Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

To find matches in your area, please try adjusting your filters.

Used SUVs for sale near Davidson, NC under $899,990

Filters 3 Year Price & payment Make Mileage Body style Ext. color All filters
10,000+ matches All miles from 28036
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Onyx Black
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 15-20
Fuel type: Gasoline
Transmission: Automatic
Engine: EcoTec3 5.3L V-8 gasoline direct injection, variable valve contr
Stock #: PA222112
VIN: 1GKS2CKD3PR222112

Features

Convenience: Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Reviews

Serra Hyundai review

Amazing and attentive!

Amazing and attentive! Kaden. H made the process super easy and fast. He made sure I had everything I needed to get my new car with no worry. If you’re looking for a place to go for a new car. This is place to go and he’s the person to see!.

Vehicle information

Ext. color: White Platinum Tri-Coat
Int. color: Alpine
Drivetrain: Four-wheel Drive
MPG: 16-21.00
Fuel type: Gasoline
Transmission: 10-Speed Shiftable Automatic
Engine: EcoBoost 3.5L V-6 port/direct injection, DOHC, variable valve co
Stock #: ET758
VIN: 5LMJJ2TT7JEL14311

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Reviews

Sheehan Buick GMC review

Response to my inquiry was prompt and courteous.

Response to my inquiry was prompt and courteous. So was the follow-up as the sales agent checked with me regularly. The initial internet presentation of the car wasn't great as pictures were of "other" cars of the wrong color, etc. I didn't buy the car so I don't know what happened after a few days.

2018 Lincoln Navigator Black Label review

Good car.

This is one of my favorite cars. The only problem with the car is the quality of the dealers. As a luxury car it is great but the dealers tend to be 3rd world. I have very few problems and love the drive and technology.

Vehicle information

Ext. color: Super Black
Int. color: Charcoal
Drivetrain: Front-wheel Drive
MPG: 30-37
Fuel type: Gasoline
Transmission: CVT with Xtronic
Engine: VC-Turbo 1.5L I-3 gasoline direct injection, DOHC, CVTCS variabl
Stock #: PAE1494
VIN: 5N1BT3BA9NC683759

Features

Convenience: Adaptive Cruise Control, Keyless Entry, Keyless Start, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Shottenkirk Chrysler Dodge Jeep Ram Prosper review

Great Experience!

Great Experience! Everyone was very nice and helpful from the beginning. The process was smooth, easy and most of all I got what I wanted! Let the team know I am a very satisfied customer!

2022 Nissan Rogue SV review

Comfortable car

This is my favorite car. I wanted to buy this car from a long time ago. I am a big fan of the following. I feel very comfortable driving this car. I feel very safe. I love it. I would prefer people to buy this ca….

Vehicle information

Ext. color: Pure White
Int. color: Shetland Beige
Drivetrain: All-wheel Drive
MPG: 17-23
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.6L V-6 gasoline direct injection, DOHC, variable valve control
Stock #: S038152A
VIN: 1V2MR2CA6KC546776

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Reviews

Daytona Toyota review

I had previously dealt with Daytona Toyota in 2021 and

I had previously dealt with Daytona Toyota in 2021 and already had nothing but praise from my experience then. This latest experience, however, has truly raised the bar. Tom and Russ were more than accommodating and worked not one but two miracles for me in a time of need. Thank you so much Daytona Toyota for working with me and truly making this a memorable buying experience. Despite being more than two hours away, I will be doing all of my future Toyota purchasing at this dealership!

2019 Volkswagen Atlas 3.6L SEL review

I love this SUV!

This is my 2nd VW. My 1st was a 02 passat I bought in 2013. It was the most reliable car I ever owned. It has 230000 miles and still runs great! This Atlas takes things to a whole different level. The look, performance and features are world-class! The only knock I would have is the mpg is average at best. Only 20mpg on average. But overall it is a great vehicle for the price. The SEL trim is fully loaded. Whatever feature you could imagine, it has it. I hope to enjoy this vehicle for years to come.

Vehicle information

Ext. color: Deep Crystal Blue Mica
Int. color: Parchment
Drivetrain: Front-wheel Drive
MPG: 25-31
Fuel type: Gasoline
Transmission: Automatic
Engine: SKYACTIV-G 2.5L I-4 gasoline direct injection, DOHC, VVT variabl
Stock #: L0777617
VIN: JM3KFADM3L0777617

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

AutoNation Subaru Arapahoe review

Straight forward and generous offer.

Straight forward and generous offer. Linked to Consumer Reports. All personnel were polite and courteous. The transaction was low key. Minimal upselling and easily deflected. We?ve recommended the dealership to friends who are shopping cars

2020 Mazda CX-5 Grand Touring review

I love it!

I love it! Bought it new in 2020. Grand Touring Reserve with the turbo in Soul Crystal red metallic. I'm currently at 56k miles with zero issues. I do oil changes every 5k miles. Originally I test drove a CRV, RAV4, Forrester, and CX5. I picked the Mazda bc it looks, feels, and drives like a luxury SUV. 320 |b/ft of torque for a compact really gives it the edge over anything else in the class. Four years later and it still feels as solid as the day I bought it. The handling's amazing, and the ride is great! Some people have called the ride firm but I would say it's super compliant. It settles very quickly over bumps without feeling upset. The Bose system sounds "good" but only has bass and treble adjustments with no mid which would make it even better. The ventilated seats work better than in other cars I tested as well. It's also one of the quietest too letting in very little wind and tire noise.

Vehicle information

Ext. color: Magnetic Black
Int. color: Almond
Drivetrain: Front-wheel Drive
MPG: 26-33
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L I4 16V MPFI DOHC
Stock #: GC920685
VIN: 5N1AT2MTXGC920685

Features

Convenience: Keyless Entry
Entertainment: Bluetooth®, CD Player, Satellite Radio, USB Port
Safety: Backup Camera, Brake Assist, Stability Control

Reviews

Walt Sweeney Ford review

My experience was awesome.

My experience was awesome. From the first call and through the delv of my new 2025 Ford Expedition Max Platinum. John Sweeney and Janet were first class ! 5 Star job !

2016 Nissan Rogue S review

I bought my 2016 Rogue SL in 2019 with 32,000 miles on

I bought my 2016 Rogue SL in 2019 with 32,000 miles on it. It is now 2025 and it has 223,000 miles on it, and I still drive her daily with no issues. I have had to replace the car battery once and the fob battery twice. I also had to replace the front wheel bearings about 2 years ago. That is it! No check engine lights no engine or transmission issues, no sun roof leaks. Everything she started with still functions as well as the day i got her. This has been the best, most reliable incredible car i could have every asked for. I can not speak highly enough of the Rogue and am currently looking at getting another one and saving what is left of this one for my daughter.

Vehicle information

Ext. color: Glacier White
Int. color: Charcoal
Drivetrain: Front-wheel Drive
MPG: 30-37
Fuel type: Gasoline
Transmission: CVT with Xtronic
Engine: VC-Turbo 1.5L I-3 gasoline direct injection, DOHC, CVTCS variabl
Stock #: P17429
VIN: 5N1BT3AA7PC769155

Features

Convenience: Keyless Entry, Keyless Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control

Reviews

Mark Jacobson Toyota review

Everyone at Mark Jacobson Toyota was wonderful to work

Everyone at Mark Jacobson Toyota was wonderful to work with! From Ahmad, to Shay, to the owner, we appreciated everyone’s efforts in getting my sister into a new vehicle! Thanks so much for all your hard work and efforts in seeing this deal go through!

2023 Nissan Rogue S review

So far I have been pleased with the performance of my

So far I have been pleased with the performance of my Rogue. It just turned 20,000 miles. I'm reading some of the negative reviews and wondering if they take proper care of their vehicles. Time will tell if the 3 cylinder turbo is a winner.

Vehicle information

Ext. color: Ebony Black
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 18-24
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.8L V6 24V GDI DOHC
Stock #: PK5675
VIN: 5XYP3DGC1RG419673

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats, Third Row Seating

Reviews

Kia of Attleboro review

I cannot say enough about the excellent service I

I cannot say enough about the excellent service I received at this dealership. They were friendly, honest, and helpful. Corey, the service advisor, helped me with an unexpected repair quickly and efficiently.

2024 Kia Telluride EX review

Have driven just over 20,000 miles so far.

Have driven just over 20,000 miles so far. No issues. Drive between Clearwater and Gainesville regularly plus a couple other family trips and daily around town. Averages about 27 mpg at 75, quiet and pleasant ride. Trips were nice with good visibility front and back and plenty of room for stuff. Highly recommend.

Vehicle information

Ext. color: Pure White
Int. color: Shetland Beige
Drivetrain: Front-wheel Drive
MPG: 20-26
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: JLR7818
VIN: 1V2DR2CA5SC517818

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Third Row Seating

Reviews

2025 Volkswagen Atlas 2.0T SE review

The salesman was very professional and great customer

The salesman was very professional and great customer service. Very knowledgeable and not overbearing at all. Answered all the questions that we had . Very satisfied.

Vehicle information

Ext. color: Brilliant Black Crystal Pearlcoat
Int. color: Black
Drivetrain: Four-wheel Drive
MPG: 18-25
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.6L V6 24V MPFI DOHC
Stock #: MNIS160014
VIN: 1C4RJFCG9GC324105

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Bluetooth®, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Larry H. Miller Nissan Mesa review

I recently purchased a 2025 Nissan Rogue, and the

I recently purchased a 2025 Nissan Rogue, and the experience was very professional. The sales representive "Daniel" was very knowledgeable, polite and assisted throughout the entire process!

2016 Jeep Grand Cherokee High Altitude review

My dream car since a teenager was a grand Cherokee and

My dream car since a teenager was a grand Cherokee and when I finally got one in 2021, I’ve loved it the same ever since. They are bold in appearance and look like a strong vehicle. It has always run beautifully and I have had no issues thus far since 2021 and now it’s 2024. Very comfortable interior and attractive to the eye. Love love love my car.

Vehicle information

Ext. color: Ebony Twilight Metallic
Int. color: Light Neutral
Drivetrain: Front-wheel Drive
MPG: 22-29
Fuel type: Gasoline
Transmission: 6-Speed Automatic
Engine: 2.5L I4 16V GDI DOHC
Stock #: 64748
VIN: LRBFXBSA2KD025256

Features

Convenience: Heated Seats, Keyless Entry, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio
Exterior: Alloy Wheels
Safety: Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Dan Cummins Chevrolet Buick of Paris review

Awesome experience.

Awesome experience. Coming from out of state they made it quick and easy. Would definitely recommend.

2019 Buick Envision Preferred review

2019 Buick Envision has vibration an shaking issue

I’ve had my 2019 Buick Envision since January of this year (2023). We were traveling from GA to MS today and for the first time ever after hitting a bump two different times (a couple hours apart) our vehicle started vibrating and shaking terribly. Very concerning.

Vehicle information

Ext. color: Mythos Black Metallic
Int. color: Rock Gray
Drivetrain: All-wheel Drive
MPG: 22-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: P2010390
VIN: WA1EAAFY1P2010390

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Ira Lexus review

Huge dealer with lots of inventory and a commanding

Huge dealer with lots of inventory and a commanding ability to acquire desirable vehicles. Exceedingly professional. My salesman was Alex Baker who made my experience into a pleasure. Informative, helpful, kept in contact after I selected a vehicle that was in transit. Fair, no nonsense negotiations and final pricing. Gabe in fain e was first rate also and carefully went through all the options with me.

2023 Audi Q5 45 S line Premium Plus review

An amazing car.

This is the quietest interior at 70 MPH that I have ever known. It is also very powerful and a joy to drive It handles like a sports car staying flat in turns at high speed and going exactly where you point it like it's glued to the road with no tire sequel . It's an amazing car and after owning more that 65 cars over the years this is by far the best.

Vehicle information

Ext. color: White Pearl
Int. color: Black w/Black Cascade Trim
Drivetrain: Front-wheel Drive
MPG: 22-29
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.4L I4 PDI Turbocharged DOHC 16V LEV3-SULEV30 275hp
Stock #: R115251A
VIN: 2T2BAMBA4RC031575

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, USB Port
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

Bomnin Chevrolet Dadeland review

We just got a brand new Silverado and it was great

We just got a brand new Silverado and it was great working with the whole Bomnin team, specially Fabio

2024 Lexus RX 350 Base review

Just picked up 2024 RX350 Premium+.

Just picked up 2024 RX350 Premium+. Overall a nice car. I’m not a big fan of the 4 cyl. Powertrain however. Rather noisy and fuel economy is about the same as the 6 cyl. In my old 2019 RX with premium fuel required. Not a great trade off. New technology is pretty good and touch screen is much. Etter than the old RX touch pad. I think this is a better value than BMW X5 or Genesis GV80 with much better resale value.

Vehicle information

Ext. color: Fuji White
Int. color: Ebony W/ Ebony/Ebony Interior
Drivetrain: All-wheel Drive
MPG: 22-27
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.0L I4 16V GDI DOHC Turbo
Stock #: S0118
VIN: SADCT2EX3SA749429

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Land Rover Bellevue review

It was an amazing buying process at Land Rover Bellevue.

It was an amazing buying process at Land Rover Bellevue. Kenny, our salesperson, assisted my wife and me in purchasing our first pre-owned Rover Sport.

Vehicle information

Ext. color: Onyx Black
Int. color: Jet Black
Drivetrain: Four-wheel Drive
MPG: 16-22
Fuel type: Gasoline
Transmission: 6-Speed Automatic
Engine: 5.3L V8 16V GDI OHV
Stock #: HR331293A
VIN: 1GKS2AKC1HR331293

Features

Convenience: Keyless Entry, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, CD Player, Premium Sound System, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Tow Hitch
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Third Row Seating

Reviews

Suburban Ford of Sterling Heights review

Madison was very helpful and very consistent in her

Madison was very helpful and very consistent in her efforts and checking on my current interest. She is a very good sales person.

2017 GMC Yukon SLE review

Reliable and comfortable.

I bought this 2017 Tahoe w LT trim new. Have 60K on it now and have had no issues with it. We are not towing with it or doing high speed racing so we find the 5.3L Motor is smooth and quiet (and have not had any lifter issues which others have reported). Transmission and suspension also smooth. We keep Michelins on all our vehicles and have found this Tahoe very quiet and comfortable for road trips with 4-6 people and luggage. The LT trim pkg deleted some comfort items I wish I had (like heated steering wheel) but it still is pretty much leather-and-loaded so it was a good value at the time. I have had Suburbans for 35yrs before purchasing this Tahoe and I will probably go back to a Suburban for the extra cargo space when I trade this Tahoe in. But this has been a nice and reliable vehicle for us. No complaints.

Vehicle information

Ext. color: Phantom Black
Int. color: Black
Drivetrain: Front-wheel Drive
MPG: 20-29
Fuel type: Gasoline
Transmission: Automatic
Engine: Smartstream 2.5L I-4 port/direct injection, DOHC, CVVT variable
Stock #: SH076595
VIN: 5NMP14GL9SH076595

Features

Convenience: Adaptive Cruise Control, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Third Row Seating

Reviews

AutoNation Chevrolet Gulf Freeway review

The service advisor that helped me was very honest about

The service advisor that helped me was very honest about what my truck needed. I received great service while waiting at the dealership, and was updated frequently.

2025 Hyundai SANTA FE SE review

Been driving my new Santa Fe XRT for 40 days now.

Been driving my new Santa Fe XRT for 40 days now. The vehicle is great and has been useful for me. The financing process with Hyundai Motor Finance has been positive too. No complaints. Love my new family SUV. My dog loves it too.

Vehicle information

Ext. color: Alpine White
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 21-27
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.0L I6 24V GDI DOHC Turbo
Stock #: SFB91576A
VIN: 5UXTY9C06M9E55055

Features

Convenience: Heated Seats, Keyless Entry, Navigation System, Power Liftgate
Entertainment: Apple CarPlay®, Bluetooth®, Premium Sound System, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Brake Assist, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Five Star Ford Dallas review

Better sales experience this time - no issues

In the interest of fairness, I wanted to follow up on the negative review I left on Dec 20, 2022. The dealership, specifically Shaun A reached out to me and apologized for the miscommunication and inconvenience they put us through. And after some discussion, he agreed to lower the price of the the Edge that we were interested in by $500. It was an overall good deal and my wife and I accepted the offer and completed the sale that same day. No issues with the sales process and the paperwork was handled professionally and efficiently.

2021 BMW X3 M40i review

The Perfect Ride

I love this car I bought it for my wife for her Birthday and she just loves it. The ride is great and all the extras it has it perfect

Vehicle information

Ext. color: Jet Black Mica
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 22-27
Fuel type: Gasoline
Transmission: 6-Speed Automatic
Engine: SKYACTIV-G 2.5L I-4 gasoline direct injection, DOHC, VVT variabl
Stock #: M1721A
VIN: JM3KFBAY7N0648344

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Ray Skillman Northeast Mazda review

Jadyn and Mikayla did a fantastic job and had great

Jadyn and Mikayla did a fantastic job and had great customer service!!! Will recommend to anyone

2022 Mazda CX-5 2.5 Turbo review

Love our Mazdas!

We have owned our 2022 CX-5 Turbo for 10 moths and it is a great vehicle. Our previous SUV was an Acura RDX Advance. It too was great but this Mazda is of a higher quality and $10-$15,000 less when purchased new. Every once in a while the doors don’t lock when I walk away (I have it set up to do so) and that is the only issue I have had in 10 months and 10,000 miles. I highly recommend any Mazda product. We also own a ‘21 Miata RF, have owned several Miatas along with a Mazda6 Signature and a CX-9 Grand Touring. All have been great vehicles.

Vehicle information

Ext. color: Glacier White Metallic
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 22-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, variable valve control,
Stock #: P2021429
VIN: WA1EAAFY2P2021429

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Audi Raleigh review

My to experience there was a very good experience

My to experience there was a very good experience everyone was very polite kind pleasant and business like

2023 Audi Q5 45 S line Premium Plus review

Decade AUDI customer

Been a Audi customer 3 decades. The Q5 is my 2nd SUV purchase & is above & beyond comfortable,quiet & spacious . Audi Brooklyn NYC always goes the extra mile to please the customer.

Vehicle information

Ext. color: White
Int. color: Charcoal
Drivetrain: All-wheel Drive
MPG: 25-32
Fuel type: Gasoline
Transmission: Automatic CVT
Engine: 2.5L I4 16V GDI DOHC
Stock #: L4284A
VIN: 5N1AT3BBXMC758018

Features

Convenience: Adaptive Cruise Control, Keyless Entry, Keyless Start, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Backup Camera, Brake Assist, Lane Departure Warning, Stability Control

Reviews

Mercedes-Benz of Littleton review

James is a top-notch sales rep.

James is a top-notch sales rep. Contacted me quickly and processed my questions and requests efficiently. Will look to work with him in the future! A+

2021 Nissan Rogue SV review

This 2021 Nissan Rogue SL is a great car.

This 2021 Nissan Rogue SL is a great car. It is very comfortable and loaded with features. I am very pleased with fuel efficiency. There has been no problems to report since I bought this car.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

10,000+ matches Clear
Reset
Basics
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only

Find great prices by city

Find great prices on used SUVs in Davidson, NC

[{"applied_filter_criteria":"{\"bodystyle\":[\"suv\"],\"cpo_indicator\":false,\"max_price_range\":899990,\"min_price_range\":0,\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"used\"}","search_type":"general-inventory-search","sponsored_type_eligible":["premier","inventory_ad"],"vehicle_array":[{"certified_preowned":false,"vertical_position":1,"nvi_program":false,"customer_id":"5390798","relevancy_score":null,"bodystyle":"SUV","trim":"4WD AT4","canonical_mmt":"GMC:Yukon:4WD AT4","dealer_name":"Serra Hyundai","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Four-wheel Drive","interior_color":"Jet Black","sponsored_type":"standard","badges":["great_deal"],"canonical_mmty":"GMC:Yukon:4WD AT4:2023","seller_type":"dealership","cpo_package":null,"dealer_zip":"35235","listing_id":"c1474610-7af1-4aad-a721-4a36cba007ec","year":"2023","stock_type":"Used","make":"GMC","cat":"suv_fullsize","vin":"1GKS2CKD3PR222112","msrp":"0","mileage":"42862","price":"58195","photo_count":26,"model":"Yukon","fuel_type":"Gasoline","exterior_color":"Onyx Black"},{"certified_preowned":false,"vertical_position":2,"nvi_program":false,"customer_id":"812","relevancy_score":null,"bodystyle":"SUV","trim":"Black Label","canonical_mmt":"Lincoln:Navigator:Black Label","dealer_name":"Sheehan Buick GMC","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Four-wheel Drive","interior_color":"Alpine","sponsored_type":"standard","badges":["fair_deal"],"canonical_mmty":"Lincoln:Navigator:Black Label:2018","seller_type":"dealership","cpo_package":null,"dealer_zip":"33064","listing_id":"57685b04-b54d-4122-8f71-2a9e3af7172c","year":"2018","stock_type":"Used","make":"Lincoln","cat":"luxurysuv_suv","vin":"5LMJJ2TT7JEL14311","msrp":"0","mileage":"35912","price":"47364","photo_count":32,"model":"Navigator","fuel_type":"Gasoline","exterior_color":"White Platinum Tri-Coat"},{"certified_preowned":false,"vertical_position":3,"nvi_program":false,"customer_id":"5397619","relevancy_score":null,"bodystyle":"SUV","trim":"SV","canonical_mmt":"Nissan:Rogue:SV","dealer_name":"Shottenkirk Chrysler Dodge Jeep Ram Prosper","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Charcoal","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Nissan:Rogue:SV:2022","seller_type":"dealership","cpo_package":null,"dealer_zip":"75078","listing_id":"56f64f0e-1d3d-4ee1-8f67-e00ae1fef678","year":"2022","stock_type":"Used","make":"Nissan","cat":"crossover_compact","vin":"5N1BT3BA9NC683759","msrp":"0","mileage":"50215","price":"20560","photo_count":30,"model":"Rogue","fuel_type":"Gasoline","exterior_color":"Super Black"},{"certified_preowned":false,"vertical_position":4,"nvi_program":false,"customer_id":"11200","relevancy_score":null,"bodystyle":"SUV","trim":"3.6L SEL","canonical_mmt":"Volkswagen:Atlas:3.6L SEL","dealer_name":"Daytona Toyota","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Shetland Beige","sponsored_type":"standard","badges":["great_deal"],"canonical_mmty":"Volkswagen:Atlas:3.6L SEL:2019","seller_type":"dealership","cpo_package":null,"dealer_zip":"32114","listing_id":"47f25651-f49d-49ac-9643-43982c4b8d3d","year":"2019","stock_type":"Used","make":"Volkswagen","cat":"crossover_midsize","vin":"1V2MR2CA6KC546776","msrp":"0","mileage":"80918","price":"18700","photo_count":10,"model":"Atlas","fuel_type":"Gasoline","exterior_color":"Pure White"},{"certified_preowned":false,"vertical_position":5,"nvi_program":false,"customer_id":"111537","relevancy_score":null,"bodystyle":"SUV","trim":"Grand Touring","canonical_mmt":"Mazda:CX-5:Grand Touring","dealer_name":"AutoNation Subaru Arapahoe","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Parchment","sponsored_type":"standard","badges":["price_drop_in_cents","good_deal"],"canonical_mmty":"Mazda:CX-5:Grand Touring:2020","seller_type":"dealership","cpo_package":null,"dealer_zip":"80112","listing_id":"209778be-e977-4cce-a4bb-71f6ff62d095","year":"2020","stock_type":"Used","make":"Mazda","cat":"crossover_compact","vin":"JM3KFADM3L0777617","msrp":"0","mileage":"45647","price":"21398","photo_count":26,"model":"CX-5","fuel_type":"Gasoline","exterior_color":"Deep Crystal Blue Mica"},{"certified_preowned":false,"vertical_position":6,"nvi_program":false,"customer_id":"14558","relevancy_score":null,"bodystyle":"SUV","trim":"S","canonical_mmt":"Nissan:Rogue:S","dealer_name":"Walt Sweeney Ford","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Almond","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Nissan:Rogue:S:2016","seller_type":"dealership","cpo_package":null,"dealer_zip":"45238","listing_id":"8ecee650-978d-4601-88e0-5193623d2f9f","year":"2016","stock_type":"Used","make":"Nissan","cat":"crossover_compact","vin":"5N1AT2MTXGC920685","msrp":null,"mileage":"40122","price":"14928","photo_count":11,"model":"Rogue","fuel_type":"Gasoline","exterior_color":"Magnetic Black"},{"certified_preowned":false,"vertical_position":7,"nvi_program":false,"customer_id":"81498","relevancy_score":null,"bodystyle":"SUV","trim":"S","canonical_mmt":"Nissan:Rogue:S","dealer_name":"Mark Jacobson Toyota","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Charcoal","sponsored_type":"standard","badges":["price_drop_in_cents","great_deal"],"canonical_mmty":"Nissan:Rogue:S:2023","seller_type":"dealership","cpo_package":null,"dealer_zip":"27707","listing_id":"37df2686-ac6d-4b48-b631-7f8fd2826b07","year":"2023","stock_type":"Used","make":"Nissan","cat":"crossover_compact","vin":"5N1BT3AA7PC769155","msrp":"0","mileage":"30029","price":"20579","photo_count":38,"model":"Rogue","fuel_type":"Gasoline","exterior_color":"Glacier White"},{"certified_preowned":false,"vertical_position":8,"nvi_program":false,"customer_id":"5388900","relevancy_score":null,"bodystyle":"SUV","trim":"EX","canonical_mmt":"Kia:Telluride:EX","dealer_name":"Kia of Attleboro","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["great_deal","american_made_index_ranking","2024_award_winner"],"canonical_mmty":"Kia:Telluride:EX:2024","seller_type":"dealership","cpo_package":null,"dealer_zip":"02703","listing_id":"2ac8d4bf-4903-46b1-9516-e8c84dc9e42a","year":"2024","stock_type":"Used","make":"Kia","cat":"suv_midsize","vin":"5XYP3DGC1RG419673","msrp":null,"mileage":"30131","price":"37812","photo_count":32,"model":"Telluride","fuel_type":"Gasoline","exterior_color":"Ebony Black"},{"certified_preowned":false,"vertical_position":9,"nvi_program":false,"customer_id":"6066167","relevancy_score":null,"bodystyle":"SUV","trim":"2.0T SE","canonical_mmt":"Volkswagen:Atlas:2.0T SE","dealer_name":"Shottenkirk Toyota San Antonio","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Shetland Beige","sponsored_type":"standard","badges":["great_deal","american_made_index_ranking"],"canonical_mmty":"Volkswagen:Atlas:2.0T SE:2025","seller_type":"dealership","cpo_package":null,"dealer_zip":"78232","listing_id":"585a8377-e409-459f-b032-beccb35f64ba","year":"2025","stock_type":"Used","make":"Volkswagen","cat":"crossover_midsize","vin":"1V2DR2CA5SC517818","msrp":"0","mileage":"7253","price":"32551","photo_count":35,"model":"Atlas","fuel_type":"Gasoline","exterior_color":"Pure White"},{"certified_preowned":false,"vertical_position":10,"nvi_program":false,"customer_id":"80276","relevancy_score":null,"bodystyle":"SUV","trim":"High Altitude","canonical_mmt":"Jeep:Grand Cherokee:High Altitude","dealer_name":"Larry H. Miller Nissan Mesa","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Four-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Jeep:Grand Cherokee:High Altitude:2016","seller_type":"dealership","cpo_package":null,"dealer_zip":"85201","listing_id":"5e38061c-8f08-4ea4-8745-3e898f3c58db","year":"2016","stock_type":"Used","make":"Jeep","cat":"suv_midsize","vin":"1C4RJFCG9GC324105","msrp":null,"mileage":"154019","price":"11988","photo_count":30,"model":"Grand Cherokee","fuel_type":"Gasoline","exterior_color":"Brilliant Black Crystal Pearlcoat"},{"certified_preowned":false,"vertical_position":11,"nvi_program":false,"customer_id":"83072","relevancy_score":null,"bodystyle":"SUV","trim":"Preferred","canonical_mmt":"Buick:Envision:Preferred","dealer_name":"Dan Cummins Chevrolet Buick of Paris","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Light Neutral","sponsored_type":"standard","badges":["price_drop_in_cents","fair_deal"],"canonical_mmty":"Buick:Envision:Preferred:2019","seller_type":"dealership","cpo_package":null,"dealer_zip":"40361","listing_id":"7c2d97bc-c1ec-4f38-972d-420e847f2f67","year":"2019","stock_type":"Used","make":"Buick","cat":"luxurysuv_crossover","vin":"LRBFXBSA2KD025256","msrp":null,"mileage":"52383","price":"18587","photo_count":27,"model":"Envision","fuel_type":"Gasoline","exterior_color":"Ebony Twilight Metallic"},{"certified_preowned":false,"vertical_position":12,"nvi_program":false,"customer_id":"88958","relevancy_score":null,"bodystyle":"SUV","trim":"45 S line Premium Plus","canonical_mmt":"Audi:Q5:45 S line Premium Plus","dealer_name":"Ira Lexus","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Rock Gray","sponsored_type":"standard","badges":["great_deal"],"canonical_mmty":"Audi:Q5:45 S line Premium Plus:2023","seller_type":"dealership","cpo_package":null,"dealer_zip":"01923","listing_id":"a322d56b-b857-4bd1-b969-971a74b48743","year":"2023","stock_type":"Used","make":"Audi","cat":"luxurysuv_crossover","vin":"WA1EAAFY1P2010390","msrp":"0","mileage":"27009","price":"33988","photo_count":35,"model":"Q5","fuel_type":"Gasoline","exterior_color":"Mythos Black Metallic"},{"certified_preowned":false,"vertical_position":13,"nvi_program":false,"customer_id":"88394","relevancy_score":null,"bodystyle":"SUV","trim":"Base","canonical_mmt":"Lexus:RX 350:Base","dealer_name":"Bomnin Chevrolet Dadeland","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Black w/Black Cascade Trim","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Lexus:RX 350:Base:2024","seller_type":"dealership","cpo_package":null,"dealer_zip":"33143","listing_id":"5d50892e-aa82-4295-a36f-509fbb00bb69","year":"2024","stock_type":"Used","make":"Lexus","cat":"luxurysuv_crossover","vin":"2T2BAMBA4RC031575","msrp":"0","mileage":"10718","price":"43990","photo_count":18,"model":"RX 350","fuel_type":"Gasoline","exterior_color":"White Pearl"},{"certified_preowned":false,"vertical_position":14,"nvi_program":false,"customer_id":"6065685","relevancy_score":null,"bodystyle":"SUV","trim":"P250 R-Dynamic S","canonical_mmt":"Jaguar:F-PACE:P250 R-Dynamic S","dealer_name":"Land Rover Bellevue","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Ebony W/ Ebony/Ebony Interior","sponsored_type":"standard","badges":["price_drop_in_cents","great_deal","hot_car"],"canonical_mmty":"Jaguar:F-PACE:P250 R-Dynamic S:2025","seller_type":"dealership","cpo_package":null,"dealer_zip":"98005","listing_id":"80789146-a9c2-4813-9b08-651a142ac6bb","year":"2025","stock_type":"Used","make":"Jaguar","cat":"luxurysuv_crossover","vin":"SADCT2EX3SA749429","msrp":null,"mileage":"10127","price":"49998","photo_count":30,"model":"F-PACE","fuel_type":"Gasoline","exterior_color":"Fuji White"},{"certified_preowned":false,"vertical_position":15,"nvi_program":false,"customer_id":"5397770","relevancy_score":null,"bodystyle":"SUV","trim":"SLE","canonical_mmt":"GMC:Yukon:SLE","dealer_name":"Suburban Ford of Sterling Heights","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Four-wheel Drive","interior_color":"Jet Black","sponsored_type":"standard","badges":["great_deal"],"canonical_mmty":"GMC:Yukon:SLE:2017","seller_type":"dealership","cpo_package":null,"dealer_zip":"48313","listing_id":"9c96fb5e-7acb-4a66-a153-0cff299e18f6","year":"2017","stock_type":"Used","make":"GMC","cat":"suv_fullsize","vin":"1GKS2AKC1HR331293","msrp":"21500","mileage":"102092","price":"21500","photo_count":21,"model":"Yukon","fuel_type":"Gasoline","exterior_color":"Onyx Black"},{"certified_preowned":false,"vertical_position":16,"nvi_program":false,"customer_id":"106537","relevancy_score":null,"bodystyle":"SUV","trim":"SE","canonical_mmt":"Hyundai:SANTA FE:SE","dealer_name":"AutoNation Chevrolet Gulf Freeway","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"Front-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["good_deal","american_made_index_ranking","2025_award_winner"],"canonical_mmty":"Hyundai:SANTA FE:SE:2025","seller_type":"dealership","cpo_package":null,"dealer_zip":"77034","listing_id":"7d625718-c30b-4337-979c-b6830537983a","year":"2025","stock_type":"Used","make":"Hyundai","cat":"crossover_midsize","vin":"5NMP14GL9SH076595","msrp":"0","mileage":"23080","price":"28491","photo_count":25,"model":"SANTA FE","fuel_type":"Gasoline","exterior_color":"Phantom Black"},{"certified_preowned":true,"vertical_position":17,"nvi_program":false,"customer_id":"5392249","relevancy_score":null,"bodystyle":"SUV","trim":"M40i","canonical_mmt":"BMW:X3:M40i","dealer_name":"Five Star Ford Dallas","sponsored":true,"stock_sub":"","cpo_indicator":true,"drivetrain":"All-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["price_drop_in_cents","good_deal","cpo"],"canonical_mmty":"BMW:X3:M40i:2021","seller_type":"dealership","cpo_package":"Ford Blue Advantage Blue","dealer_zip":"75252","listing_id":"57fab1e0-cb64-4e7d-92fe-90001a0516f3","year":"2021","stock_type":"Used","make":"BMW","cat":"luxurysuv_crossover","vin":"5UXTY9C06M9E55055","msrp":null,"mileage":"80503","price":"29000","photo_count":22,"model":"X3","fuel_type":"Gasoline","exterior_color":"Alpine White"},{"certified_preowned":false,"vertical_position":18,"nvi_program":false,"customer_id":"153063","relevancy_score":null,"bodystyle":"SUV","trim":"2.5 Turbo","canonical_mmt":"Mazda:CX-5:2.5 Turbo","dealer_name":"Ray Skillman Northeast Mazda","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Mazda:CX-5:2.5 Turbo:2022","seller_type":"dealership","cpo_package":null,"dealer_zip":"46219","listing_id":"a95343b9-2191-4b31-b74c-394e2835ebbf","year":"2022","stock_type":"Used","make":"Mazda","cat":"crossover_compact","vin":"JM3KFBAY7N0648344","msrp":"0","mileage":"31000","price":"29980","photo_count":42,"model":"CX-5","fuel_type":"Gasoline","exterior_color":"Jet Black Mica"},{"certified_preowned":false,"vertical_position":19,"nvi_program":false,"customer_id":"200146","relevancy_score":null,"bodystyle":"SUV","trim":"45 S line Premium Plus","canonical_mmt":"Audi:Q5:45 S line Premium Plus","dealer_name":"Audi Raleigh","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Black","sponsored_type":"standard","badges":["good_deal"],"canonical_mmty":"Audi:Q5:45 S line Premium Plus:2023","seller_type":"dealership","cpo_package":null,"dealer_zip":"27616","listing_id":"1d2bba61-f8de-4c60-895a-8e4e2690e330","year":"2023","stock_type":"Used","make":"Audi","cat":"luxurysuv_crossover","vin":"WA1EAAFY2P2021429","msrp":"0","mileage":"37364","price":"30488","photo_count":16,"model":"Q5","fuel_type":"Gasoline","exterior_color":"Glacier White Metallic"},{"certified_preowned":false,"vertical_position":20,"nvi_program":false,"customer_id":"23027","relevancy_score":null,"bodystyle":"SUV","trim":"SV","canonical_mmt":"Nissan:Rogue:SV","dealer_name":"Mercedes-Benz of Littleton","sponsored":false,"stock_sub":"","cpo_indicator":false,"drivetrain":"All-wheel Drive","interior_color":"Charcoal","sponsored_type":"standard","badges":["price_drop_in_cents","good_deal"],"canonical_mmty":"Nissan:Rogue:SV:2021","seller_type":"dealership","cpo_package":null,"dealer_zip":"80122","listing_id":"59e40d3c-b2d8-49e7-9166-33d23177609d","year":"2021","stock_type":"Used","make":"Nissan","cat":"crossover_compact","vin":"5N1AT3BBXMC758018","msrp":null,"mileage":"29606","price":"21576","photo_count":30,"model":"Rogue","fuel_type":"Gasoline","exterior_color":"White"}]}]