Used Jeep convertibles for sale near Porter, NY
-





$28,275
Est. $521/mo Basil Ford of Niagara Falls
Check Availability Vehicle Information
- Ext. color
- Black Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- Intercooled Turbo Gas/Electric I-4 2.0 L/122
- Stock #
- NFP5181
- VIN
- 1C4JJXP62PW683363
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
Dealer
Basil Ford of Niagara FallsReviews
Basil Ford of Niagara Falls review
Tim O’Shea was extremely polite and easy to work with. A wonderful young man. No pressure
2023 Jeep Wrangler 4xe review
The Jeep dealerships don't do body work on the vehicles. It has to be farmed out to a body shop....and this is across the board, not just this state.
-





Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 19-24
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- Gas/Electric V-6 3.6 L/220
- Stock #
- 18802
- VIN
- 1C4JJXFG5PW624737
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
Deluxe Auto SalesReviews
Deluxe Auto Sales review
My salesman Greg was honest, very helpfull in vehicle information and the sale of my Durango. I would Highly Reccommend this auto sales Company, and would buy from again
2023 Jeep Wrangler review
Fun vehicle! Great as a daily driver or for off roading. Very reliable. Sky One Touch roof is amazing, one push of a button and the whole roof opens up.
-





$22,431
Est. $413/mo Zeigler Honda of Racine
Check Availability Vehicle Information
- Ext. color
- Sting-Gray Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 20-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Intercooled Turbo Premium Gasoline I-4 2.0 L/122
- Stock #
- P13776A
- VIN
- 1C4HJXDN0MW566449
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- HomeLink
- Satellite Radio
- USB Port
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Zeigler Honda of RacineReviews
Zeigler Honda of Racine review
First time service customer. Steven was welcoming and engaging. Let me know about the GTRs in the drive. Would definitely recommend.
2021 Jeep Wrangler review
I purchased my 2021 Wrangler 2 door 80th Anniversary Edition new and I ordered it just the way I wanted it. I couldn't be happier with it I get 27-30 mpg with the 2.0 turbo engine! It's amazing how much power it has . Fantastic Jeep. I have had it for over 5 years with no problems
-
-




Vehicle Information
- Ext. color
- Black Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Regular Gasoline V-6 3.6 L/220
- Stock #
- 17951
- VIN
- 1C4PJXEG5TW246621
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
Dealer
Alexander NissanReviews
Alexander Nissan review
Alexander Nissan - Micah D. was very knowledgeable about the vehicles I was interested in, accessible both in person and by phone and extremely personable; excellent young salesman. Purchased a 2026 Murano.
2026 Jeep Wrangler review
Bought a new Willys model 2 door. Got nearly 10k off at Brandon Tomes in McKinney. Best Jeep I’ve had so far, and I’ve owned quite a few, dating back to the eighties. Mine has the 2.0 turbo and the 8 speed automatic, and it is surprisingly quick. A bit of turbo lag, but it comes in early at about 3k rpm, and the torque is fantastic. Seems like a lotta folks still want the inline six, but after owning two, those engines are dogs. Also had two V6 models, a JK and JT, and this engine outperforms both. With proper maintenance, should last a good while, but we’ll see. The 8 speed has a great reputation, as does the Rubicon spec suspension. Overall, happy with this Jeep, would recommend.
-





Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- Intercooled Turbo Gas/Electric I-4 2.0 L/122
- Stock #
- 17790
- VIN
- 1C4JJXN60PW623049
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
Dealer
Alexander NissanReviews
Alexander Nissan review
Had a great experience buying a new car. Got exactly what we wanted. Tre was fantastic!
2023 Jeep Wrangler 4xe review
Approaching 25,000 miles and we haven’t had any issues. I actually enjoy choosing whether to run on electric or gas based on what my journey is. If you just put it in hybrid mode, you’re not utilizing the efficiency of the engine. My advice, think about your journey. If I’m jumping on the highway to then head into the city, I run it on gas on the highway then switch to all electric in the city -no point wasting the electric with highway driving! Then I use up the last of my electric when google tells me I’m X miles from home when I still have X miles of electric remaining to use it all up. When we just do local drives less than 25 miles (grocery, day care pick up etc.) we can literally run off electric only for days, even weeks. It just takes thinking about what your journey involves. Crawling traffic for a 5 mile slow down ahead, I’m on gas until I hit that traffic, then switch to electric. We’ve taken this Jeep (Willys) through plenty of winter storms with feet of snow and ice, never needed to use chains with its AWD or 4WD to choose from. Hopefully the great reliability continues.
-





Not Priced
Est. $0/mo Blaise Alexander GMC of Hazleton
Check Availability Vehicle Information
- Ext. color
- Granite Crystal Metallic Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Regular Unleaded V-6 3.6 L/220
- Stock #
- ZGU1536A
- VIN
- 1C4HJXEG8JW208530
Features
- Convenience
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
Blaise Alexander GMC of HazletonReviews
Blaise Alexander GMC of Hazleton review
Everyone my wife and I met there were very helpful and friendly. No pushy salespeople like other places. Will be going back for services and when we are ready for another new vehicle
2018 Jeep Wrangler Unlimited review
This is the best Jeep Wrangler model ever made. The past YJ, TJ, JK models are great, but this Jeep JL 2018 Wrangler Sahara Automatic V6 is the best one yet. The comfort and modern amenities are top of the line. The 8” infotainment head unit and Alpine sound system is out of this world. The interior fits my family of four and has enough cargo space for a stroller, scooter, Onewheel XR and beach chairs. The exterior needs no introduction with its iconic round headlights and seven slot grill. Followed by a three piece removable top, which I managed to take off and put back on by myself. FYI, don’t try doing this by yourself. My final favorite thing about my Jeep JL is the ability to customize the Jeep with all of the amazing aftermarket parts and pieces. This allows you to take the best looking car on the road and make it your own.
-
About Jeep
What is the cheapest Jeep vehicle available?
The Jeep Liberty is the cheapest available vehicle by average Cars.com listing price in Jeep's lineup, with an average listing price of $5,874.
Which Jeep vehicle has the best MPG?
The hybrid Jeep Cherokee can reach up to 39 MPG city and 35 MPG highway for a combined rating of 37 MPG. The Jeep Renegade with traditional internal combustion engine offers up to 24 MPG city and 32 MPG highway for a combined rating of 27 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
Which Jeep vehicle has the longest range?
The electric Jeep Wagoneer S can travel up to 300 miles on a single charge depending on electric motor and battery options. The plug-in hybrid Jeep Grand Cherokee 4xe can travel up to 26 electric-only miles before the gas engine kicks on.
EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.
Which Jeep vehicle has the most deals?
The Jeep Grand Cherokee has the most available deals on Cars.com with 4317 great deals out of 14353 listings starting at $1,200.