-
1.5L DOHC 12-Valve 3-Cylinder DI Turbo Engine
-
12V power outlets 1 12V power outlet
-
3-point seatbelt Rear seat center 3-point seatbelt
-
4-Wheel Disc Brakes w/4-Wheel ABS Front And Rear Vented Discs Brake Assist…
-
4WD type Intelligent All-Wheel Drive automatic full-time AWD
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
Accessory power Retained accessory power
-
Adaptive Cruise Control
-
Adaptive cruise control Intelligent Cruise Control (ICC) w/Full Speed Range …
-
Air conditioning Yes
-
All Wheel Drive
-
All-in-one key All-in-one remote fob and ignition key
-
Alternator Type Alternator
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Armrests front center Front seat center armrest
-
Armrests rear Rear seat center armrest
-
Armrests rear storage Rear seat center armrest storage
-
Audio storage Audio media storage unit
-
Auto door locks Auto-locking doors
-
Auto headlights Intelligent Auto Headlights (I-AH) auto on/off headlight con…
-
Auto high-beam headlights High Beam Assist (HBA) auto high-beam headlights
-
Automatic Emergency Braking
-
Automatic Full-Time All-Wheel
-
Automatic brake hold
-
Autonomous cruise control ProPILOT Assist hands-on cruise control
-
Backup Camera
-
Basic warranty 36 month/36,000 miles
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Blind Spot Intervention (BSI) / Blind Spot Warning (BSW) Blind Spot
-
Blind Spot Monitor
-
Blind spot Blind Spot Intervention (BSI) / Blind Spot Warning (BSW)
-
Body panels Galvanized steel/aluminum/composite body panels with side impact…
-
Body-Colored Power Heated Side Mirrors w/Manual Folding
-
Bodyside cladding Black bodyside cladding
-
Brake Assist
-
Brake assist system Predictive brake assist system
-
Brake type 4-wheel disc brakes
-
Bulb warning Bulb failure warning
-
Bumper rub strip front Black front bumper rub strip
-
Bumper rub strip rear Black rear bumper rub strip
-
Bumpers front Body-colored front bumper
-
Bumpers rear Body-colored rear bumper
-
Cabin air filter
-
Capless fuel filler
-
Cargo access Power cargo area access release
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo tie downs Cargo area tie downs
-
Charcoal Seat trim
-
Child door locks Manual rear child safety door locks
-
Climate control Automatic climate control
-
Clock Digital clock
-
Compression Variable compression
-
Compressor Intercooled turbo
-
Concealed cargo storage Cargo area concealed storage
-
Corrosion perforation warranty 60 month/unlimited
-
Cruise control Cruise control with steering wheel mounted controls
-
Cylinder head material Aluminum cylinder head
-
Day/Night rearview mirror
-
Delay off headlights Delay-off headlights
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Body-colored door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Body-colored door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirrors Power door mirrors
-
Door trim insert Leatherette door trim insert
-
Drive type All-wheel drive
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 2-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Drivetrain selectable Driver selectable drivetrain mode
-
Dual Climate Control
-
Dual-zone front climate control
-
Electronic parking brake
-
Electronic stability control Electronic stability control system
-
Emergency SOS Capable NissanConnect Services vehicle integrated emergency SO…
-
Emissions LEV3-ULEV50 emissions
-
Emissions tiers Tier 3 Bin 50 emissions
-
Engine Cylinders VC-Turbo I3
-
Engine Location Front mounted engine
-
Engine Mounting direction Transverse mounted engine
-
Engine VC-Turbo 1.5L I-3 gasoline direct injection, DOHC, CVTCS variable val…
-
Engine block material Aluminum engine block
-
Engine cooler Engine oil cooler
-
Engine/electric motor temperature gauge
-
External memory External memory control
-
First-row windows Power first-row windows
-
Fixed Rear Window w/Wiper Heated Wiper Park and Defroster
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Fob engine controls Intelligent Key with hands-free access and push button s…
-
Folding door mirrors Manual folding door mirrors
-
Folding rear seats 60-40 folding rear seats
-
Forward collision warning Automatic Emergency Braking with Intersection Assi…
-
Front anti-roll Front anti-roll bar
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front reading lights
-
Front seat upholstery Cloth front seat upholstery
-
Front seatback upholstery Cloth front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Fuel Type Regular Unleaded
-
Fuel door Power fuel door release
-
Gauge cluster display size (inches) Gauge cluster display size: 7.00
-
Gearshifter material Urethane gear shifter material
-
Glove box Standard glove box
-
Grille style Black grille with chrome accents
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Headlight type Reflector headlights
-
Headlights LED low and high beam headlights
-
Headlights on reminder
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated wiper area Heated rear wiper park
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill start assist Hill Start Assist (HSA)
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated ignition switch
-
Immobilizer
-
Instrumentation display Analog instrumentation display
-
Interior accents Chrome and metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet access NissanConnect with Wi-Fi Hotspot mobile hotspot internet acc…
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob keyless entry
-
Keyfob remote start
-
Keyless Entry
-
Keyless Start
-
Knee airbag Driver and passenger side knee airbag
-
LED brake lights
-
Lane departure Intelligent Lane Intervention (I-LI)
-
Limited Slip Center Differential
-
Limited slip differential Brake actuated limited slip differential
-
Lock-up transmission
-
Locking hub control Permanent locking hub control
-
Low level warnings Low level warning for fuel and brake fluid
-
Low tire pressure warning Tire specific low air pressure warning
-
Manual passenger seat controls Passenger seat manual reclining and fore/aft …
-
Mobile app access
-
Multiple headlights Multiple enclosed headlights
-
Number of airbags 10 airbags
-
Number of beverage holders 8 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Occupancy sensor Airbag occupancy sensor
-
Oil pressure warning
-
One-touch down window Driver one-touch down window
-
One-touch up window Driver one-touch up window
-
Over the air updates
-
Overdrive transmission
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console Mini overhead console
-
Overhead console storage
-
Paint Non-metallic paint
-
Paint Pearlcoat paint
-
Panel insert Metal-look instrument panel insert
-
Parking sensors Rear parking sensors
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 4-way directional control…
-
Pedestrian detection Automatic Emergency Braking with Pedestrian Detection (…
-
Power Driver Seat
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Powertrain type ICE
-
Powertrain warranty 60 month/60,000 miles
-
Primary display size 8 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
RDS Radio data system (RDS)
-
Radiator
-
Radio AM/FM/SiriusXMsatellite
-
Rear Cross Traffic Alert
-
Rear Spoiler
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear camera RearView Monitor rear mounted camera
-
Rear cargo door Power liftgate rear cargo door
-
Rear collision warning Rear Cross Traffic Alert (RCTA) collision mitigation
-
Rear console climate control ducts
-
Rear head restraint control 3 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear pedestrian detection Rear Automatic Braking (RAB) with Pedestrian Detec…
-
Rear seat check warning Rear Door Alert rear seat check warning
-
Rear seat direction Front facing rear seat
-
Rear seat folding position Fold forward rear seatback
-
Rear seat upholstery Cloth rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats Rear bench seat
-
Rear seats fixed or removable Fixed rear seats
-
Rear side impact airbag Rear side impact airbags
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear window trim Black rear window trim
-
Rear windshield Fixed rear windshield
-
Rear windshield wipers
-
RearView Monitor Back-Up Camera
-
Reclining rear seats Manual reclining rear seats
-
Remote panic alarm
-
Roadside warranty 36 month/36,000 miles
-
Running lights LED daytime running lights
-
SAE Autonomy Level 2 - partial automation SAE Autonomy
-
Satellite trial 3 month satellite trial subscription
-
Scarlet ember tintcoat
-
Seatback storage pockets 1 seatback storage pocket
-
Seatbelt pretensioners Front and rear seatbelt pretensioners
-
Seatbelt pretensioners number 4 seatbelt pre-tensioners
-
Seating capacity 5
-
Second-row windows Power second-row windows
-
Seek scan
-
Selectable Terrain Modes
-
Selectable mode transmission
-
Sequential shift control Sequential shift with steering wheel controls
-
Service interval warning Service interval indicator
-
Shock absorbers Gas-pressurized shock absorbers
-
Smart device integration NissanConnect featuring Apple CarPlay and Android A…
-
Spare tire Compact spare tire with steel wheel
-
Spare tire location Spare tire mounted under the cargo floor
-
Speakers Standard grade speakers
-
Speakers number 6 speakers
-
Special paint Monotone paint
-
Speed sensitive volume
-
Speed sensitive wipers
-
Speedometer Redundant digital speedometer
-
Split front seats Bucket front seats
-
Spoiler Rear lip spoiler
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering wheel material Urethane steering wheel
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailgate control Tailgate/power door lock
-
Tailpipe Stainless steel single exhaust
-
Temperature display Exterior temperature display
-
Third-row windows Fixed third-row windows
-
Tinted windows Deep tinted windows
-
Tire Specific Low Tire Pressure Warning
-
Tire pressure Easy-Fill Tire Alert tire pressure fill assist
-
Tires P235/60HR18 AS BSW front and rear tires
-
Traction Control
-
Traction control All-speed ABS and driveline traction control
-
Transmission Type Automatic
-
Transmission electronic control
-
Trip computer
-
Trip odometer
-
Trunk hatch Trunk/hatch auto-latching
-
Trunk lid trim Plastic trunk lid trim
-
Turbocharged
-
USB Port
-
USB ports 4 USB ports
-
Variable panel light Variable instrument panel light
-
Vehicle tracker NissanConnect Services vehicle tracker
-
Ventilated brakes Front and rear ventilated disc brakes
-
Visor driver expandable coverage Driver visor with expandable coverage
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger expandable coverage Passenger visor with expandable coverage…
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Siri Eyes Free voice activated audio controls
-
WIFI Hotspot
-
Wheel well trim Black wheel well trim
-
Wheels 18 x 7.5-inch front and rear machined w/painted accents aluminum whee…
-
Window Trim Chrome side window trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless streaming Bluetooth wireless audio streaming
-
[b93] chrome rear bumper protector ($180.00 )
-
[f01] active noise cancellation delete