Used Honda coupes for sale in Troy, NY
-





Vehicle Information
- Ext. color
- Taffeta White
- Int. color
- Black/Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 30-39
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 DOHC, variable valve control, regular unleaded, engine wi
- Stock #
- 17204
- VIN
- 2HGFC4B55HH305147
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Michael's Auto PlazaReviews
Michael's Auto Plaza review
Purchasing a vehicle here is a great experience. I’d like to say thank you to Salesman Mike, Eugene the manager and Mike the owner. I’m a repeat customer as this is my 2nd purchase here. They make you feel like family, You guys are great. I would recommend anyone looking for a quality vehicle to go see this team.
2017 Honda Civic review
despite numerous quality & reliability issues ( 2016 thru 2021 ) > many will never be resolved by Honda as Honda accepts no responsibility nor concern about problems > including mechanical & in-vehicle entertainment systems, Honda still retains value.
-
Vehicle Information
- Ext. color
- Blue
- Drivetrain
- Front-wheel Drive
- MPG
- 29-38
- Fuel type
- Regular gasoline
- Transmission
- CVT
- Engine
- 1.8L I-4 i-VTEC variable valve control, regular gasoline, engine
- Stock #
- S26510SA
- VIN
- 2HGFG3B82EH507187
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
Romeo Ford of SaratogaReviews
Romeo Ford of Saratoga review
Purchased a used car I found on-line, the process was quick and easy. Tony was easy to work with had the car all clean and ready to go.
2014 Honda Civic review
Reliability is what I look for in a car. The 2014 Civic lacks some of the electronics in modern cars but that is good. The more stuff in a car the more likely something will go wrong. I had no plans to get another car until an idiot totaled the car.
-





Vehicle Information
- Ext. color
- Platinum White Pearl
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 28-38
- Fuel type
- Gasoline
- Transmission
- Manual
- Engine
- 1.5L I-4 gasoline direct injection, DOHC, variable valve control
- Stock #
- 7956
- VIN
- 2HGFC3A51KH752450
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
Sound Auto WholesalersReviews
Sound Auto Wholesalers review
Purchased a 20202 Hyundai from Mauro A at Sound Auto. He made the deal very seamless for us and was very accommodating to meeting our requests. I highly recommend making your next used car purchase with Sound Auto.
2019 Honda Civic Si review
I just got this 2019 Civic si coupe with beautiful black rims with nice summer tires! Pearl White is the color. Beautiful in the Sun!
-





Vehicle Information
- Ext. color
- Alabaster Silver Metallic
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 25-36
- Fuel type
- Gasoline
- Transmission
- Compact 5-Speed Automatic
- Engine
- 1.8L I-4 i-VTEC variable valve control, regular gasoline, engine
- Stock #
- E36370
- VIN
- 2HGFG12868H546342
Features
- Convenience
- Keyless Entry
- Entertainment
- CD Player
- Exterior
- Alloy Wheels
- Moonroof
Dealer
Lenz Truck - Fond du Lac, WIReviews
Lenz Truck - Fond du Lac, WI review
Had a great time today at lenz truck. Purchased a newer f350. Awesome truck. Emma Tober was my salesperson and she made the whole process so easy! I highly recommend her! Shawn is great with numbers and can get you on the road with financing that makes sense. I would go back for my next vehicle.
2008 Honda Civic review
Bought 2008 with 94k miles on it and have owned it for 2 years (115k on it now). Great value car, great Dave Ramsey car(read the Total Money Makeover), great car value to avoid debt(buy one off a “grandma” (=low miles and not driven hard(it only went to church and the grocery store🤣😂)). I will drive it to 200k or more and my investment accounts will keep on growing!
-
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- Black / Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 30-41
- Fuel type
- Gasoline
- Transmission
- Automatic CVT
- Engine
- 2.0L I4 16V MPFI DOHC
- Stock #
- K5733A
- VIN
- 2HGFC4B04GH311010
Features
- Convenience
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
LeadCar Honda YorkvilleReviews
LeadCar Honda Yorkville review
Yesterday, I took delivery of my 2026 Honda CR-V Hybrid Sport L and couldn’t be happier! 🚙✨ A huge thank you to Tom Cole, Josh Crannell, and Matt Darling—they were nothing short of amazing throughout the entire process. I had already secured financing with my bank (who I’ve purchased 5 vehicles from), but decided last minute to let their finance manager, Matt Darling, take a shot. I’m so glad I did—he got me an APR 2% lower than my bank! 🙌 The best part? I drove away with the exact vehicle I wanted, without giving up a single option, all while staying within my budget. If you’re in the market for a new ride, look no further than LeadCar Honda. They truly made me feel like family. ❤️
2016 Honda Civic review
Jean Paul was great to work with! He sent lots of photos and a video to show us the car before driving to see it! He also had paperwork ready when we got there and waiting on us. It was a very smooth process and the car is wonderful!!!!
-





Vehicle Information
- Ext. color
- Silver
- Drivetrain
- Front-wheel Drive
- MPG
- 21-32
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 3.5L V-6 i-VTEC variable valve control, regular gasoline, engine
- Stock #
- 3404W
- VIN
- 1HGCT2B89DA003404
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
A Better Way WholesaleReviews
A Better Way Wholesale review
Fast and dirty. 20+ salesmen all busy. 800 used cars from auction, none of them have been detailed yet. If you need a car today on a sub $15k budget I would go here and detail it yourself. Good place to buy a first car. Don’t buy a luxury item or anything collectible. The the inventory doesn’t turn super fast so every single car will likely need a rotor resurfacing. They had family guy on the tv which I thought was odd for a dealership. Not really dealership vibes, which is good!
2013 Honda Accord review
yes my car has 2014 miles on it just bought it from the auction the car was dealer kept from day one the car is in mint condition in and out i took it to the dealer and they love the car and said no problems you should get 300.000 miles out of it. it is dark gray color and black .i will be driving 6000 miles a year. so dont let the miles fool you. no oil leaks i have all the service records one owner. i said its in mint condition
-





Vehicle Information
- Ext. color
- White Orchid Pearl
- Int. color
- Ivory
- Drivetrain
- Front-wheel Drive
- MPG
- 22-33
- Fuel type
- Gasoline
- Transmission
- 5-Speed Automatic with Overdrive
- Engine
- 2.4L I-4 DOHC, i-VTEC variable valve control, regular unleaded,
- Stock #
- 19225T
- VIN
- 1HGCS1B83CA016967
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
Route 9 MazdaReviews
Route 9 Mazda review
Jim was so patient and helpful with us as we bounced from dealer to dealer. His forthright and honest approach was the driving factor in our decision to go with Mazda.
2012 Honda Accord review
I agree with most of the ratings except I don't know how it gets a 4.4 for comfort. The driver's seat is terrible. No matter how I tried to adjust it I end up with a sore back.
-





Vehicle Information
- Ext. color
- White
- Drivetrain
- Front-wheel Drive
- MPG
- 26-35
- Fuel type
- Gasoline
- Transmission
- CVT
- Engine
- 2.4L I-4 gasoline direct injection, DOHC, i-VTEC variable valve
- Stock #
- 9515WL
- VIN
- 1HGCT1B79FA009515
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
A Better Way WholesaleReviews
A Better Way Wholesale review
A better way car dealer ship where I bought my Mercedes was so helpful and easy to work with 100% would recommend
2015 Honda Accord review
Bought my 2015 Honda Accord LX used in 2018 with 42K on the odometer. It now has just over 100K and has for most of the past 7 years been a very good vehicle overall, requiring only manufacturer recommended routine maintenance. Within the past year, however, it has needed to have the starter replaced and repair work done on the air conditioning unit. The cost of those repairs totaled about $1,200. Not too bad for over 7 years of regular driving. I'm still really pleased with the performance of the vehicle. Handling, acceleration and braking are truly excellent. I'm most impressed by the gas mileage. On a recent 2,400 mile round-trip from Florida to Pennsylvania the car averaged just over 41 mpg. In local mixed driving it consistently gets between 35-37 mpg. Getting that type of gas mileage with the kind of performance it provides is hard to beat!
-





Vehicle Information
- Ext. color
- Polished Metal Metallic
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 31-40
- Fuel type
- Gasoline
- Transmission
- CVT
- Engine
- 1.5L I-4 direct injection, DOHC, variable valve control, interco
- Stock #
- W52827
- VIN
- 2HGFC3B92HH352827
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
Dealer
Upper Valley HondaReviews
Upper Valley Honda review
Beth has great follow up she got back to me within minutes Great person to represent your company
2017 Honda Civic review
Perfect car to last a long time! Runs very well and is very comfortable. The maintenance is easy and the car is spacious! I love it!
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 39-39
- Fuel type
- Gasoline
- Transmission
- Automatic 5-Speed
- Engine
- 1.8L I4
- Stock #
- A8135
- VIN
- 2HGFG3B80CH504690
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
Dealer
Car CornerReviews
Car Corner review
As a first time buyer and financing I was apprehensive about right step to take in a field so vast. I wanted honesty, guidance, clarity and a vehicle that will meet my needs. At Car Corner I found Rick and he kindly walked me through every step explaining clearly all paperwork and car information and because my time constraints he did it all in a day and out the door I went with my new to me beautiful car, completely inform, happy and with at the bottom line is most important! Peace of mind.
2012 Honda Civic review
Bought my 2012 brand new and 12 years later it still runs great! I have put o er 304,000 miles on it and have had no problems. I have done regular maintenance on the car and it keeps on ticking. The paint is poor condition and weather stripping has deteriorated. The interior has held well! The only thing after 12 years and lots of miles is the CD player is making noises and wearing out. I am going to keep driving until it dies which at this point seems like it might be another 100-200k miles.
-





Vehicle Information
- Ext. color
- White Orchid Pearl
- Int. color
- Beige
- Drivetrain
- Front-wheel Drive
- MPG
- 26-36
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.4L I-4 direct injection, DOHC, i-VTEC variable valve control,
- Stock #
- 018214
- VIN
- 1HGCT1B34DA018214
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Bloomfield MotorsReviews
Bloomfield Motors review
Courteous, friendly, clean show room. The application process was very smooth and simple. Very trustworthy.
2013 Honda Accord review
Bought my 2013 Accord EX-L used in 2021 and I love my car. Incredible gas mileage, a sunroof, an excellent factory stereo system, and smooth, zero to sixty in about eight seconds acceleration. Corners like a dream. Heated leather seats. Roomy backseat for the Pibble and a generous trunk. Very little cabin noise. I have total confidence that if I maintain scheduled maintenance on this car, and I will, it'll last me for another hundred thousand miles. I honestly think that the 9th generation Honda Accord was one of the best years for this car.
-





Vehicle Information
- Ext. color
- Lunar Silver Metallic
- Int. color
- Black/Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 30-39
- Fuel type
- Regular gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 DOHC, variable valve control, regular gasoline, engine wi
- Stock #
- 309917
- VIN
- 2HGFC4B09HH309917
Features
- Convenience
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Bloomfield MotorsReviews
Bloomfield Motors review
Highly recommend ! They know what they are doing Hasan Ferhat Hakan thank you guys I purchased 4 cars from them and they always so helpful
2017 Honda Civic review
I recently purchased a new Honda Civic, and it has been an amazing experience so far. The car drives very smoothly, handles well on both highways and city roads, and gives excellent gas mileage. The interior is comfortable and modern, with plenty of space and great visibility. I especially love the reliability that Honda is known for and the advanced safety features that make me feel confident while driving. It’s the perfect balance of style, comfort, and performance I highly recommend it to anyone looking for a dependable and efficient car.
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 33-33
- Fuel type
- Gasoline
- Transmission
- Automatic 5-Speed
- Engine
- 2.4L I4 190hp 162ft. lbs.
- Stock #
- A88157
- VIN
- 1HGCS1B87CA009195
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
Car CornerReviews
Car Corner review
This place is great. I just drive the car. I fell in love with the car and I took the car off the lawn. They’re amazing.Go see Alexa and frank
2012 Honda Accord review
My Honda Accord is going to be one of my favorite cars. It is very reliable and spacious. Ever since I purchased it it never gave me problems.
-





Vehicle Information
- Ext. color
- Energy Green Pearl
- Int. color
- Black / Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 31-41
- Fuel type
- Gasoline
- Transmission
- Automatic CVT
- Engine
- 1.5L I4 16V GDI DOHC Turbo
- Stock #
- 95502761
- VIN
- 2HGFC3B34GH356226
Features
- Convenience
- Keyless Start
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
ARide Auto Sales LLCReviews
ARide Auto Sales LLC review
I highly recommend this dealership the team were super helpful when it came to financing a car i got my 2014 honda crv from there and it was very nice
2016 Honda Civic review
2016 civic transmission failure! Thought it may be covered by warranty, but no! Loss of this cost too much and disappointment to say the least!!!
-





Vehicle Information
- Ext. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 29-38
- Fuel type
- Gasoline
- Transmission
- Automatic CVT
- Engine
- 1.8L I4 16V MPFI SOHC
- Stock #
- 5598
- VIN
- 2HGFG3B87EH513180
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Smart Buy Auto Sales of MeridenReviews
Smart Buy Auto Sales of Meriden review
Dylan was friendly and professional and upfront with out-the-door pricing. My daughter's car died and was unfixable. We needed something affordable and quick. Dylan showed us a number of great cars and let us test drive everything we wanted. My daughter loves her choice. Dylan made it happen and was awesome to work with. And he made sure that everything was checked twice before we left with a new car. Thank you so much!
2014 Honda Civic review
Civic LX sedan.Small car that is extremely reliable and handles like a sports car. Stereo is average. Seats are a little stiff. Low to the ground makes it a little hard to get in and out. Rides great, handles even better. 118,000 miles without an issue. 36 mpg combined every day. Dont care for CVT transmission, feels slightly sluggish but will get the job done.
-





Vehicle Information
- Ext. color
- Modern Steel Metallic
- Drivetrain
- Front-wheel Drive
- MPG
- 30-41
- Fuel type
- Regular gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 DOHC, i-VTEC VCM variable valve control, regular gasoline
- Stock #
- 306420
- VIN
- 2HGFC4B54GH306420
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
A-1 Auto Sales, LLCReviews
A-1 Auto Sales, LLC review
Great customer service, bought a 12 altima running perfectly, i recommend a-1 auto sale
2016 Honda Civic review
Bought this as a commuter. I get way about the EPA estimate for MPG. I average 45mpg across a tank of gas. I have the 2.0L model. So easy to do maintenance on and just works. I bought it as a lease turn-in when it was 3 years old and had 34k miles on it. I have 138k on the odometer now. In that entire time, I have replaced a single item that was not part of regular maintenance - some fuel sensor that the dealer replaced because of a light on the dash and was around $150 to diagnose and fix. Otherwise just the basic stuff - oil, brakes, spark plugs, wipers, etc. There has been one common fault that if you look at these reviews long enough you will see. An A/C problem was common on this generation. There is a factory recall on it. Both mine, and my brothers 2017 model had it done at no charge. Other than that my only grips on this car are minor crap like a select few button placement choices or the oddness that the driver can't operate all windows with the window lock engaged - usually that is bypassed only for the driver. So shy of some very small things, I would buy another one of these in a heartbeat.
-
About Honda
What is the cheapest Honda vehicle available?
The Honda Element is the cheapest available vehicle by average Cars.com listing price in Honda's lineup, with an average listing price of $9,934.
Which Honda vehicle has the best MPG?
The hybrid Honda Insight can reach up to 55 MPG city and 49 MPG highway for a combined rating of 52 MPG. The Honda Civic with traditional internal combustion engine offers up to 32 MPG city and 41 MPG highway for a combined rating of 36 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
Which Honda vehicle has the longest range?
The electric Honda Prologue can travel up to 308 miles on a single charge depending on electric motor and battery options. The Honda Clarity Plug-In Hybrid can travel up to 48 electric-only miles before the gas engine kicks on.
EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.
Which Honda vehicle has the most deals?
The Honda CR-V has the most available deals on Cars.com with 2280 great deals out of 13201 listings starting at $947.
Where can I find the most Honda deals?
The most Honda deals can be found near Albany, NY with 1 great deals out of 3 listings starting at $14,672.