Skip to main content
Ad

Car shopper resources

Basics

Exterior color
Alpine White
Interior color
Cognac
Drivetrain
All-wheel Drive
MPG
24–34

Based on EPA mileage ratings. Use for comparison purposes only. Actual mileage will vary depending on driving conditions, driving habits, vehicle maintenance, and other factors.

Fuel type
Gasoline
Transmission
8-Speed Automatic
Engine
2.0L I4 16V GDI DOHC Turbo
VIN
3MW33CM06P8C86224
Stock #
B253520A
Mileage
22,326 mi.

Features

Convenience
  • Heated Seats
  • Heated Steering Wheel
  • Keyless Entry
  • Keyless Start
  • Navigation System
  • Remote Start
Entertainment
  • Apple CarPlay®
  • Bluetooth®
  • HomeLink
  • Premium Sound System
  • Satellite Radio
  • USB Port
Exterior
  • Alloy Wheels
  • Sunroof/Moonroof
Safety
  • Automatic Emergency Braking
  • Backup Camera
  • Brake Assist
  • Lane Departure Warning
  • Rain Sensing Wipers
  • Rear Cross Traffic Alert
  • Stability Control
Seating
  • Leather Seats
  • Memory Seat
View all features

Features

These features are associated with this vehicle type. Contact the seller to confirm this specific vehicle has them.

  • ***Bought & Serviced AT Tulley Bmw***
  • 10 Speakers
  • 1st and 2nd row curtain head airbags
  • 2 Door
  • 2 USB ports
  • 4-Wheel Disc Brakes
  • 4-wheel ABS Brakes
  • ABS Brakes
  • ABS and Driveline Traction Control
  • AM/FM Radio: Siriusxm
  • Aerodynamic Kit
  • Air Conditioning
  • Alloy Wheels
  • Ambient Lighting
  • Anti-theft alarm system
  • Apple Carplay & Android Auto Compatibility
  • Audio controls on steering wheel
  • Audio system memory card slot
  • Auto-Dimming Door Mirrors
  • Auto-Dimming Rear-View Mirror
  • Automatic High Beams
  • Automatic Temperature Control
  • Automatic front air conditioning
  • BMW Assist eCall
  • BMW Teleservices
  • Black High Gloss Trim
  • Black grille w/chrome surround
  • Bluetooth wireless phone connectivity
  • Body-colored bumpers
  • Brake Assist
  • Braking Assist
  • Bumpers: Body-Color
  • Cargo area light
  • Cargo tie downs
  • Center Console Trim : Piano Black/Metal-Look
  • Center Console: Full with covered storage
  • Clock : Digital
  • Coil front spring
  • Coil rear spring
  • Comfort Access Keyless Entry
  • Connecteddrive Services
  • Convenience Package
  • Cornering Lights
  • Cruise control
  • Cruise controls on steering wheel
  • Cupholders: Front and rear
  • Curb weight: 3,519 lbs.
  • Dash Trim : Piano black/metal-look
  • Daytime running lights
  • Delay-Off Headlights
  • Diameter of tires: 18.0"
  • Digital Audio Input
  • Door pockets: Driver and passenger
  • Door reinforcement: Side-impact door beam
  • Driver Door Bin
  • Driver Vanity Mirror
  • Driver airbag
  • Driver and passenger knee airbags
  • Driver seat memory
  • Dual Front Impact Airbags
  • Dual Front Side Impact Airbags
  • Dual front air conditioning zones
  • Dual illuminated vanity mirrors
  • Dusk sensing headlights
  • Electrochromatic auto-dimming mirrors
  • Electrochromatic rearview mirror
  • Electronic Stability Control
  • Emergency Communication System: BMW Assist Ecall
  • Engine immobilizer
  • Extended Shadowline Trim (Disc)
  • Exterior Parking Camera Rear
  • External temperature display
  • Floor mats: Carpet front and rear
  • Fold forward seatback rear seats
  • Forward Collision Mitigation : Active Driving Assistant
  • Four Wheel Independent Suspension
  • Four-wheel Independent Suspension
  • Front Anti-Roll Bar
  • Front Bucket Seats
  • Front Center Armrest
  • Front Dual Zone A/C
  • Front Head Room: 39.8"
  • Front Leg Room: 41.8"
  • Front Seat Type : Sport bucket
  • Front Shoulder Room: 55.9"
  • Front Sport Seats
  • Front Stabilizer Bar : Bar
  • Front Ventilated disc brakes
  • Front and rear suspension stabilizer bars
  • Front reading lights
  • Fuel Capacity: 13.7 gal.
  • Fuel Consumption: City: 24 mpg
  • Fuel Consumption: Highway: 34 mpg
  • Fuel Type: Premium unleaded
  • Fully Automatic Headlights
  • Gross vehicle weight: 4,398 lbs.
  • Harman/Kardon Surround Sound System
  • Headlights off auto delay
  • Heated Door Mirrors
  • Heated Front Seats
  • Heated Front Seats & Steering Wheel
  • Heated Steering Wheel
  • Heated driver mirror
  • Heated passenger mirror
  • Heated windshield washer jets
  • Hi-Fi Sound System
  • Illuminated Entry
  • Illuminated M Trim (Disc)
  • Independent front suspension classification
  • Independent rear suspension
  • Instrumentation: Low fuel level
  • Integrated Navigation System : with voice activation
  • Intercooled Turbo
  • Interior air filtration
  • Keyless ignition with push button start
  • Knee Airbag
  • Lane Departure Warning
  • Leather Shift Knob
  • Leather steering wheel trim
  • Leather/metal-look shift knob trim
  • Leatherette seat upholstery
  • Low Tire Pressure Warning
  • M Sport Package (Disc)
  • M Sport Pkg
  • M Sport Suspension
  • M Steering Wheel
  • Machined aluminum rims w/ painted accents
  • Max cargo capacity: 14 cu.ft.
  • Memorized Settings for 2 drivers
  • Memorized Settings including door mirror(s)
  • Memory Seat
  • Mobile hotspot internet access
  • Moonroof
  • Multi-link rear suspension
  • Navigation
  • Navigation System
  • Occupant Sensing Airbag
  • One 12V DC power outlet
  • Outside Temperature Display
  • Overall Length: 179.0"
  • Overall Width: 72.4"
  • Overall height: 54.8"
  • Overhead Airbag
  • Panic Alarm
  • Passenger Airbag
  • Passenger Door Bin
  • Passenger Vanity Mirror
  • Passenger reverse tilt mirror
  • Perforated Sensatec Upholstery
  • Permanent locking hubs
  • Power Door Mirrors
  • Power Driver Seat
  • Power Front Seats
  • Power Passenger Seat
  • Power Steering
  • Power remote driver mirror adjustment
  • Power remote trunk release
  • Power remote w/tilt down passenger mirror adjustment
  • Power retractable mirrors
  • Power windows
  • Privacy glass: Light
  • Radio Data System
  • Radio: AM/FM Audio System
  • Rain Sensing Wipers
  • Rain sensing front wipers
  • Rear Air Conditioning
  • Rear Anti-Roll Bar
  • Rear Collision Warning : Rear Cross Traffic Alert
  • Rear Head Room: 35.0"
  • Rear Leg Room: 32.2"
  • Rear Shoulder Room: 51.7"
  • Rear Spoiler
  • Rear Stabilizer Bar : Bar
  • Rear View Camera
  • Rear Window Defroster
  • Rear air conditioning with separate controls
  • Rear bench
  • Rear door type: Trunk
  • Rear heat ducts with separate controls
  • Remote Engine Start
  • Remote Keyless Entry
  • Remote activated exterior entry lights
  • Remote power door locks
  • Remote window operation
  • Seatback storage: 2
  • Seatbelt pretensioners: Front
  • Security System
  • Self-leveling headlights
  • Shadowline Exterior Trim
  • Side airbag
  • SiriusXM AM/FM/HD/Satellite Radio
  • SiriusXM Satellite Radio(TM)
  • Speed Control
  • Speed Sensitive Audio Volume Control
  • Speed-Sensing Steering
  • Speed-Sensitive Wipers
  • Speed-proportional electric power steering
  • Split Folding Rear Seat
  • Sport Steering Wheel
  • Stability control
  • Steering Wheel Mounted Audio Controls
  • Strut front suspension
  • Suspension class: Regular
  • Tachometer
  • Telescoping Steering Wheel
  • Tilt Steering Wheel
  • Tilt and telescopic steering wheel
  • Tire Pressure Monitoring System: Tire specific
  • Tires: Prefix: P
  • Tires: Profile: 45
  • Tires: Speed Rating: H
  • Tires: Width: 225 mm
  • Total Number of Speakers: 10
  • Traction Control
  • Transmission gear shifting controls on steering wheel
  • Transmission hill holder
  • Trip computer
  • Turn Signal Indicator Mirrors
  • Turn signal in mirrors
  • Type of tires: AS
  • Universal Garage-Door Opener
  • Variable Sport Steering
  • Variable intermittent front wipers
  • Variably Intermittent Wipers
  • Vehicle Emissions: LEV3-ULEV125
  • Video Monitor Location: Front
  • Wheel Diameter: 18
  • Wheel Width: 7.5
  • Wheelbase: 107.9"
  • Wheels: 18 X 7.5 M Double-Spoke (Style 848m)
  • Widescreen Display
  • Window grid antenna
  • Without Lines Designation Outside

Vehicle history by CARFAX

Accidents or damage
None reported
1-owner vehicle
Yes
Personal use only
Yes
The vehicle history information is supplied by third parties. Cars.com and the Seller are not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Please see Cars.com Terms and Conditions for further information.

Seller’s info

Tulley BMW of Nashua

(703 reviews)
147 Daniel Webster Hwy, Nashua, NH 03060

Seller’s notes about this car

BMW Certified. CARFAX One-Owner. Clean CARFAX. Bought & Serviced at Tulley BMW THIS BEAUTIFUL LITTLE COUPE IS THE HIGHEST APPEARANCE & PERFORMANCE LEVEL AVAILABLE - M SPORT PACKAGE! GIVE YOUR EARS THE GIFT OF BEAUTIFUL SURROUND SOUND PRODUCED BY HARMAN/KARDON! AND KEEP YOUR KEYS IN YOUR POCKET AT ALL TIMES WITH COMFORT ACCESS KEYLESS ENTRY! Aerodynamic Kit, Ambient Lighting, Automatic High Beams, Black High Gloss Trim, Comfort Access Keyless Entry, Convenience Package, harman/kardon Surround Sound System, Heated Front Seats, Heated Front Seats & Steering Wheel, Heated Steering Wheel, Illuminated M Trim (DISC), M Sport Package (DISC), M Sport Pkg, M Sport Suspension, M Steering Wheel, Moonroof, Rear Spoiler, Remote Engine Start, Shadowline Exterior Trim, Variable Sport Steering, Wheels: 18 x 7.5 M Double-Spoke (Style 848M), Without Lines Designation Outside. Come visit us today at 147 Daniel Webster Hwy in Nashua and let us show you how easy the car buying experience can be at Tulley BMW. New Vehicles & Pre-Owned Vehicles. BMW Certified Pre-Owned Details: Warranty Deductible: $0 1 year/Unlimited miles beginning after new car warranty expires. 6-yrs Roadside Assistance. SiriusXM Satellite Radio 3-mos free. Every BMW Certified Plug-in Hybrid comes with an 8-Year/100,000-Mile Battery Guarantee. The Initial Battery Transfers to the New Owner. Vehicle History Transferable Warranty Limited Warranty: 12 Month/Unlimited Mile Multipoint Point Inspection Roadside Assistance 24/34 City/Highway MPG At Tulley BMW of Nashua we don't just sell cars, we provide a complete car buying experience. We provide our customers with everything from car repair services and BMW $0 Cost Service to auto parts sales and financing. Come visit us today at 147 Daniel Webster Hwy in Nashua and let us show you how easy the car buying experience can be at Tulley BMW. New Vehicles & Pre-Owned Vehicles.
The integrity of the dealer makes all the difference.

Included warranty

Enjoy peace of mind with BMW program benefits. View program details
Maximum age/mileage
Certified Pre-Owned Elite with less than 15,000 miles; Certified Pre-Owned with less than 60,000 miles
Basic warranty terms
1 year/unlimited miles from expiration of 4-year/50,000-mile new car warranty
Powertrain
N/A
Dealer certification required
196-point inspection
Roadside assistance
Yes

Have a question?

Get answers, see the car, or find a good time for a test drive. Take the next step and contact the seller.

Contact seller

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Price history

Listed 19 days ago.
$9,011 total price reduction!
10/01/25 Listed $46,085
10/03/25 -$8,116 $37,969
10/17/25 -$895 $37,074
Total price amount is based on price change information provided by the seller.

Customize your payment

Based on est. car price of $37,074 at ...% APR* and ...% sales tax.
$... per month
Car price
$37,074
Down payment
-Not Priced
Trade-in value
-Not Priced
Estimated sales tax ...%
(based on ZIP)
+
Other fees*
Not included
Total loan amount
Total interest paid
(over life of loan)
+
Total loan & interest paid
Monthly payment
Ad
Estimate trade-in
Estimate trade-in
Get prequalified

Not all customers will qualify. All decisions related to submission of consumer’s credit application, assignment of financing agreement, and available lenders are at sole discretion of the dealer. Cars.com is not an automobile dealer or a lender, and will not render a credit decision.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Ad

Similar cars at this dealership

BMW Certified
2023 BMW 230 i xDrive
22,042 mi.
$38,236 $9,924 price drop
BMW Certified
2025 BMW M235 Gran Coupe Xdrive
6,537 mi.
$48,443 $501 price drop
BMW Certified
2025 BMW 330 i xDrive
18,818 mi.
$40,772 $442 price drop
BMW Certified
2024 BMW 330 i xDrive
12,396 mi.
$41,555 $832 price drop
Ad

Car shopper resources

Cars.com Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; Cars.com is not responsible for the accuracy of such information. Cars.com provides this service and materials without representations or warranties of any kind, either expressed or implied. Click here for more details.

Bluetooth® is a registered mark of Bluetooth® SIG, Inc. Android Auto™ is a trademark of Google LLC. Apple CarPlay® is a registered trademark of Apple Inc. Burmester is a registered trademark of Burmester Audiosysteme GmbH, Berlin, Germany.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

Call
Check availability

Contact seller

Select a Salesperson (optional)

Check availability

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

  • Want to sell or trade-in your car fast? Get a free Instant Offer from local dealers.
  • Tell us about your car and get a free Instant Offer within minutes.
  • Schedule a car inspection with the dealer.
  • Use your Instant Offer to trade-in your car.
Get your Instant Offer