-
10 Speakers
-
110V/150W AC Power Outlet
-
12V power outlets 3 12V power outlets
-
2nd Row Captain's Chairs w/E-Z Entry & Armrest
-
2nd Row Captain's Chairs w/E-Z Entry and Armrest
-
2nd Row Heated Seats
-
3.58 Non-Limited Slip Rear Axle
-
3rd row seats: bench
-
4-Wheel Disc Brakes
-
50 State Emissions System
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
ABS brakes
-
AM/FM radio: SiriusXM
-
Accessory power Retained accessory power
-
Adaptive Cruise Control
-
Adaptive cruise control Adaptive Cruise Control with Stop-and-Go
-
Air Conditioning
-
Air conditioning Yes
-
All-in-one key All-in-one remote fob and ignition key
-
Alloy wheels
-
Alternator Type Regenerative alternator
-
Ambient Lighting
-
Ambient lighting
-
Amplifier
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Apple CarPlay/Android Auto
-
Armrests front center Front seat center armrest
-
Armrests rear mounted Second-row outboard-only mounted armrests
-
Auto High-beam Headlights
-
Auto door locks Auto-locking doors
-
Auto headlights Autolamp auto on/off headlight control
-
Auto high-beam headlights Auto High Beam auto high-beam headlights
-
Auto-Dimming Interior Rear-View Mirror
-
Auto-dimming door mirror driver Auto-dimming driver side mirror
-
Automatic Emergency Braking
-
Automatic brake hold
-
Automatic curve slowdown cruise control Predictive Speed Assist Automatic cu…
-
Automatic temperature control
-
Backup Camera
-
Basic warranty 36 month/36,000 miles
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Bench seats Third-row bench seat
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Blind Spot Monitor
-
Blind spot BLIS (Blind Spot Information System)
-
Body panels Galvanized steel/aluminum body panels with side impact beams
-
Bodyside cladding Black bodyside cladding
-
Bodyside insert Black bodyside insert
-
Brake Assist
-
Brake assist
-
Brake assist system
-
Brake type 4-wheel disc brakes
-
Built-in virtual assistant
-
Bulb warning Bulb failure warning
-
Bumper insert Black front bumper insert
-
Bumper rub strip rear Black rear bumper rub strip
-
Bumpers front Body-colored front bumper
-
Bumpers rear Body-colored rear bumper
-
Bumpers: body-color
-
Cabin air filter
-
Camera 360 Degree Camera aerial view camera
-
Capless fuel filler Easy Fuel capless fuel filler
-
Cargo access Power cargo area access release
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo tie downs Cargo area tie downs
-
Child door locks Manual rear child safety door locks
-
Climate control Automatic climate control
-
Clock Digital clock
-
Compass
-
Compressor Intercooled turbo
-
Concealed cargo storage Cargo area concealed storage
-
Configurable instrumentation gauges
-
Console insert material Piano black console insert
-
Corrosion perforation warranty 60 month/unlimited
-
Cruise control Cruise control with steering wheel mounted controls
-
Cylinder head material Aluminum cylinder head
-
DRL preference setting
-
Day/Night rearview mirror
-
Delay off headlights Delay-off headlights
-
Delay-off headlights
-
Digital signal processor
-
Distance alert Following distance alert
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Body-colored door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Black door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirrors Power door mirrors
-
Door panel insert Metal-look door panel insert
-
Door trim insert Leatherette door trim insert
-
Drive type Rear-wheel drive
-
Driver attention monitor Driver Alert
-
Driver door bin
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 2-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Driver selectable steering effort
-
Driver vanity mirror
-
Drivetrain selectable Driver selectable drivetrain mode
-
Dual Climate Control
-
Dual front impact airbags
-
Dual front side impact airbags
-
Dual-zone front climate control
-
Eco Feedback ECO feedback display gauge
-
Electronic Stability Control
-
Electronic parking brake
-
Electronic stability control AdvanceTrac w/Roll Stability Control electronic…
-
Emergency SOS Capable 911 Assist emergency SOS system via mobile device
-
Emergency communication system: 911 Assist
-
Emissions LEV3-ULEV50 emissions
-
Emissions tiers Tier 3 Bin 50 emissions
-
Engine Cylinders EcoBoost I4
-
Engine EcoBoost 2.3L I-4 gasoline direct injection, DOHC, variable valve con…
-
Engine Location Front mounted engine
-
Engine Mounting direction Longitudinal mounted engine
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gauge
-
Equipment Group 300A Standard Package
-
Evasion assist system Evasive Steering Assist evasion assist system
-
Exterior Parking Camera Rear
-
External memory External memory control
-
First-row windows Power first-row windows
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Floor mats Carpet front and rear floor mats
-
Fob engine controls Intelligent Access with hands-free access and push butto…
-
Fog lights LED front fog lights
-
Folding door mirrors Manual folding door mirrors
-
Fore and aft second-row seat Second-row seats with manual fore and aft
-
Forward collision warning PCA with AEB and Intersection Assist forward colli…
-
Four wheel independent suspension
-
Front Bucket Seats
-
Front Center Armrest
-
Front License Plate Bracket
-
Front anti-roll Front anti-roll bar
-
Front anti-roll bar
-
Front camera Front mounted camera with washer
-
Front dual zone A/C
-
Front fog lights
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height and tilt adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front passenger lumbar Front passenger seat with 2-way power lumbar
-
Front reading lights
-
Front seat upholstery ActiveX cloth and leatherette front seat upholstery
-
Front seatback upholstery Cloth front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Fuel Type Premium Unleaded
-
Full gauge cluster screen
-
Fully automatic headlights
-
Garage door opener
-
Garage door transmitter
-
Gauge cluster display size (inches) Gauge cluster display size: 12.30
-
Glove box Locking glove box
-
Grille style Black grille
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Headlight type Reflector headlights
-
Headlights LED low and high beam headlights
-
Headlights on reminder
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated Seats
-
Heated Steering Wheel
-
Heated Unique Cloth Captain's Chairs
-
Heated door mirrors
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated front seats
-
Heated front seats Heated driver and front passenger seats
-
Heated rear seats
-
Heated steering wheel
-
Heated wiper area Heated rear wiper park
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill Start Assist
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated ignition switch
-
Immobilizer SecuriLock immobilizer
-
Instrumentation display Digital/analog instrumentation display
-
Integrated navigation Integrated navigation system with voice activation
-
Interior 120V AC power outlets 1 interior 120V AC power outlet
-
Interior accents Chrome and metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet access FordPass Connect 5G mobile hotspot internet access
-
Internet radio capability
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob keyless entry
-
Keyfob remote start
-
Keyless Entry
-
Keyless Start
-
Knee airbag
-
Knee airbag Driver side knee airbag
-
LED brake lights
-
Laminated window Laminated side window glass
-
Lane Departure Warning
-
Lane departure Lane Keeping Alert
-
Leather steering wheel
-
Left camera Left side camera
-
License plate front bracket Front license plate bracket
-
Limited Slip Center Differential
-
Lock-up transmission
-
Low level warnings Low level warning for fuel, washer fluid and brake fluid
-
Low tire pressure warning
-
Low tire pressure warning Tire specific low air pressure warning
-
Memory Seat
-
Memory settings Memory settings include: door mirrors
-
Mobile app access FordPass App mobile app access
-
Multiple headlights Multiple enclosed headlights
-
NO DEALER FEES!
-
Navigation System
-
Number of airbags 7 airbags
-
Number of beverage holders 10 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Number of memory settings 3 memory settings
-
Occupancy sensor Airbag occupancy sensor
-
Occupant sensing airbag
-
Oil level gauge
-
Oil pressure warning
-
One-touch down window Driver and passenger one-touch down windows
-
One-touch up window Driver and passenger one-touch up windows
-
Onyx
-
Outside temperature display
-
Over the air updates
-
Overdrive transmission
-
Overhead airbag
-
Overhead airbags Safety Canopy System curtain first, second and third-row ov…
-
Overhead console
-
Overhead console Mini overhead console
-
Overhead console storage
-
P275/45R21 AS BSW Tires
-
Paint Tri-coat paint
-
Painted calipers Red painted front and rear brake calipers
-
Panel insert Cloth and metal-look instrument panel insert
-
Panic alarm
-
Parking sensors Forward and Reverse Sensing System front, rear and side park…
-
Passenger door bin
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 6-way directional control…
-
Passenger vanity mirror
-
Pedestrian detection Pre-Collision Assist with Pedestrian Detection
-
Performance Brakes
-
Perimeter approach lighting Remote activated perimeter approach lighting wit…
-
Post collision braking system Post Collision Braking automatic post-collisio…
-
Power Driver Seat
-
Power Liftgate
-
Power door mirrors
-
Power driver seat
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Power passenger seat
-
Power passenger seat controls Passenger seat power reclining, lumbar support…
-
Power steering
-
Power windows
-
Power-Folding Sideview Mirrors w/Autofold
-
Powertrain type ICE
-
Powertrain warranty 60 month/60,000 miles
-
Premium Package
-
Primary display size 13.2 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
Radiator
-
Radio AM/FM/SiriusXM with 360Lsatellite
-
Radio: B&O Sound System by Bang & Olufsen
-
Rain Sensing Front Wipers
-
Rain detecting wipers
-
Rain-Sensing Wipers (Front Only)
-
Real time traffic Real-time traffic
-
Real time weather Real-time weather
-
Rear Air Conditioning Controls
-
Rear Cross Traffic Alert
-
Rear Spoiler
-
Rear Springs Regular grade rear springs
-
Rear air conditioning
-
Rear anti-roll Rear anti-roll bar
-
Rear anti-roll bar
-
Rear camera Rear camera with washer
-
Rear cargo door Power liftgate rear cargo door
-
Rear climate control Rear climate control system with separate controls
-
Rear collision warning Rear Cross-Traffic Braking collision mitigation
-
Rear head restraint control 2 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear headliner/pillar ducts Rear headliner/pillar climate control ducts
-
Rear reading lights
-
Rear seat direction Front facing rear seat
-
Rear seat upholstery ActiveX cloth and leatherette rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear window trim Black rear window trim
-
Rear window wiper
-
Rear windshield Fixed rear windshield
-
Rear windshield wipers
-
Rearview mirror Auto-dimming rear view mirror
-
Reclining second-row seats Manual reclining second-row seats
-
Red Painted Perf Front & Rear Brake Calipers
-
Remote keyless entry
-
Remote panic alarm
-
Restricted driving mode/alerts MyKey restricted driving mode/alerts
-
Right camera Right side camera
-
Roadside warranty 60 month/60,000 miles
-
Roof rails
-
Running lights LED daytime running lights
-
SAE Autonomy Level 2 - partial automation SAE Autonomy
-
ST-Line Street Pack
-
Satellite trial 3 month satellite trial subscription
-
Seatback storage pockets 2 seatback storage pockets
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seating capacity 6
-
Second-row seat folding position Fold forward second-row seatback
-
Second-row seats Second-row captains' chairs
-
Second-row seats fixed or removable Fixed second-row seats
-
Second-row windows Power second-row windows
-
Security system
-
Seek scan
-
Selectable mode transmission Terrain Management System selectable mode trans…
-
Service interval warning Intelligent Oil-Life Monitor service interval indic…
-
Shock absorbers Gas-pressurized shock absorbers
-
Shutters Active grille shutters
-
Skid plate 2 underbody skid plates
-
Smart device integration Apple CarPlay/Android Auto smart device wireless mi…
-
Smart device remote start
-
Speakers Bang & Olufsen speakers
-
Speakers number 10 speakers
-
Special paint Monotone paint
-
Speed control
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Speed sensitive wipers
-
Speed-Sensitive Wipers
-
Speed-sensing steering
-
Speedometer Redundant digital speedometer
-
Split folding rear seat
-
Split front seats Bucket front seats
-
Spoiler
-
Spoiler Rear lip spoiler
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Start-stop engine Auto stop-start engine
-
Steering Electric power-assist steering system
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering wheel material Leather steering wheel
-
Steering wheel mounted audio controls
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailgate control Tailgate/power door lock
-
Tailpipe Stainless steel quasi-dual exhaust
-
Telescoping steering wheel
-
Temperature display Exterior temperature display
-
Third Row Seating
-
Third-row fold into floor seats Manual fold into floor third-row seat
-
Third-row head restraint control Manual third-row head restraint control
-
Third-row head restraint number 2 third-row head restraints
-
Third-row head restraints Height adjustable third-row head restraints
-
Third-row seat facing Front facing third-row seat
-
Third-row seat fixed or removable Fixed third-row seats
-
Third-row seat upholstery ActiveX cloth and leatherette rear seat upholstery…
-
Third-row seatback upholstery Carpet third-row seatback upholstery
-
Third-row seats folding 50-50 folding third-row passenger seat
-
Third-row windows Fixed third-row windows
-
Tilt steering wheel
-
Tinted windows Deep tinted windows
-
Tire mobility kit
-
Tires P275/45VR21 AS BSW front and rear tires
-
Towing class Class III tow rating
-
Towing hitch Trailer hitch
-
Towing trailer sway Trailer sway control
-
Towing wiring harness Trailer wiring harness
-
Traction Control
-
Traction control
-
Traction control All-speed ABS and driveline traction control
-
Traffic sign information Traffic sign recognition
-
Trailer light malfunction warning
-
Transmission 10-speed automatic
-
Transmission Type Automatic
-
Transmission electronic control
-
Transmission fluid temperature warning Transmission fluid temp warning
-
Trip computer
-
Trip odometer
-
Trunk hatch Trunk/hatch auto-latching
-
Trunk lid trim Plastic trunk lid trim
-
Turbocharged
-
Turn signal in door mirrors Turn signal indicator in door mirrors
-
USB Port
-
USB ports 8 USB ports
-
Unresponsive driver assist
-
Variable panel light Variable instrument panel light
-
Variably intermittent wipers
-
Ventilated brakes Front and rear ventilated disc brakes
-
Visor driver expandable coverage Driver visor with expandable coverage
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger expandable coverage Passenger visor with expandable coverage…
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio SYNC 3 voice activated audio controls
-
Voice activated climate control Voice-activated climate control
-
WIFI Hotspot
-
Wheel well trim Black wheel well trim
-
Wheels 21 x 9-inch front and rear gray aluminum wheels
-
Wheels: 20in Ebony-Painted Machined Aluminum
-
Wheels: 21in Magnetite-Painted Aluminum
-
Window Trim Black side window trim
-
Windshield trim Black windshield trim
-
Wipers Variable intermittent front windshield wipers
-
Wireless Charging Pad
-
Wireless device charging Front wireless smart device charging
-
Wireless streaming Bluetooth wireless audio streaming