Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Used Acura sedans for sale near Five Points, OH

Filters 3 Year Model Price & payment Make Mileage Body style Ext. color All filters
53 matches 30 miles from 45066
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Modern Steel Metallic
Int. color: Ebony
Drivetrain: All-wheel Drive
MPG: 21-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, VTEC variable valve cont
Stock #: 6702161
VIN: 19UUB6F58PA001257

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Columbia Hyundai review

Johnny Combs was our sales consultant and he helped us

Johnny Combs was our sales consultant and he helped us tremendously! We weren’t too sure of what car we wanted but he was able to help us find the perfect fit. The whole process was surprisingly fast and was able to drive out of the lot with an amazing car! Everyone was friendly and very accommodating! Thank you Johnny for all your help!

2023 Acura TLX A-Spec review

TLX platform is absolutely excellent.

TLX platform is absolutely excellent. The car has fantastic road feel thanks to double wishbone suspension and redesigned chassis. The DCT transmission feels precision and having 10 gears puts you in the perfect torque range almost always. The engine is a Honda K engine that can handle 1k hp. I have fwd which is absolutely perfect, simple car. The SH-AWD system is truly best of its kind. The fact that this almost perfect platform was discontinued is a sad commentary on the state of cars.

Vehicle information

Ext. color: Bellanova White Pearl
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 22-31
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 DOHC, i-VTEC variable valve control, premium unleaded,
Stock #: 55795S
VIN: JH4CU2F42DC013536

Features

Convenience: Heated Seats, Keyless Entry
Entertainment: Bluetooth®, CD Player, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jeff Schmitt Chevrolet South review

Allen and Jesse were awesome in helping us get our new

Allen and Jesse were awesome in helping us get our new truck! Going into it, we sort of knew what we were wanting but hadn't had a chance to test drive any of the trucks we were interested in. We came in pretty late and Allen was nice enough to get us out on a test drive right up to closing time. Then both Allen and Jesse sat down with us to explain pricing and what we would be looking at in terms of a myriad of payment options without being pushy, which we appreciated, and we went through our needs for a truck to make sure we were getting exactly what we needed for our farm. Overall, they took great care of us and we are happy with our new truck!

2013 Acura TSX 2.4 review

Loved my TSX

This car was the best car that I have ever owned and I have missed it so much and hate that I ever sold it!

Vehicle information

Ext. color: Modern Steel Metallic
Int. color: Espresso
Drivetrain: Front-wheel Drive
MPG: 24-34
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
Stock #: A60618HA
VIN: 19UDE2F75LA010624

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, USB Port
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

McCluskey Chevrolet review

The process was really easy and online friendly.

The process was really easy and online friendly. The salesperson Jorge was friendly and helpful and always available for questions/concerns. Any hesitation I had was met with respect and understanding not pressure.

2020 Acura ILX Premium Package review

I love my little red ILX.

I leased this car on Dec. 26, 2020. I bought it from the Dealer two weeks ago and now it's mine. I love the car the only problem I have had with this car is the battery, 2 of them and the car was still under warranty and didn't cost me anything.

Vehicle information

Ext. color: White
Int. color: Red
Drivetrain: Front-wheel Drive
MPG: 32-32
Fuel type: Gasoline
Transmission: Automatic 8-Speed
Engine: 2.4L I4 206hp 182ft. lbs.
Stock #: VIP006328
VIN: 19UUB1F62KA006328

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Memory Seat

Reviews

Premier Automotive review

I'm thrilled to have such a wonderful vehicle from

I'm thrilled to have such a wonderful vehicle from Premier and their great customer service is out of discussion! Highly recommend!!!

2019 Acura TLX Technology review

Beautiful

I have nothing but amazing things to say about my 2021 TLX SH-AWD ASPEC! It is beautiful, sporty, reliable. It drives like a sports car or a luxury sedan while Always looking stylish. Everyone does a double take. The new model looks so much better! This is my 3rd TL/TLX

Vehicle information

Ext. color: Crystal Black Pearl
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 20-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 variable valve control, premium unleaded, engine with 2
Stock #: P11900
VIN: 19UUA8F50EA004438

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Bluetooth®, CD Player, DVD Player, HomeLink, Premium Sound System
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Frontier Motors review

Cars are clean and prices are fair.

Cars are clean and prices are fair. Purchased a nice 2011 Ranger at better than market price. No issues. I would buy another vehicle from Frontier if and when I needed it.

2014 Acura TL Technology review

Super reliable

Own one since brand new. Handed to my daughter after 8 years and 50k miles. Have not spent any money except oil changes and tires. Hoping to keep for another several years. Great blend of performance and reliability. Very solid drive.

Vehicle information

Ext. color: Majestic Black Pearl
Int. color: Red
Drivetrain: All-wheel Drive
MPG: 21-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, VTEC variable valve cont
Stock #: ASA003079
VIN: 19UUB6F58SA003079

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Lexus of Dayton review

On the 19 Jan 2024, we made a purchase of a Vehicle from

On the 19 Jan 2024, we made a purchase of a Vehicle from Ricardo Rutledge,a very excellent Salesman, his attention to detail was instrumental to us in purchasing a car. I would like to express an outstanding job. His help was greatly appreciated. Continue in during a job well done. I would recommend his service to others.-

Vehicle information

Ext. color: Steel
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 22-31
Fuel type: Gasoline
Transmission: 10-Speed Automatic
Engine: 2.0L I4 16V GDI DOHC Turbo
Stock #: 6512538A
VIN: 19UUB5F33PA000946

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start
Entertainment: Bluetooth®, HomeLink, Satellite Radio, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Backup Camera, Brake Assist, LED Headlights, Lane Departure Warning, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jeff Wyler Acura of Fairfield review

Great experience at Jeff Wyler Acura.

Great experience at Jeff Wyler Acura. They helped me find my new Acura MDX everyone was super helpful. 10 out of 10 experience.

2023 Acura TLX Base review

I had a 21 TLX advanced with the 2.

I had a 21 TLX advanced with the 2.0 L four-cylinder turbo and in 2023 I traded it for the TLX type S. What a shockingly different car. Granted the car probably has about 75 hp less than it should from the factory but, it’s easy to tune and mine is in the 435 hp range now. It was a great car to begin with and now it’s even better. There are a couple nagging issues with it: the brakes rattle, the Brembo brakes upfront, the pads on the inside, rattle like a bad ball joint whenever you hit a bump. The dealer couldn’t fix the problem and Acura told them “that’s the way it is, they are performance brakes“ well that’s a bunch of hog wash so I fixed it myself. Just an inexpensive shim on the inside pad and all was fixed. There are some long-term issues that IJust an inexpensive shim on the inside pad and all was fixed. There are some long-term issues that I am concerned about: the rear suspension plug for the adaptive suspension can get corroded over overtime and the entire car needs to be stripped apart to replace a wire harness. I haven’t had an issue with this, but I did grease my rear plugs just to be on the safe side. And these cars are known to have transfer case issues, resulting in a transmission replacement. Again, I haven’t had that issue, but the car only has 9000 miles on it. Just things that I am concerned about long-term as it seems Honda/Acura reliability, even though better than anything out there, isn’t what it used to be. But this is a fantastic car! And I would absolutely buy it again.

Vehicle information

Ext. color: Black
Int. color: Black
Drivetrain: Front-wheel Drive
MPG: 34-34
Fuel type: Gasoline
Transmission: Automatic 8-Speed
Engine: 2.4L I4 201hp 180ft. lbs.
Stock #: VIP007611
VIN: 19UDE2F39KA007611

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player, USB Port
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Lane Departure Warning, Stability Control
Seating: Leather Seats

Reviews

Premier Automotive review

Premier Automotive is the best dealership to buy a used

Premier Automotive is the best dealership to buy a used car from, I'm very happy with my purchase)))

2019 Acura ILX Base review

Overall will be back for service for my car

Thank you John Shaw for assisting me with getting my car service today .. and was able to get to work on time . John is always will to help and explain the information to you

Vehicle information

Ext. color: Carbon Gray Pearl
Int. color: Gray
Drivetrain: Front-wheel Drive
MPG: 22-31
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 DOHC, i-VTEC variable valve control, premium unleaded,
Stock #: P11946
VIN: JH4CL96817C005706

Features

Convenience: Heated Seats, Keyless Entry
Entertainment: Bluetooth®, CD Player, HomeLink
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Frontier Motors review

Best place I’ve ever been for a car.

Best place I’ve ever been for a car. We’ve bought two cars now. Any issues they helped us out immediately just very pleasant to work with these great folks. I would highly recommend you go check them out. You won’t be disappointed I promise

2007 Acura TSX Base review

Great car to own, all around!!

Hard to believe, but still love the car like day one. Exterior design is very nice, inside is luxurious, technology still up today. Inside when car is on you don’t even feel it!

Vehicle information

Ext. color: Crystal Black Pearl
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 24-35
Fuel type: Gasoline
Transmission: Automatic 5-Speed
Engine: 2L I-4 i-VTEC variable valve control, premium unleaded, engine w
Stock #: D260306
VIN: 19VDE1F56DE016981

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player, DVD Player, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats

Reviews

Automotive Connection review

They are pretty great, really.

They are pretty great, really. The car I went to look at didn't work out, but it was still a good experience. I kinda felt bad that I couldn't buy something from them. If you're looking for something, particularly on a budget, it's worth stopping in.

2013 Acura ILX 2.0L w/Premium Package review

Amazing Vehicle

I loved my 2013 Acura ILX! This car is incredibly reliable. I drove mine for 7 years with minimal, standard maintenance. Would still be driving it, but upgraded to a larger vehicle for a new season of life. I would recommend this car 100 times over. Great gas mileage, low maintenance, and amazing feel of a luxury vehicle.

Vehicle information

Ext. color: Graphite Luster Metallic
Int. color: Parchment
Drivetrain: Front-wheel Drive
MPG: 22-31
Fuel type: Gasoline
Transmission: Automatic 5-Speed
Engine: 2.4L I-4 DOHC, i-VTEC variable valve control, premium unleaded,
Stock #: GTX005064
VIN: JH4CU2F40EC005064

Features

Convenience: Heated Seats, Keyless Entry
Entertainment: Bluetooth®, CD Player, HomeLink, Satellite Radio, USB Port
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

GTX Auto Group INC review

Everyone was truly nice and worked hard to make sure I

Everyone was truly nice and worked hard to make sure I got my car thanks GTX

2014 Acura TSX 2.4 review

Excellent vehicle

This vehicle is a fresh , smooth , sleek and reliable automobile. I’ve totally enjoyed it . This is the second Acura TSX I’ve purchased

Vehicle information

Ext. color: Polished Metal Metallic
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 21-30
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 DOHC, i-VTEC variable valve control, premium unleaded,
Stock #: 67T0794
VIN: JH4CU26649C006144

Features

Convenience: Heated Seats, Keyless Entry, Navigation System
Entertainment: Bluetooth®, CD Player, DVD Player, HomeLink, Premium Sound System, Satellite Radio
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jeff Wyler Acura of Dayton review

Could not ask for a better car buying experience.

Could not ask for a better car buying experience. Was able to shop and test drive without the high pressure sales tactics. But Allyn and Jim were always available if I had any questions. The staff was friendly, and the show room was incredible.

2009 Acura TSX Technology review

This car is basically a suited up Honda Accord of it's

This car is basically a suited up Honda Accord of it's time. It was actually sold as an Accord in Europe during this time. It's a great vehicle with amazing reliability. However, right around 150-160K miles you will most likely need to re-do the timing chain as I did recently (~$1500). A very common issue in this 2.4L motor. I bought my 2010 with 30K miles on it out of a lease and currently have 160K miles on it. I've only had to do regular maintenance and the car still runs great.

Vehicle information

Ext. color: Platinum White Pearl
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 24-34
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
Stock #: B9000239
VIN: 19UDE2F88KA000239

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, Satellite Radio, USB Port
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Crossroads Car and Truck review

I’ve never had more informed and upfront group of guys

I’ve never had more informed and upfront group of guys selling cars, no xx no upsell, Professional, fast, courteous! If you need to use car, these are the guys to see. Highly rated car by an experience.

2019 Acura ILX Premium & A-SPEC Packages review

Super…. Colors are super nice..

Excelente handling. Love the looks. Super comfortable. Excelente interior. The power is greeraaatttt…. Compact but huge in looks/handling/power Very comfortable/ elegant/ one heck of a looker. I owned one previously and went for my second. Interior looks, fantastic.

Vehicle information

Ext. color: Modern Steel Metallic
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 24-34
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
Stock #: Z004119
VIN: 19UDE2F85LA004119

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

International Auto Outlet review

I highly recommend International Auto Outlet in OH for

I highly recommend International Auto Outlet in OH for anyone looking for a reliable Toyota. The dealership has a great inventory and excellent customer service. The buying process was quick and smooth. I’m very pleased with my new car.

2020 Acura ILX Technology Package review

Love it!

Got this when I was looking for a smaller entry level luxury car, non -turbo and with a lower cost to own. Try to get the premium, for the dual screens and carplay.

Vehicle information

Ext. color: Crystal Black Pearl
Int. color: Ebony
Drivetrain: Front-wheel Drive
MPG: 25-36
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
Stock #: 005942
VIN: 19UDE2F78GA005942

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player, HomeLink, USB Port
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

DecentRide.Com review

I finally found my dream car at Decent Ride after a long

I finally found my dream car at Decent Ride after a long search. Andrew provided excellent guidance and clear communication. As a family owned and operated dealership in Ohio, they focus on trust and service. The experience was smooth and positive.

2016 Acura ILX 2.4L review

Sporty and reliable, yet economical

Equip with a beautiful duel clutch transmission, this car feels amazing to drive, up until about 40, where the early gears start to lag, but as suggested sport mode or down shifting solves this. Coming from a Honda civic 2017, I can say this car although slightly dated in the inside, feels loads more powerful and comfortable. With seats that hug your body, giving you one of the most comfortable seats out of any car period. The ride itself is great too, although a tad stiff, which in it's self gives it good handling and corning in return. The only big con is the interior is a little dated compared to newer cars, so not a whole lot of smart phone integration besides aux, usb, or Bluetooth, although this means less issues with electrical issues like my old Honda had. Overall I couldn't recommend this car enough, as when buying used it is far cheaper and better than comparative civic models like the ext or si.

Vehicle information

Ext. color: WHITE
Int. color: Black
Drivetrain: Front-wheel Drive
MPG: 20-29
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L
Stock #: J003721
VIN: 19UUA8F24EA003721

Features

Convenience: Heated Seats, Keyless Entry
Entertainment: Bluetooth®, CD Player, HomeLink
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Preferred Autos LLC review

Perfect experience from start to finsh

This was the best used car shopping experience. The whole process was so easy and painless. That is not my usual experience as a female. Pat was wonderful and respectful. He showed me the car and had to jump it since the battery was dead. I notice the seal in the headlights was broke so moisture was inside the headlights. I said if I liked the car I’d need the headlights replaced. The car drove great. Pat agreed to replace the headlights and, without me even asking said, “obviously the battery is shot so I’ll replace that as well”. I asked if he thought it needed new tires, which I said I would pay for, and he said the tires were Michelin, a good brand with probably 10,000 miles left, so it should wait. I appreciate he didn’t try to sell me a set of tires I didn’t need. When I picked up the car, it had brand new headlights and a brand new battery. He didn’t pull parts from the junk yard or repurpose a battery from one of the other cars. He also spray painted the arms of the windshield wipers black (they were rusted metal) to make it look good. It was washed and waxed and looked great! He had the paperwork ready to go when I arrived to pick up so it was easy to complete the sale. That was 2 weeks ago and the car has been sound with no problems. Thanks Pat! I will never buy from anywhere else!

2014 Acura TL 3.5 review

Great Car for a 6 Ft Person

This feels like a full size sedan, great for cruising down the highway. Technology is a little dated, but I enjoy the car. Not looking forward to the timing belt replacement.

Vehicle information

Ext. color: Bellanova White Pearl
Drivetrain: Front-wheel Drive
MPG: 23-33
Fuel type: Gasoline
Transmission: Automatic
Engine: 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
Stock #: 009504
VIN: 19UUB1F53JA009504

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2018 Acura TLX Technology review

Great car for price

Excellent vehicle and luxurious. The experience was not extremely impressive but it met all my needs. I love the design, the power the cabin. I would definitely recommend this car.

Vehicle information

Ext. color: BLACK
Drivetrain: Front-wheel Drive
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L
Stock #: 12687
VIN: 19UUB2F39FA022625

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start
Entertainment: Bluetooth®, CD Player, HomeLink
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

VIP Auto Sales & Service review

I do plan to purchase an additional vehicle, but not

I do plan to purchase an additional vehicle, but not until the spring. No complaints.

2015 Acura TLX V6 review

I bought it new in January 2015.

I bought it new in January 2015. Three month later my wife and I drove it from Orange County, CA to Quebec. Across the lower US states, up the East Coast to Newfoundland, then Quebec. Down the Canadian side to Niagara Falls and on to Ohio (once our home state). Up through MI upper peninsula, the Dakotas into Saskatchewan. Across lower Canada to Vancouver and all the way down the West Coast to home. Averaged 33 mpg over 15,000 miles in 69 days. NEVER a problem! Still own it and now it's at 89,000 miles. New tires, brake pads, oil/filter is all I have done. It's my 8th Acura since 1989! Excellent cars!!

Vehicle information

Ext. color: Black
Int. color: Other
Drivetrain: Front-wheel Drive
MPG: 21-34
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 gasoline direct injection, i-VTEC VCM variable valve co
Stock #: 000275
VIN: 19UUB2F74FA000275

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Bluetooth®, CD Player, HomeLink, Premium Sound System, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Midwest Automotive Connection review

Incredible service

I walked in not wanting a large payment with not so good credit, I drove many cars over the course of about 3 hours, John was my salesman and was incredibly patient with my indecision. He pulled about a half a dozen of cars for me before I decided on the one I purchased. The finance Dept was incredibly helpful and I ended up with a much lower rate than I expected. They have a wide selection of vehicles as far as pricing, make and model, I could have left with a Ford Fiesta or a Bentley.. I’d recommend them to anyone.

2015 Acura TLX V6 Advance review

2015 Acura TLX Tech Pkg

I have a 2015 TLX Tech Pkg with the 2.4L 4 cylinder engine. Has been a pretty good car, bought it used with 51,000 miles and have put about 11,000 on it so far. Only had to do 2 oil changes at my local Acura dealership plus fluid changes as well as recommended in the manual. So far love the car and the 2 screen setup is pretty nice. Everyone always compliments the interior!

Vehicle information

Ext. color: Lunar Silver Metallic
Int. color: Ebony
Drivetrain: All-wheel Drive
MPG: 21-30
Fuel type: Gasoline
Transmission: Automatic
Engine: 3.5L V-6 gasoline direct injection, i-VTEC variable valve contro
Stock #: 56027A
VIN: 19UUB3F51JA003731

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Jeff Schmitt Chevrolet North review

The Right Place

Simply Satisfied with the quality work done to my vehicle and the outstanding staff that go out of their way to make sure I am comfortable with the service i receive. Sincerely, Avery Deal

2018 Acura TLX Technology review

Comfortable, Quiet, and drives beautifully

This car is perfect for me. I wanted a quiet, comfortable ride with good gas mileage for commuting. That is exactly what I got. The seat is supportive and comfortable, I got 38 mpg on the highway, and the stereo is amazing.

About Acura

FAQs

What is the cheapest Acura vehicle available?

The Acura TSX is the cheapest available vehicle by average Cars.com listing price in Acura's lineup, with an average listing price of $8,908.

Which Acura vehicle has the best MPG?

The Acura ILX Hybrid can reach up to 39 MPG city and 38 MPG highway for a combined rating of 38 MPG. The Acura Integra with traditional internal combustion engine offers up to 30 MPG city and 37 MPG highway for a combined rating of 33 MPG.

These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.

Which Acura vehicle has the longest range?

The electric Acura ZDX can travel up to 313 miles on a single charge depending on electric motor and battery options.

EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.

Which Acura vehicle has the most deals?

The Acura MDX has the most available deals on Cars.com with 470 great deals out of 3192 listings starting at $1,500.

Where can I find the most Acura deals?

The most Acura deals can be found near Centerville, OH with 7 great deals out of 47 listings starting at $3,695.

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

53 matches Clear
Reset
Basics
Acura models
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only

Acura Sedans by city

Acura Sedans in Five Points, OH by model

[{"applied_filter_criteria":"{\"bodystyle\":[\"sedan\"],\"cpo_indicator\":false,\"make_model_trim\":[{\"make\":\"acura\"}],\"search_range\":\"30\",\"shippable\":true,\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"used\"}","search_type":"general-inventory-search","sponsored_type_eligible":["inventory_ad"],"vehicle_array":[{"msrp":"0","stock_sub":"","dealer_name":"Columbia Hyundai","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45249","year":"2023","sponsored_type":"standard","canonical_mmt":"Acura:TLX:A-Spec","badges":["good_deal","hot_car"],"customer_id":"14597","listing_id":"4339c220-c5d4-4564-ac08-cac388289870","sponsored":false,"model":"TLX","vin":"19UUB6F58PA001257","canonical_mmty":"Acura:TLX:A-Spec:2023","cpo_package":null,"vertical_position":1,"price":"35970","drivetrain":"All-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"26256","photo_count":24,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"A-Spec","exterior_color":"Modern Steel Metallic","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Jeff Schmitt Chevrolet South","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45342","year":"2013","sponsored_type":"standard","canonical_mmt":"Acura:TSX:2.4","badges":["price_drop_in_cents","fair_deal"],"customer_id":"202493","listing_id":"3ac6e171-d821-4a33-81db-c2357e8c9f78","sponsored":false,"model":"TSX","vin":"JH4CU2F42DC013536","canonical_mmty":"Acura:TSX:2.4:2013","cpo_package":null,"vertical_position":2,"price":"13788","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"100683","photo_count":31,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"2.4","exterior_color":"Bellanova White Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"McCluskey Chevrolet","stock_type":"Used","certified_preowned":false,"interior_color":"Espresso","fuel_type":"Gasoline","dealer_zip":"45249","year":"2020","sponsored_type":"standard","canonical_mmt":"Acura:ILX:Premium Package","badges":["fair_deal"],"customer_id":"14607","listing_id":"c515c1c9-cc9c-449b-ab78-28a466ed0116","sponsored":false,"model":"ILX","vin":"19UDE2F75LA010624","canonical_mmty":"Acura:ILX:Premium Package:2020","cpo_package":null,"vertical_position":3,"price":"27989","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"22710","photo_count":41,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Premium Package","exterior_color":"Modern Steel Metallic","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Premier Automotive","stock_type":"Used","certified_preowned":false,"interior_color":"Red","fuel_type":"Gasoline","dealer_zip":"45150","year":"2019","sponsored_type":"standard","canonical_mmt":"Acura:TLX:Technology","badges":["good_deal"],"customer_id":"5343319","listing_id":"c3e5fa2c-8383-42dc-8d38-bac23ba4f6f1","sponsored":false,"model":"TLX","vin":"19UUB1F62KA006328","canonical_mmty":"Acura:TLX:Technology:2019","cpo_package":null,"vertical_position":4,"price":"16495","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"131981","photo_count":23,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology","exterior_color":"White","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Frontier Motors","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45044","year":"2014","sponsored_type":"standard","canonical_mmt":"Acura:TL:Technology","badges":["good_deal"],"customer_id":"5243245","listing_id":"c44a5cdb-d662-4e4d-8463-0fc1fe7ae238","sponsored":false,"model":"TL","vin":"19UUA8F50EA004438","canonical_mmty":"Acura:TL:Technology:2014","cpo_package":null,"vertical_position":5,"price":"11588","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"135049","photo_count":44,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology","exterior_color":"Crystal Black Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Lexus of Dayton","stock_type":"Used","certified_preowned":false,"interior_color":"Red","fuel_type":"Gasoline","dealer_zip":"45458","year":"2025","sponsored_type":"standard","canonical_mmt":"Acura:TLX:A-Spec","badges":["price_drop_in_cents","good_deal"],"customer_id":"14698","listing_id":"62693f10-2446-40bf-8bd1-fdb0a40fd243","sponsored":false,"model":"TLX","vin":"19UUB6F58SA003079","canonical_mmty":"Acura:TLX:A-Spec:2025","cpo_package":null,"vertical_position":6,"price":"43750","drivetrain":"All-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"3357","photo_count":40,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"A-Spec","exterior_color":"Majestic Black Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":null,"stock_sub":"","dealer_name":"Jeff Wyler Acura of Fairfield","stock_type":"Used","certified_preowned":true,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45014","year":"2023","sponsored_type":"standard","canonical_mmt":"Acura:TLX:Base","badges":["price_drop_in_cents","great_deal","cpo"],"customer_id":"6051383","listing_id":"5401133c-6f94-44fb-aa5a-5b2cd98b3c35","sponsored":true,"model":"TLX","vin":"19UUB5F33PA000946","canonical_mmty":"Acura:TLX:Base:2023","cpo_package":"Acura Precision Certified","vertical_position":7,"price":"28690","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":true,"nvi_program":false,"mileage":"24724","photo_count":37,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Base","exterior_color":"Steel","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Premier Automotive","stock_type":"Used","certified_preowned":false,"interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"45150","year":"2019","sponsored_type":"standard","canonical_mmt":"Acura:ILX:Base","badges":["good_deal"],"customer_id":"5343319","listing_id":"af4faffc-9f00-423f-8847-04bee96b6a5c","sponsored":false,"model":"ILX","vin":"19UDE2F39KA007611","canonical_mmty":"Acura:ILX:Base:2019","cpo_package":null,"vertical_position":8,"price":"14995","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"103725","photo_count":22,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Base","exterior_color":"Black","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Frontier Motors","stock_type":"Used","certified_preowned":false,"interior_color":"Gray","fuel_type":"Gasoline","dealer_zip":"45044","year":"2007","sponsored_type":"standard","canonical_mmt":"Acura:TSX:Base","badges":["fair_deal","hot_car"],"customer_id":"5243245","listing_id":"220d5595-5ce1-48de-ad09-40da4574485b","sponsored":false,"model":"TSX","vin":"JH4CL96817C005706","canonical_mmty":"Acura:TSX:Base:2007","cpo_package":null,"vertical_position":9,"price":"9998","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"132848","photo_count":41,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Base","exterior_color":"Carbon Gray Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Automotive Connection","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45014","year":"2013","sponsored_type":"standard","canonical_mmt":"Acura:ILX:2.0L w/Premium Package","badges":["good_deal"],"customer_id":"5243943","listing_id":"f7ccfbe4-5f93-4cd6-a967-9d0a68ab7fd6","sponsored":false,"model":"ILX","vin":"19VDE1F56DE016981","canonical_mmty":"Acura:ILX:2.0L w/Premium Package:2013","cpo_package":null,"vertical_position":10,"price":"10999","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"87851","photo_count":22,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"2.0L w/Premium Package","exterior_color":"Crystal Black Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"GTX Auto Group INC","stock_type":"Used","certified_preowned":false,"interior_color":"Parchment","fuel_type":"Gasoline","dealer_zip":"45011","year":"2014","sponsored_type":"standard","canonical_mmt":"Acura:TSX:2.4","badges":["fair_deal"],"customer_id":"5378287","listing_id":"64a5abb1-f4a2-410c-b1f1-cd468f82df72","sponsored":false,"model":"TSX","vin":"JH4CU2F40EC005064","canonical_mmty":"Acura:TSX:2.4:2014","cpo_package":null,"vertical_position":11,"price":"12499","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"118472","photo_count":30,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"2.4","exterior_color":"Graphite Luster Metallic","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Jeff Wyler Acura of Dayton","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45459","year":"2009","sponsored_type":"standard","canonical_mmt":"Acura:TSX:Technology","badges":["fair_deal"],"customer_id":"6051385","listing_id":"538e46ea-d609-4d03-ba78-6cd0246460a6","sponsored":false,"model":"TSX","vin":"JH4CU26649C006144","canonical_mmty":"Acura:TSX:Technology:2009","cpo_package":null,"vertical_position":12,"price":"8995","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"144556","photo_count":30,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology","exterior_color":"Polished Metal Metallic","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Crossroads Car and Truck","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45150","year":"2019","sponsored_type":"standard","canonical_mmt":"Acura:ILX:Premium & A-SPEC Packages","badges":["price_drop_in_cents","fair_deal"],"customer_id":"106823","listing_id":"e436d92d-aa94-41f9-bd24-5c229040d118","sponsored":false,"model":"ILX","vin":"19UDE2F88KA000239","canonical_mmty":"Acura:ILX:Premium & A-SPEC Packages:2019","cpo_package":null,"vertical_position":13,"price":"19795","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"82112","photo_count":55,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Premium & A-SPEC Packages","exterior_color":"Platinum White Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"International Auto Outlet","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45015","year":"2020","sponsored_type":"standard","canonical_mmt":"Acura:ILX:Technology Package","badges":["fair_deal"],"customer_id":"2489415","listing_id":"6e9c296f-8265-428b-a6d7-4fdf1f7078ee","sponsored":false,"model":"ILX","vin":"19UDE2F85LA004119","canonical_mmty":"Acura:ILX:Technology Package:2020","cpo_package":null,"vertical_position":14,"price":"19995","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"81648","photo_count":37,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology Package","exterior_color":"Modern Steel Metallic","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"DecentRide.Com","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45069","year":"2016","sponsored_type":"standard","canonical_mmt":"Acura:ILX:2.4L","badges":["great_deal"],"customer_id":"200601","listing_id":"6abcfb89-d8d1-4506-a4ad-d70a6adf6323","sponsored":false,"model":"ILX","vin":"19UDE2F78GA005942","canonical_mmty":"Acura:ILX:2.4L:2016","cpo_package":null,"vertical_position":15,"price":"8990","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"165340","photo_count":53,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"2.4L","exterior_color":"Crystal Black Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Preferred Autos LLC","stock_type":"Used","certified_preowned":false,"interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"45069","year":"2014","sponsored_type":"standard","canonical_mmt":"Acura:TL:3.5","badges":["good_deal"],"customer_id":"2328582","listing_id":"5e94691b-3df3-4ed4-917c-9be0d0960e02","sponsored":false,"model":"TL","vin":"19UUA8F24EA003721","canonical_mmty":"Acura:TL:3.5:2014","cpo_package":null,"vertical_position":16,"price":"11900","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"120355","photo_count":31,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"3.5","exterior_color":"WHITE","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"DriveSmart Auto Sales of West Chester","stock_type":"Used","certified_preowned":false,"interior_color":null,"fuel_type":"Gasoline","dealer_zip":"45069","year":"2018","sponsored_type":"standard","canonical_mmt":"Acura:TLX:Technology","badges":["price_drop_in_cents","good_deal"],"customer_id":"6049155","listing_id":"f0a2d912-78e7-44b3-942d-18ba40e14bcf","sponsored":false,"model":"TLX","vin":"19UUB1F53JA009504","canonical_mmty":"Acura:TLX:Technology:2018","cpo_package":null,"vertical_position":17,"price":"20499","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"61603","photo_count":21,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology","exterior_color":"Bellanova White Pearl","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"VIP Auto Sales & Service","stock_type":"Used","certified_preowned":false,"interior_color":null,"fuel_type":"Gasoline","dealer_zip":"45005","year":"2015","sponsored_type":"standard","canonical_mmt":"Acura:TLX:V6","badges":["great_deal","hot_car"],"customer_id":"5373075","listing_id":"89323e71-d249-449e-b998-d2cf12b22405","sponsored":false,"model":"TLX","vin":"19UUB2F39FA022625","canonical_mmty":"Acura:TLX:V6:2015","cpo_package":null,"vertical_position":18,"price":"11995","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"123914","photo_count":47,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"V6","exterior_color":"BLACK","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Midwest Automotive Connection","stock_type":"Used","certified_preowned":false,"interior_color":"Other","fuel_type":"Gasoline","dealer_zip":"45240","year":"2015","sponsored_type":"standard","canonical_mmt":"Acura:TLX:V6 Advance","badges":["good_deal"],"customer_id":"5344283","listing_id":"4ea9cb56-2f1d-4526-92b1-c38b91edb7e9","sponsored":false,"model":"TLX","vin":"19UUB2F74FA000275","canonical_mmty":"Acura:TLX:V6 Advance:2015","cpo_package":null,"vertical_position":19,"price":"13998","drivetrain":"Front-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"126959","photo_count":27,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"V6 Advance","exterior_color":"Black","bodystyle":"Sedan","make":"Acura"},{"msrp":"0","stock_sub":"","dealer_name":"Jeff Schmitt Chevrolet North","stock_type":"Used","certified_preowned":false,"interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"45324","year":"2018","sponsored_type":"standard","canonical_mmt":"Acura:TLX:Technology","badges":["good_deal"],"customer_id":"181337","listing_id":"9ea20136-e2ea-46b3-9676-9ff4f87da5c7","sponsored":false,"model":"TLX","vin":"19UUB3F51JA003731","canonical_mmty":"Acura:TLX:Technology:2018","cpo_package":null,"vertical_position":20,"price":"21997","drivetrain":"All-wheel Drive","relevancy_score":null,"cpo_indicator":false,"nvi_program":false,"mileage":"84626","photo_count":34,"seller_type":"dealership","cat":"luxurypassenger_standard","trim":"Technology","exterior_color":"Lunar Silver Metallic","bodystyle":"Sedan","make":"Acura"}]}]