_color":"Vik Black","listing_id":"25adba2e-e9e1-44c1-9175-70b57b185fdb","model":"GV70"},{"sponsored_type":"standard","dealer_name":"Old Orchard Nissan","interior_color":"Blue","cpo_package":null,"price":"32333","vin":"KMUMCDTC3NU010721","trim":"3.5T AWD Sport","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV70:3.5T AWD Sport:2022","year":"2022","vertical_position":6,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV70:3.5T AWD Sport","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60077","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6062659","make":"Genesis","photo_count":24,"mileage":"53909","badges":["price_drop_in_cents","great_deal"],"exterior_color":"Vik Black","listing_id":"85744784-4369-4fd4-a9c8-ce49014f2659","model":"GV70"},{"sponsored_type":"standard","dealer_name":"McGrath Acura of Libertyville","interior_color":"Black","cpo_package":null,"price":"22847","vin":"KMTFN4JB1LU329601","trim":"3.3T Sport","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G80:3.3T Sport:2020","year":"2020","vertical_position":7,"msrp":"0","bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G80:3.3T Sport","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60048","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_standard","customer_id":"5381876","make":"Genesis","photo_count":31,"mileage":"87334","badges":["price_drop_in_cents","good_deal"],"exterior_color":"Mallorca Blue","listing_id":"a80bef68-c586-4240-86d4-bdb7877e17ce","model":"G80"},{"sponsored_type":"standard","dealer_name":"Genesis of Aurora","interior_color":"Black/Black","cpo_package":null,"price":"43000","vin":"5NMMADTB0SH024515","trim":"2.5T AWD","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV70:2.5T AWD:2025","year":"2025","vertical_position":8,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV70:2.5T AWD","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60504","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6041273","make":"Genesis","photo_count":23,"mileage":"9095","badges":["great_deal","american_made_index_ranking"],"exterior_color":"Capri Blue","listing_id":"bea3f245-4d94-4e4b-8941-0e4dfef383de","model":"GV70"},{"sponsored_type":"standard","dealer_name":"Genesis of Aurora","interior_color":"Frozen Gray/Urban Brown","cpo_package":null,"price":"50750","vin":"5NMMBDTB5TH040823","trim":"2.5T Advanced","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV70:2.5T Advanced:2026","year":"2026","vertical_position":9,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV70:2.5T Advanced","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60504","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6041273","make":"Genesis","photo_count":27,"mileage":"2470","badges":["good_deal"],"exterior_color":"Vik Black","listing_id":"9de978d6-9a9e-478b-b1c4-1bd76c001413","model":"GV70"},{"sponsored_type":"standard","dealer_name":"Genesis of Highland Park","interior_color":"Black","cpo_package":null,"price":"15431","vin":"KMHG34JA6JU039573","trim":"3.3T Premium","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G90:3.3T Premium:2018","year":"2018","vertical_position":10,"msrp":null,"bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G90:3.3T Premium","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60035","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_plus","customer_id":"6041337","make":"Genesis","photo_count":59,"mileage":"126283","badges":["price_drop_in_cents","fair_deal"],"exterior_color":"Himalayan Gray","listing_id":"a4371d29-3f6d-4365-88b9-6f3fc7a6405a","model":"G90"},{"sponsored_type":"standard","dealer_name":"Zeigler Chevrolet","interior_color":"Black/Black","cpo_package":null,"price":"36067","vin":"KMUHBDSB4RU193954","trim":"2.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:2.5T:2024","year":"2024","vertical_position":11,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:2.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60173","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"202297","make":"Genesis","photo_count":31,"mileage":"34306","badges":["price_drop_in_cents","fair_deal"],"exterior_color":"Vik Black","listing_id":"9cf708d4-7f13-4bce-8bb4-494f18f91cc4","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Genesis of North Aurora","interior_color":"Nnb","cpo_package":"Genesis","price":"52533","vin":"KMUMCDTC2SU192195","trim":"3.5T AWD Sport","fuel_type":"Gasoline","sponsored":true,"stock_sub":"","canonical_mmty":"Genesis:GV70:3.5T AWD Sport:2025","year":"2025","vertical_position":12,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":true,"canonical_mmt":"Genesis:GV70:3.5T AWD Sport","seller_type":"dealership","cpo_indicator":true,"dealer_zip":"60542","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6041652","make":"Genesis","photo_count":35,"mileage":"18476","badges":["price_drop_in_cents","good_deal","american_made_index_ranking","cpo"],"exterior_color":"Uyuni White","listing_id":"7e412639-4478-4098-8af4-6d3fff35ae9a","model":"GV70"},{"sponsored_type":"standard","dealer_name":"Genesis of Schaumburg","interior_color":"Obsidian Black","cpo_package":"Genesis","price":"49795","vin":"KMTGB4SC5SU253688","trim":"2.5T","fuel_type":"Gasoline","sponsored":true,"stock_sub":"","canonical_mmty":"Genesis:G80:2.5T:2025","year":"2025","vertical_position":13,"msrp":null,"bodystyle":"Sedan","stock_type":"Used","certified_preowned":true,"canonical_mmt":"Genesis:G80:2.5T","seller_type":"dealership","cpo_indicator":true,"dealer_zip":"60173","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_standard","customer_id":"6000882","make":"Genesis","photo_count":39,"mileage":"5776","badges":["good_deal","cpo"],"exterior_color":"Vik Black","listing_id":"2b1e5c43-696e-4873-805f-650f96671a20","model":"G80"},{"sponsored_type":"standard","dealer_name":"Lux Cars Chicago","interior_color":"Black/Black","cpo_package":null,"price":"39644","vin":"KMTF54PH1NU092638","trim":"5.0 Ultimate","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G90:5.0 Ultimate:2022","year":"2022","vertical_position":14,"msrp":"0","bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G90:5.0 Ultimate","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60089","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_plus","customer_id":"210217","make":"Genesis","photo_count":59,"mileage":"66796","badges":["good_deal","hot_car"],"exterior_color":"Himalayan Gray","listing_id":"b9e0de40-c280-4180-b674-7871213c5773","model":"G90"},{"sponsored_type":"standard","dealer_name":"Genesis of Downers Grove","interior_color":"Black / Beige","cpo_package":null,"price":"37125","vin":"KMUHBDSB8PU103752","trim":"2.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:2.5T:2023","year":"2023","vertical_position":15,"msrp":null,"bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:2.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60515","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6063725","make":"Genesis","photo_count":12,"mileage":"63531","badges":["price_drop_in_cents","good_deal"],"exterior_color":"Vik Black","listing_id":"2e4eec8e-85fc-4d76-8c07-90608f5030f1","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Fields Lexus Glenview","interior_color":"Bordeaux Brown/Slate Gray","cpo_package":null,"price":"64995","vin":"KMUHEESC9SU225860","trim":"3.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:3.5T:2025","year":"2025","vertical_position":16,"msrp":"0","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:3.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60025","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"5390967","make":"Genesis","photo_count":34,"mileage":"16878","badges":["fair_deal"],"exterior_color":"Vik Black","listing_id":"f1ee3cff-2d61-416e-9dac-88f52d62a668","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Genesis of Downers Grove","interior_color":"Black","cpo_package":null,"price":"45595","vin":"KMUHCESC5PU119273","trim":"3.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV80:3.5T:2023","year":"2023","vertical_position":17,"msrp":null,"bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV80:3.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60515","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurysuv_crossover","customer_id":"6063725","make":"Genesis","photo_count":42,"mileage":"32904","badges":["price_drop_in_cents","good_deal"],"exterior_color":"Adriatic Blue","listing_id":"d18da666-1b21-40ee-a0a3-f190a941504f","model":"GV80"},{"sponsored_type":"standard","dealer_name":"Affinity Auto Sales","interior_color":"Beige","cpo_package":null,"price":"18995","vin":"KMHG34JAXHU026562","trim":"3.3T Premium","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G90:3.3T Premium:2017","year":"2017","vertical_position":18,"msrp":null,"bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G90:3.3T Premium","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60185","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_plus","customer_id":"5389442","make":"Genesis","photo_count":44,"mileage":"78597","badges":["great_deal"],"exterior_color":"Caspian Black","listing_id":"d304cac2-fc6a-46ca-a1d1-224217e701bc","model":"G90"},{"sponsored_type":"standard","dealer_name":"Napleton Hyundai of Glenview","interior_color":"Obsidian Black","cpo_package":null,"price":"52984","vin":"KMUKCDSC8RU020451","trim":"Advanced","fuel_type":"Electric","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:GV60:Advanced:2024","year":"2024","vertical_position":19,"msrp":"62480","bodystyle":"SUV","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:GV60:Advanced","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60025","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"ev_luxurysuv_suv","customer_id":"345","make":"Genesis","photo_count":42,"mileage":"4110","badges":["fair_deal"],"exterior_color":"Savile Silver","listing_id":"9c23ea63-4ba5-4574-8229-ff6891dcff46","model":"GV60"},{"sponsored_type":"standard","dealer_name":"Chignoli Auto Sales","interior_color":"Gray","cpo_package":null,"price":"30500","vin":"KMTG34SC5RU143425","trim":"2.5T","fuel_type":"Gasoline","sponsored":false,"stock_sub":"","canonical_mmty":"Genesis:G70:2.5T:2024","year":"2024","vertical_position":20,"msrp":null,"bodystyle":"Sedan","stock_type":"Used","certified_preowned":false,"canonical_mmt":"Genesis:G70:2.5T","seller_type":"dealership","cpo_indicator":false,"dealer_zip":"60435","drivetrain":"All-wheel Drive","nvi_program":false,"relevancy_score":null,"cat":"luxurypassenger_standard","customer_id":"100631","make":"Genesis","photo_count":34,"mileage":"20895","badges":["great_deal"],"exterior_color":"Savile Silver","listing_id":"492c4776-16b9-4933-8dce-83816b60ffdf","model":"G70"}]}]