-
1st and 2nd row curtain head airbags
-
3.70 Axle Ratio
-
4 Door
-
4-Wheel Disc Brakes
-
4-wheel ABS Brakes
-
4WD Type (Full Time)
-
6 Speakers
-
ABS (4-Wheel)
-
ABS Brakes
-
ABS and Driveline Traction Control
-
AM/FM Radio: Siriusxm
-
Active Grille Shutters
-
Adaptive Stop And Go Cruise Control (Semi-Automatic)
-
Adaptive cruise control
-
Adaptive headlights
-
Air Conditioning
-
Air Filtration
-
Airbag Deactivation (Occupant Sensing Passenger)
-
All-Weather Floor Liners
-
Alloy Wheels
-
Alternator (150 Amps)
-
Antenna Type (Diversity)
-
Antenna Type (Mast)
-
Anti-Theft System (Alarm)
-
Anti-Theft System (Vehicle Immobilizer)
-
Anti-Whiplash Front Head Restraints
-
Anti-theft alarm system
-
Armrests (Rear Center With Cupholders)
-
Armrests (Rear Folding)
-
Assist Handle (Front)
-
Assist Handle (Rear)
-
Audio controls on steering wheel
-
Audio system memory card slot
-
Auto High-Beam Headlights
-
Auto Start/Stop
-
Auto-Dimming Exterior Mirror W/Approach Light
-
Auto-Dimming Mirror W/Compass & Homelink
-
Automatic Emergency Braking (Front Pedestrian)
-
Automatic Emergency Braking (Front)
-
Automatic Temperature Control
-
Automatic front air conditioning
-
Autonomous Lane Guidance (Lane Centering)
-
Auxilliary engine cooler
-
Battery (Maintenance-Free)
-
Battery Saver
-
Black grille
-
Blind Spot Safety (Sensor/Alert)
-
Bluetooth wireless phone connectivity
-
Body-colored bumpers
-
Brake Assist
-
Braking Assist
-
Bucket front seats
-
Bumper Detail (Front Underguard)
-
Bumper Detail (Rear Underguard)
-
Bumpers: Body-Color
-
Camera System (Rearview)
-
Camera System Washer (Rear)
-
Cargo Area Floor Mat (Rubber/Vinyl)
-
Cargo Cover (Retractable)
-
Cargo Net
-
Cargo area light
-
Cargo tie downs
-
Center Console (Front Console With Armrest And Storage)
-
Center Console (Illuminated)
-
Center Console (Organizer Tray)
-
Center Console Trim (Leatherette)
-
Center Console: Full with covered storage
-
Check Rear Seat Reminder
-
Child Safety Door Locks
-
Child Seat Anchors (Latch System)
-
Climate Controlled : Driver and passenger heated
-
Clock
-
Clock : Digital
-
Coil front spring
-
Coil rear spring
-
Connected In-Car Apps (Google Pois)
-
Connected In-Car Apps (Google Search)
-
Connected In-Car Apps (Siriusxm Travel Link)
-
Connected In-Car Apps (Yelp)
-
Cornering Brake Control
-
Courtesy Lights (Door)
-
Cross Traffic Alert (Rear)
-
Cruise controls on steering wheel
-
Crumple Zones (Front)
-
Crumple Zones (Rear)
-
Cupholders (Front)
-
Cupholders (Rear)
-
Cupholders: Front and rear
-
Curb weight: 3,552 lbs.
-
Dash Trim (Metallic)
-
Daytime running lights
-
Diameter of tires: 18.0"
-
Digital Audio Input
-
Digital Odometer
-
Door Handle Color (Body-Color)
-
Door Trim (Leatherette)
-
Door pockets: Driver, passenger and rear
-
Door reinforcement: Side-impact door beam
-
Double wishbone rear suspension
-
Drive Mode Selector
-
Driver Assistance App (Roadside Assistance)
-
Driver Door Bin
-
Driver Seat (Heated)
-
Driver Seat Head Restraint Whiplash Protection
-
Driver Seat Power Adjustments (10)
-
Driver Seat Power Adjustments (Height)
-
Driver Seat Power Adjustments (Lumbar)
-
Driver Seat Power Adjustments (Reclining)
-
Driver Vanity Mirror
-
Driver knee airbags
-
Dual Front Impact Airbags
-
Dual Front Side Impact Airbags
-
Dual front air conditioning zones
-
Dual illuminated vanity mirrors
-
Dusk sensing headlights
-
Electronic Brakeforce Distribution
-
Electronic Messaging Assistance (Voice Operated)
-
Electronic Messaging Assistance (With Read Function)
-
Electronic Parking Brake (Auto Off)
-
Electronic Stability Control
-
Emergency Communication System: Starlink Safety And Security (Subscription R…
-
Emergency Locking Retractors (Front)
-
Emergency Locking Retractors (Rear)
-
Engine immobilizer
-
Exhaust Tip Color (Stainless Steel)
-
Exterior Entry Lights (Approach Lamps)
-
Exterior Parking Camera Rear
-
External temperature display
-
Fender Lip Moldings (Black)
-
Fixed antenna
-
Floor Mat Material (Carpet)
-
Floor Material (Carpet)
-
Floor mats: Carpet front and rear
-
Fold forward seatback rear seats
-
Four Wheel Independent Suspension
-
Four-wheel Independent Suspension
-
Front Air Conditioning (Automatic Climate Control)
-
Front Air Conditioning Zones (Dual)
-
Front Airbags (Dual)
-
Front Anti-Roll Bar
-
Front Brake Type (Ventilated Disc)
-
Front Bucket Seats
-
Front Bumper Color (Black)
-
Front Center Armrest
-
Front Dual Zone A/C
-
Front Fog Lights
-
Front Fog Lights (Led)
-
Front Head Room: 40.2"
-
Front Headrests (2)
-
Front Headrests (Adjustable)
-
Front Hip Room: 54.5"
-
Front Leg Room: 43.3"
-
Front Seat Type (Bucket)
-
Front Seatbelts (3-Point)
-
Front Shock Type (Gas)
-
Front Shoulder Room: 58.1"
-
Front Spring Type (Coil)
-
Front Stabilizer Bar
-
Front Stabilizer Bar : Bar
-
Front Struts (Macpherson)
-
Front Suspension Classification (Independent)
-
Front Suspension Type (Lower Control Arms)
-
Front Ventilated disc brakes
-
Front Wipers (Variable Intermittent)
-
Front and rear suspension stabilizer bars
-
Front fog/driving lights
-
Front reading lights
-
Fuel Capacity: 16.6 gal.
-
Fuel Consumption: City: 26 mpg
-
Fuel Consumption: Highway: 33 mpg
-
Fuel Economy Display (Mpg)
-
Fuel Economy Display (Range)
-
Fuel Type: Regular unleaded
-
Fully Automatic Headlights
-
Gauge (Tachometer)
-
Grille Color (Black)
-
Gross Vehicle Weight : 4,891 lbs.
-
Hands-Free Phone Call Integration (Voice Operated)
-
Harman/Kardon 9-Speaker Audio System
-
Head Restraint Whiplash Protection with Passenger Seat
-
Headlight Bezel Color (Black)
-
Headlights (Auto Delay Off)
-
Headlights (Auto High Beam Dimmer)
-
Headlights (Auto On/Off)
-
Headlights (Cornering)
-
Headlights (Led)
-
Headlights (Self-Leveling)
-
Headlights (Wiper Activated)
-
Heated Door Mirrors
-
Heated Front Bucket Seats
-
Heated Front Seats
-
Heated Steering Wheel
-
Heated Windshield Wiper Rests
-
Heated driver mirror
-
Heated passenger mirror
-
Heated windshield washer jets, Wiper park
-
Hill Holder Control
-
Illuminated Entry
-
Impact Absorbing Seats (Dual Front)
-
Impact Sensor (Door Unlock)
-
Impact Sensor (Fuel Cut-Off)
-
In-Dash CD (Mp3 Playback)
-
In-Dash CD (Single Disc)
-
In-Dash single CD player
-
Independent front suspension classification
-
Independent rear suspension
-
Infotainment (Starlink)
-
Infotainment Screen Size (8 In.)
-
Instrument Cluster Screen Size (6.3 In.)
-
Instrumentation: Low fuel level
-
Integrated Swing-In-Place Crossbars
-
Interior air filtration
-
Internet Radio App (Aha)
-
Internet Radio App (Pandora)
-
Internet Radio App (Stitcher)
-
Keyless Access W/ Pushbutton Start
-
Knee Airbag
-
Knee Airbags (Driver)
-
Laminated Glass (Acoustic Windshield)
-
Lane Deviation Sensors
-
Lane Keeping Assist
-
Leather Shift Knob
-
Leather seat upholstery
-
Leather/metal-look shift knob trim
-
Leather/metal-look steering wheel trim
-
Left rear passenger door type: Conventional
-
Liftgate Window (Fixed)
-
Low Tire Pressure Warning
-
MP3 player
-
Machined aluminum rims w/ painted accents
-
Manufacturer's 0-60mph acceleration time (seconds): 8.5 s
-
Max cargo capacity: 69 cu.ft.
-
Memorized Settings (Liftgate)
-
Metal-look center console trim
-
Metal-look dash trim
-
Mirror Color (Body-Color)
-
Moonroof / Sunroof (Anti-Trapping)
-
Moonroof / Sunroof (One-Touch Open/Close)
-
Moonroof / Sunroof (Power Panoramic)
-
Moonroof / Sunroof (Sliding Sunshade)
-
Multi-Function Display
-
Multi-Function Remote (Panic Alarm)
-
Multi-Function Remote (Proximity Entry System)
-
Multi-Function Remote (Trunk Release)
-
Nav & Harman/Kardon & Rab & Heated Steering Wheel
-
Navigation System
-
Occupant Sensing Airbag
-
Off-Road Driving Assist (Hill Descent)
-
One-Touch Windows (2)
-
Outside Temperature Display
-
Overall Length: 182.7"
-
Overall Width: 71.5"
-
Overall height: 68.1"
-
Overhead Airbag
-
Overhead Console
-
Overhead Console (Front)
-
Overhead console: Mini with storage
-
Panic Alarm
-
Panoramic Express Open/Close Glass Sunroof
-
Passenger Airbag
-
Passenger Door Bin
-
Passenger Seat (Heated)
-
Passenger Seat Manual Adjustments (4)
-
Passenger Seat Manual Adjustments (Reclining)
-
Passenger Vanity Mirror
-
Perforated Leather-Trimmed Upholstery
-
Permanent locking hubs
-
Popular Package #2
-
Power Brakes
-
Power Door Locks (Anti-Lockout)
-
Power Door Locks (Auto-Locking)
-
Power Door Mirrors
-
Power Driver Seat
-
Power Moonroof: Panoramic
-
Power Outlet(S) (12v Cargo Area)
-
Power Outlet(S) (12v Front)
-
Power Outlet(S) (12v Rear)
-
Power Outlet(S) (Usb Front)
-
Power Steering (Variable/Speed-Proportional)
-
Power Windows (Lockout Button)
-
Power Windows (Safety Reverse)
-
Power liftgate
-
Power remote driver mirror adjustment
-
Power remote passenger mirror adjustment
-
Power remote trunk release
-
Power windows
-
Pre-Collision Warning System (Audible Warning)
-
Pre-Collision Warning System (Pedestrian Detection)
-
Pre-Collision Warning System (Visual Warning)
-
Privacy glass: Deep
-
Push-Button Start
-
Radio (Am/Fm)
-
Radio (Hd Radio)
-
Radio (Touch Screen Display)
-
Radio (Voice Operated)
-
Radio Data System
-
Radio: Subaru Starlink 8.0 Multimedia Nav System
-
Radio: Subaru Starlink 8.0 Multimedia Plus System
-
Reading Lights (Front)
-
Reading Lights (Rear)
-
Rear Anti-Roll Bar
-
Rear Brake Type (Ventilated Disc)
-
Rear Bumper Color (Black)
-
Rear Bumper Cover
-
Rear Head Room: 37.6"
-
Rear Headrests (3)
-
Rear Headrests (Adjustable)
-
Rear Hip Room: 53.5"
-
Rear Leg Room: 39.4"
-
Rear Privacy Glass
-
Rear Seat Center Armrest
-
Rear Seat Folding (One-Touch Fold Flat)
-
Rear Seat Folding (Split)
-
Rear Seat Manual Adjustments (Reclining)
-
Rear Seat Type (60-40 Split Bench)
-
Rear Seatbelts (3-Point)
-
Rear Shock Type (Gas)
-
Rear Shoulder Room: 57.2"
-
Rear Spoiler (Roofline)
-
Rear Spoiler Color (Body-Color)
-
Rear Spring Type (Coil)
-
Rear Stabilizer Bar
-
Rear Stabilizer Bar : Bar
-
Rear Suspension Classification (Independent)
-
Rear Suspension Type (Double Wishbone)
-
Rear Trunk/Liftgate (Liftgate)
-
Rear Trunk/Liftgate (Power Operated)
-
Rear Vents (Second Row)
-
Rear Window Defroster
-
Rear Window Wiper
-
Rear Wiper (Auto-On In Reverse)
-
Rear Wiper (Intermittent)
-
Rear Wiper (With Washer)
-
Rear area cargo cover: Roll-up
-
Rear center seatbelt: 3-point belt
-
Rear door type: Power liftgate
-
Rear seats center armrest
-
Rear spoiler: Lip
-
Rearview Mirror (Manual Day/Night)
-
Rearview Monitor (In Dash)
-
Remote Keyless Entry
-
Remote activated exterior entry lights
-
Remote power door locks
-
Reverse Automatic Braking System (Rab)
-
Right rear passenger door type: Conventional
-
Rocker Panel Color (Black)
-
Roof Rack Rails
-
Roof Rails (Black)
-
STARLINK Safety and Security (Subscription Required)
-
Safety Brake Pedal System
-
Seatback storage: 2
-
Seatbelt Force Limiters (Front)
-
Seatbelt Pretensioners (Front)
-
Seatbelt Warning Sensor (Front)
-
Seatbelt pretensioners: Front
-
Security System
-
Self-leveling headlights
-
Shift Knob Trim (Leather)
-
Side Airbags (Front)
-
Side Curtain Airbags (Front)
-
Side Curtain Airbags (Rear)
-
Side Mirror Adjustments (Manual Folding)
-
Side Mirror Adjustments (Power)
-
Side Mirrors (Heated)
-
Side Mirrors (Integrated Turn Signals)
-
Side airbag
-
SiriusXM AM/FM/HD/Satellite Radio
-
SiriusXM Satellite Radio(TM)
-
Smart Device App Compatibility (Mysubaru)
-
Smart Device App Function (Engine Start)
-
Smart Device App Function (Horn/Light Operation)
-
Smart Device App Function (Lock Operation)
-
Smart Device App Function (Maintenance Scheduling)
-
Smart Device App Function (Maintenance Status)
-
Smart Device App Function (Vehicle Location)
-
Smartphone Integration (Android Auto)
-
Smartphone Integration (Apple Carplay)
-
Spare Tire Mount Location (Inside)
-
Spare Tire Mount Location: Inside under cargo
-
Spare Tire Size (Temporary)
-
Spare Wheel Type (Steel)
-
Speed Sensitive Audio Volume Control
-
Speed Sensitive Volume Control
-
Speed-Sensing Steering
-
Speed-proportional electric power steering
-
Split Folding Rear Seat
-
Split rear bench
-
Spoiler
-
Stability control
-
Starlink/Apple Carplay/Android Auto
-
Steel spare wheel rim
-
Steering Wheel (Tilt And Telescopic)
-
Steering Wheel Mounted Audio Controls
-
Steering Wheel Mounted Controls (Audio)
-
Steering Wheel Mounted Controls (Cruise Control)
-
Steering Wheel Mounted Controls (Multi-Function)
-
Steering Wheel Mounted Controls (Paddle Shifter)
-
Steering Wheel Mounted Controls (Phone)
-
Steering Wheel Mounted Controls (Voice Control)
-
Steering Wheel Trim (Leather)
-
Storage (Cargo Tie-Down Anchors And Hooks)
-
Storage (Door Pockets)
-
Storage (Front Seatback)
-
Storage (Grocery Bag Holder)
-
Storage (In Floor)
-
Storage (Sunglasses Holder)
-
Strut front suspension
-
Suspension class: Regular
-
Tachometer
-
Telescoping Steering Wheel
-
Three 12V DC power outlets
-
Tilt Steering Wheel
-
Tilt and telescopic steering wheel
-
Tinted Glass
-
Tire Pressure Monitoring System
-
Tire Pressure Monitoring System: Tire specific
-
Tires: Prefix: P
-
Tires: Profile: 55
-
Tires: Speed Rating: H
-
Tires: Width: 225 mm
-
Total Number of Speakers: 6
-
Total Speakers (6)
-
Touchscreen System
-
Traction Control
-
Trailer Stability Control
-
Transmission gear shifting controls on steering wheel
-
Transmission hill holder
-
Trip Odometer
-
Trip computer
-
Turn Signal Indicator Mirrors
-
Turn signal in mirrors
-
Type of tires: AS
-
Upholstery (Leather-Trimmed)
-
Upholstery Accents (Contrast Stitching)
-
Upholstery Accents (Perforated)
-
Vanity Mirrors (Dual Illuminating)
-
Variable intermittent front wipers
-
Variably Intermittent Wipers
-
Vehicle Emissions: LEV3-SULEV30
-
Video Monitor Location: Front
-
Warnings And Reminders (Coolant Temperature Warning)
-
Warnings And Reminders (Lamp Failure)
-
Warnings And Reminders (Low Fuel Level)
-
Warnings And Reminders (Low Oil Pressure)
-
Warnings And Reminders (Low Washer Fluid)
-
Warnings And Reminders (Maintenance Due)
-
Wheel Diameter: 18
-
Wheel Width: 7
-
Wheelbase: 105.1"
-
Wheels (Painted Aluminum Alloy)
-
Wheels: 18 X 7.0 J Black Machine Finish Alloy
-
Wi-Fi (Hotspot Compatible)
-
Window Defogger (Rear)
-
Window Trim (Chrome)