Skip to main content
Ad

Car shopper resources

Basics

Exterior color
Black Metallic
Interior color
Black
Drivetrain
Four-wheel Drive
MPG
18–24

Based on EPA mileage ratings. Use for comparison purposes only. Actual mileage will vary depending on driving conditions, driving habits, vehicle maintenance, and other factors.

Fuel type
Gasoline
Transmission
10-Speed Automatic
Engine
2.7L V6 24V PDI DOHC Twin Turbo
VIN
1FTEW2LP9SFC10900
Stock #
B250594
Mileage
11 mi.

Features

Convenience
  • Keyless Entry
Entertainment
  • Apple CarPlay®
  • Bluetooth®
  • Satellite Radio
  • USB Port
  • WiFi Hotspot
Exterior
  • Alloy Wheels
  • Tow Hitch
  • Tow Hooks
Safety
  • Backup Camera
  • Blind Spot Monitor
  • Brake Assist
  • LED Headlights
  • Lane Departure Warning
  • Stability Control
View all features

Features

These features are associated with this vehicle type. Contact the seller to confirm this specific vehicle has them.

  • 1st and 2nd row curtain head airbags
  • 4 Door
  • 4-Wheel Disc Brakes
  • 4-wheel ABS Brakes
  • 6 USB ports
  • A/C
  • ABS
  • ABS and Driveline Traction Control
  • AM/FM Stereo
  • Adjustable Steering Wheel
  • Aluminum Wheels
  • Anti-theft alarm system
  • Audio controls on steering wheel
  • Automatic Headlights
  • Automatic Highbeams
  • Automatic locking hubs
  • Auxiliary Audio Input
  • Back-Up Camera
  • Black aluminum rims
  • Black grille
  • Blind Spot Monitor
  • Bluetooth Connection
  • Body-colored bumpers
  • Brake Assist
  • Braking Assist
  • Bucket Seats
  • Bucket front seats
  • Center Console: Full with locking storage
  • Child Safety Locks
  • Clock : Digital
  • Cloth Seats
  • Cloth seat upholstery
  • Coil front spring
  • Compass
  • Conventional Spare Tire
  • Cross-Traffic Alert
  • Cruise control
  • Cruise controls on steering wheel
  • Cupholders: Front and rear
  • Curb weight: 4,941 lbs.
  • Daytime running lights
  • Diameter of tires: 18.0"
  • Digital Audio Input
  • Door pockets: Driver, passenger and rear
  • Door reinforcement: Side-impact door beam
  • Double wishbone front suspension
  • Driver Adjustable Lumbar
  • Driver Air Bag
  • Driver Monitoring
  • Driver airbag
  • Dusk sensing headlights
  • Electric power steering
  • Engine immobilizer
  • Engine: 2.7l V6 Ecoboost -Inc: Auto Start-Stop Technology (Std)
  • Evasion Assist
  • External temperature display
  • Fixed antenna
  • Floor Mats
  • Floor mats: Carpet front and rear
  • Fold-up cushion rear seats
  • Four Wheel Drive
  • Front Collision Mitigation
  • Front Head Air Bag
  • Front Head Room: 40.8"
  • Front Hip Room: 62.5"
  • Front Independent Suspension
  • Front Leg Room: 43.9"
  • Front Shoulder Room: 66.7"
  • Front Side Air Bag
  • Front Stabilizer Bar : Bar
  • Front Ventilated disc brakes
  • Front reading lights
  • Front suspension stabilizer bar
  • Fuel Capacity: 36.0 gal.
  • Fuel Consumption: City: 18 mpg
  • Fuel Consumption: Highway: 24 mpg
  • Fuel Type: Regular unleaded
  • Gross vehicle weight: 6,650 lbs.
  • Headlights off auto delay
  • Heated Mirrors
  • Heated driver mirror
  • Heated passenger mirror
  • Immobilizer
  • Independent front suspension classification
  • Instrumentation: Low fuel level
  • Interior air filtration
  • Intermittent Wipers
  • Keyless Entry
  • LED Headlights
  • LED Low/High Beam Reflector Headlights
  • Lane Departure Warning
  • Lane Departure Warning: Active
  • Lane Keeping Assist
  • Leaf rear spring
  • Leaf rear suspension
  • Left rear passenger door type: Conventional
  • Manual child safety locks
  • Manual front air conditioning
  • Max cargo capacity: 51 cu.ft.
  • Mobile hotspot internet access
  • Mp3 Capability
  • One 12V DC power outlet
  • Overall Length: 231.7"
  • Overall Width: 79.9"
  • Overall height: 77.2"
  • Overhead console: Mini with storage
  • Pass-Through Rear Seat
  • Passenger Air Bag
  • Passenger Air Bag Sensor
  • Passenger Airbag
  • Passenger Vanity Mirror
  • Passenger vanity mirrors
  • Power Door Locks
  • Power Mirror(S)
  • Power Steering
  • Power remote driver mirror adjustment
  • Power remote passenger mirror adjustment
  • Power windows
  • Privacy Glass
  • Privacy glass: Deep
  • Radio Data System
  • Rear Bench Seat
  • Rear Collision Mitigation
  • Rear Collision Mitigation : Cross Traffic Alert with Reverse Brake Assist
  • Rear Defrost
  • Rear Head Air Bag
  • Rear Head Room: 40.4"
  • Rear Hip Room: 62.6"
  • Rear Leg Room: 43.6"
  • Rear Parking Aid
  • Rear Shoulder Room: 66.0"
  • Rear View Camera
  • Rear center seatbelt: 3-point belt
  • Rear door type: Tailgate
  • Rear reverse sensing system
  • Remote activated exterior entry lights
  • Remote power door locks
  • Requires Subscription
  • Right rear passenger door type: Conventional
  • Rigid axle rear suspension
  • SYNC 4
  • SYNC 4 911 Assist
  • Satellite Radio
  • Seatback storage: 2
  • Seatbelt pretensioners: Front
  • Security System
  • Side airbag
  • SiriusXM Satellite Radio
  • SiriusXM with 360L AM/FM/Satellite Radio
  • SiriusXM with 360L Satellite Radio
  • Smart Device Integration
  • Spare Tire Mount Location: Underbody w/crankdown
  • Speed Sensitive Audio Volume Control
  • Split rear bench
  • Stability Control
  • Stability controll with anti-roll
  • Steel spare wheel rim
  • Steering Wheel Audio Controls
  • Suspension class: Regular
  • Sync 4 Applink/Apple CarPlay/Android Auto Wireless Mirroring
  • Tachometer
  • Telematics
  • Tilt and telescopic steering wheel
  • Tire Pressure Monitor
  • Tire Pressure Monitoring System: Tire specific
  • Tires - Front All-Terrain
  • Tires - Rear All-Terrain
  • Tires: Prefix: P
  • Tires: Profile: 65
  • Tires: Speed Rating: S
  • Tires: Width: 275 mm
  • Total Number of Speakers: 6
  • Tow Hitch
  • Tow Hooks
  • Traction Control
  • Trailer hitch
  • Transmission hill holder
  • Trip computer
  • Turbocharged
  • Type of tires: AT
  • Urethane shift knob trim
  • Urethane steering wheel trim
  • Variable Speed Intermittent Wipers
  • Variable intermittent front wipers
  • Vehicle Emissions: LEV3-ULEV70
  • Video Monitor Location: Front
  • Wheel Diameter: 18
  • Wheel Width: 7.5
  • Wheelbase: 145.0"
  • Wifi Hotspot
  • Wireless Phone Connectivity : SYNC 4
2025 Award Winner

American Made Index

This pickup features on the American-Made Index, which analyzes five factors to find the most American cars.
See more details
award winner

Seller’s info

Hawk Ford of Carol Stream

(458 reviews)
175 North Avenue, Carol Stream, IL 60188

Seller’s notes about this car

You'll find all the latest and greatest that Ford has to offer here at Hawk Ford of Carol Stream, located conveniently off I-355 at 175 W North Ave! Come in and see us TODAY!Recent Arrival! 2025 Ford F-150 STX Black Metallic 10-Speed Automatic 2.7L V6 EcoBoost 4WD STX4WD.

Have a question?

Get answers, see the car, or find a good time for a test drive. Take the next step and contact the seller.

Contact seller

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your payment

Based on est. car price of $45,553 at ...% APR* and ...% sales tax.
$... per month
Car price
$45,553
Down payment
-Not Priced
Trade-in value
-Not Priced
Estimated sales tax ...%
(based on ZIP)
+
Other fees*
Not included
Total loan amount
Total interest paid
(over life of loan)
+
Total loan & interest paid
Monthly payment
Ad
Estimate trade-in
Estimate trade-in

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Ad

Similar cars at this dealership

New
2025 Ford F-150 STX
$45,553 MSRP $52,360
New
2025 Ford F-150 STX
$45,205 MSRP $51,960
New
2025 Ford F-150 STX
$45,810 MSRP $52,655
New
2025 Ford F-150 STX
$45,553 MSRP $52,360
Ad

Car shopper resources

Cars.com Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; Cars.com is not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Click here for more details.

Bluetooth® is a registered mark of Bluetooth® SIG, Inc. Android Auto™ is a trademark of Google LLC. Apple CarPlay® is a registered trademark of Apple Inc. Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, Germany.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

Call
Check availability

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Instant offer
  • Want to sell or trade-in your car fast? Get a free Instant Offer from local dealers.
  • Tell us about your car and get a free Instant Offer within minutes.
  • Schedule a car inspection with the dealer.
  • Use your Instant Offer to trade-in your car.
Get your Instant Offer