-
12V power outlets 2 12V power outlets
-
2.5L GDI MPI DOHC 16-Valve I4 Engine
-
3-point seatbelt Rear seat center 3-point seatbelt
-
4WD type Automatic full-time AWD
-
ABS Brakes (4-Wheel)
-
ABS Brakes 4-wheel antilock (ABS) brakes
-
ABS Brakes Four channel ABS brakes
-
Accessory power Retained accessory power
-
Adaptive cruise control Smart Cruise Control with Stop & Go (SCC)
-
Adjustable Rear Headrests
-
Air Conditioning - Air Filtration
-
Air Conditioning - Front
-
Air Conditioning - Front - Single Zone
-
Air conditioning Yes
-
Airbags - Front - Dual
-
Airbags - Front - Side
-
Airbags - Front - Side Curtain
-
Airbags - Passenger - Occupant Sensing Deactivation
-
Airbags - Rear - Side Curtain
-
All-in-one key All-in-one remote fob and ignition key
-
Alternator Type Alternator
-
Android Auto
-
Antenna Integrated roof audio antenna
-
Apple CarPlay
-
Armrests - Rear Center
-
Armrests front center Front seat center armrest
-
Armrests rear Rear seat center armrest
-
Audio - Antenna: Diversity
-
Audio - Antenna: Mast
-
Audio Auxiliary Input: IPod/IPhone Integration
-
Audio Auxiliary Input: Jack
-
Audio Auxiliary Input: USB
-
Auto door locks Auto-locking doors
-
Auto headlights Auto on/off headlight control
-
Auto high-beam headlights High Beam Assist (HBA) auto high-beam headlights
-
Auto-Lock
-
Automatic brake hold
-
Autonomous cruise control Lane Following Assist (LFA) hands-on cruise contro…
-
Basic warranty 60 month/60,000 miles (FLT)
-
Battery charge warning
-
Battery run down protection
-
Battery type Lead acid battery
-
Beverage holders Front beverage holders
-
Beverage holders rear Rear beverage holders
-
Blind Spot Sensor
-
Blind spot Blind-Spot Collision-Avoidance Assist (BCA) active blind spot sys…
-
Body Side Moldings Body-Color
-
Body panels Fully galvanized steel body panels with side impact beams
-
Bodyside cladding Black bodyside cladding
-
Bodyside insert Chrome bodyside insert
-
Brake assist system
-
Brake type 4-wheel disc brakes
-
Braking Assist
-
Braking assist hill start assist
-
Bumper insert Black front and metal-look rear bumper inserts
-
Bumper rub strip front Metal-look front bumper rub strip
-
Bumper rub strip rear Black rear bumper rub strip
-
Bumpers front Body-colored front bumper
-
Bumpers rear Body-colored rear bumper
-
Cabin air filter
-
Cargo Area 12V Power Outlet
-
Cargo Area Light
-
Cargo access Power cargo area access release
-
Cargo floor type Carpet cargo area floor
-
Cargo light Cargo area light
-
Cargo tie downs Cargo area tie downs
-
Center Console Front Console With Armrest And Storage
-
Child Safety Locks
-
Child Seat Anchors LATCH System
-
Child door locks Manual rear child safety door locks
-
Climate control Manual climate control
-
Clock
-
Clock Digital clock
-
Concealed cargo storage Cargo area concealed storage
-
Console insert material Metal-look console insert
-
Corrosion perforation warranty 84 month/unlimited
-
Cross Traffic Alert Rear
-
Cruise Control Adaptive
-
Cruise control Cruise control with steering wheel mounted controls
-
Crumple Zones Front
-
Cylinder head material Aluminum cylinder head
-
Day/Night rearview mirror
-
Daytime Running Lights LED
-
Delay off headlights Delay-off headlights
-
Digital Odometer
-
Door ajar warning Rear cargo area ajar warning
-
Door bins front Driver and passenger door bins
-
Door bins rear Rear door bins
-
Door handle material Chrome door handles
-
Door locks Power door locks with 2 stage unlocking
-
Door mirror style Body-colored door mirrors
-
Door mirror type Standard style side mirrors
-
Door mirrors Power door mirrors
-
Door panel insert Metal-look door panel insert
-
Door trim insert Cloth door trim insert
-
Doors Liftgate Window: Fixed
-
Doors Rear Door Type: Liftgate
-
Drive type HTRAC all-wheel drive
-
Driver Attention Alert System
-
Driver Seat Adjustable Lumbar Support: Power
-
Driver Seat Heated
-
Driver Seat Power Adjustments: 8
-
Driver Seat Power Adjustments: Recline
-
Driver attention monitor Driver Attention Warning (DAW)
-
Driver foot rest
-
Driver information center
-
Driver lumbar Driver seat with 2-way power lumbar
-
Driver seat direction Driver seat with 8-way directional controls
-
Driver selectable steering effort Drive Mode Select driver selectable steeri…
-
Drivetrain 4WD Type: On Demand
-
Drivetrain Drive Mode Selector
-
Drivetrain selectable Drive Mode Select driver selectable drivetrain mode
-
Electronic Brakeforce Distribution
-
Electronic Messaging Assistance With Read Function
-
Electronic Messaging Assistance With Voice Recognition
-
Electronic Parking Brake Auto Off
-
Electronic parking brake
-
Electronic stability control Electronic stability control system
-
Emergency SOS Capable Vehicle integrated emergency SOS system
-
Emissions LEV3-ULEV70 emissions
-
Emissions tiers Tier 3 Bin 70 emissions
-
Engine Auto Stop/Start
-
Engine Cylinders Smartstream I4
-
Engine Location Front mounted engine
-
Engine Mounting direction Transverse mounted engine
-
Engine Push-Button Start
-
Engine Smartstream 2.5L I-4 port/direct injection, DOHC, CVVT variable valve…
-
Engine block material Aluminum engine block
-
Engine temperature warning
-
Engine/electric motor temperature gauge
-
Exit warning Safe Exit Assist (SEA) external exit warning system
-
Exterior Mirrors Heated
-
Exterior Mirrors Integrated Turn Signals
-
Exterior Mirrors Manual Folding
-
Exterior Mirrors Power
-
External Temperature Display
-
External memory External memory control
-
First-row windows Power first-row windows
-
Floor console Full floor console
-
Floor console storage Covered floor console storage
-
Floor coverage Full floor coverage
-
Floor covering Full carpet floor covering
-
Fob engine controls Smart key with hands-free access and push button start
-
Folding door mirrors Manual folding door mirrors
-
Folding rear seats 60-40 folding rear seats
-
Fore and aft rear seat Rear seats with manual fore and aft
-
Forward collision warning Forward Collision-Avoidance Assist (FCA) w/Pedestr…
-
Front 12V Power Outlet(s)
-
Front Headrests Adjustable
-
Front Seatbelts: 3-Point
-
Front Suspension Classification: Independent
-
Front Suspension Type: Macpherson Struts
-
Front anti-roll Front anti-roll bar
-
Front head restraint control Manual front seat head restraint control
-
Front head restraints Height and tilt adjustable front seat head restraints
-
Front impact airbag driver Driver front impact airbag
-
Front impact airbag passenger Passenger front impact airbag
-
Front reading lights
-
Front seat upholstery YES Essentials premium cloth front seat upholstery
-
Front seatback upholstery Plastic front seatback upholstery
-
Front side impact airbag driver Seat mounted side impact driver airbag
-
Front side impact airbag passenger Seat mounted side impact front passenger …
-
Fuel Economy Display MPG
-
Fuel Economy Display Range
-
Fuel Type Regular Unleaded
-
Fuel door Manual fuel door release
-
Gauge cluster display size (inches) Gauge cluster display size: 4.20
-
Gearshifter material Metal-look gear shifter material
-
Glove box Standard glove box
-
Grille style Chrome grille
-
Handsfree Bluetooth handsfree wireless device connectivity
-
Headlight type Reflector headlights
-
Headlights Auto Delay Off
-
Headlights Auto On/Off
-
Headlights Automatic High Beam Dimmer
-
Headlights LED
-
Headlights LED low and high beam headlights
-
Headliner coverage Full headliner coverage
-
Headliner material Cloth headliner material
-
Heated door mirrors Heated driver and passenger side door mirrors
-
Heated front seats Heated driver and front passenger seats
-
Height adjustable seatbelts Front height adjustable seatbelts
-
High mount stop light High mounted center stop light
-
Hill Descent Control
-
Hill control Downhill Brake Control (DBC)
-
Hill start assist Hill Assist Control (HAC)
-
Ignition Spark ignition system
-
Illuminated entry
-
Illuminated ignition switch
-
Immobilizer
-
Impact Sensor Door Unlock
-
Inside Rearview Mirror Manual Day/Night
-
Instrumentation display Analog instrumentation display
-
Interior Metallic-Tone Accents
-
Interior accents Metal-look interior accents
-
Interior courtesy lights Fade interior courtesy lights
-
Internet access Selective service internet access
-
Key in vehicle warning
-
Keyfob cargo controls Keyfob trunk control
-
Keyfob keyless entry
-
Keyfob remote start
-
Laminated window Laminated side window glass
-
Lane Deviation Sensors
-
Lane Keeping Assist
-
Lane departure Lane Keep Assist (LKA)
-
Lock-up transmission
-
Locking hub control Permanent locking hub control
-
Low level warnings Low level warning for fuel, washer fluid and brake fluid
-
Low tire pressure warning Tire specific low air pressure warning
-
Maintenance warranty 36 month/36,000 miles
-
Manual passenger seat controls Passenger seat manual reclining and fore/aft …
-
Mirror Color Body-Color
-
Mobile app access
-
Multi-Function Display
-
Multiple headlights Multiple enclosed headlights
-
Number Of Front Headrests 2
-
Number Of Rear Headrests 3
-
Number of airbags 6 airbags
-
Number of beverage holders 8 beverage holders
-
Number of doors 4 doors
-
Number of first-row screens 2 total number of 1st row displays
-
Occupancy sensor Airbag occupancy sensor
-
Oil pressure warning
-
One-Touch Windows: 2
-
One-touch down window Driver and passenger one-touch down windows
-
One-touch up window Driver and passenger one-touch up windows
-
Over the air updates
-
Overdrive transmission
-
Overhead airbags Curtain first and second-row overhead airbags
-
Overhead console Mini overhead console
-
Overhead console storage
-
Paint Metallic paint
-
Panel insert Metal-look instrument panel insert
-
Passenger Seat Heated
-
Passenger Seat Manual Adjustments: 4
-
Passenger Seat Manual Adjustments: Recline
-
Passenger doors rear left Conventional left rear passenger door
-
Passenger doors rear right Conventional right rear passenger door
-
Passenger seat direction Front passenger seat with 4-way directional control…
-
Pedestrian detection Pedestrian impact prevention
-
Perimeter approach lighting Remote activated perimeter approach lighting
-
Power Brakes
-
Power Door Locks Anti-Lockout Feature
-
Power Steering Speed-Proportional
-
Power Windows: With Safety Reverse
-
Power driver seat controls Driver seat power reclining, lumbar support, cush…
-
Powertrain type ICE
-
Powertrain warranty 120 month/100,000 miles
-
Pre-Collision Warning System Audible Warning
-
Pre-Collision Warning System Visual Warning
-
Primary display size 8 inch primary display
-
Primary display touchscreen Primary monitor touchscreen
-
Radiator
-
Radio AM/FM/digital/SiriusXMsatellite
-
Reading Lights Front
-
Rear Bumper Color Body-Color
-
Rear Seats 60-40 Split Bench
-
Rear Seats Center Armrest: With Cupholders
-
Rear Seats Rear Heat: Vents
-
Rear Seats Reclining
-
Rear Spoiler Roofline Spoiler
-
Rear Springs Regular grade rear springs
-
Rear anti-roll Rear anti-roll bar
-
Rear camera Rear mounted camera
-
Rear cargo door Liftgate rear cargo door
-
Rear collision warning Rear Cross-Traffic Collision-Avoidance Assist (RCCA)
-
Rear console climate control ducts
-
Rear head restraint control 3 rear seat head restraints
-
Rear head restraint control Manual rear seat head restraint control
-
Rear head restraints Height adjustable rear seat head restraints
-
Rear seat check warning Rear Occupant Alert (ROA) rear seat check warning
-
Rear seat direction Front facing rear seat
-
Rear seat folding position Fold forward rear seatback
-
Rear seat upholstery YES Essentials premium cloth rear seat upholstery
-
Rear seatback upholstery Carpet rear seatback upholstery
-
Rear seats Split-bench rear seat
-
Rear seats fixed or removable Fixed rear seats
-
Rear under seat ducts Rear under seat climate control ducts
-
Rear window defroster
-
Rear windshield Fixed rear windshield
-
Rear windshield wipers
-
Reclining rear seats Manual reclining rear seats
-
Remote Engine Start
-
Remote panic alarm
-
Roadside warranty 60 month/unlimited
-
Roof Rails Silver
-
Roof rails
-
Running lights LED daytime running lights
-
SAE Autonomy Level 2 - partial automation SAE Autonomy
-
Satellite trial 3 month satellite trial subscription
-
Seatback storage pockets 1 seatback storage pocket
-
Seatbelt pretensioners Front seatbelt pretensioners
-
Seatbelt pretensioners number 2 seatbelt pre-tensioners
-
Seatbelts Emergency Locking Retractors: Front
-
Seatbelts Emergency Locking Retractors: Front And Rear
-
Seatbelts Seatbelt Force Limiters: Front
-
Seatbelts Seatbelt Pretensioners: Front
-
Seatbelts Seatbelt Warning Sensor: Driver And Passenger
-
Seatbelts Second Row 3-Point
-
Seating capacity 5
-
Seats - Driver Seat Power Adjustments: Height
-
Seats Front Seat Type: Bucket
-
Second-row windows Power second-row windows
-
Security Anti-Theft Alarm System
-
Security Engine Immobilizer
-
Security system
-
Seek scan
-
Selectable mode transmission Drive Mode Select selectable mode transmission
-
Sequential shift control SHIFTRONIC Sequential shift with steering wheel con…
-
Service interval warning Service interval indicator
-
Shock absorbers Gas-pressurized shock absorbers
-
Skid Plate(s) Front
-
Skid Plate(s) Front And Rear
-
Smart device integration Apple CarPlay & Android Auto smart device wireless …
-
Smart device remote start
-
Spare tire Compact spare tire with steel wheel
-
Spare tire location Crank-down spare tire
-
Speakers Standard grade speakers
-
Speakers number 6 speakers
-
Special paint Monotone paint
-
Speed sensitive steering Speed sensitive power steering
-
Speed sensitive volume
-
Split front seats Bucket front seats
-
Spoiler Rear lip spoiler
-
Springs front Front coil springs
-
Springs rear Rear coil springs
-
Stability Control
-
Start-stop engine Auto stop-start engine
-
Steering Electric power-assist steering system
-
Steering Wheel Mounted Controls Audio
-
Steering Wheel Mounted Controls Cruise Controls
-
Steering Wheel Mounted Controls Multi-Function Screen Controls
-
Steering Wheel Mounted Controls Phone
-
Steering Wheel Mounted Controls Voice Recognition Controls
-
Steering Wheel Tilt And Telescopic
-
Steering mounted audio control Steering wheel mounted audio controls
-
Steering type Rack-pinion steering
-
Steering wheel material Urethane steering wheel
-
Steering wheel telescopic Manual telescopic steering wheel
-
Steering wheel tilt Manual tilting steering wheel
-
Sun visor strip
-
Suspension Stabilizer Bar(s): Front
-
Suspension Stabilizer Bar(s): Rear
-
Suspension Standard ride suspension
-
Suspension ride type front Independent front suspension
-
Suspension ride type rear Independent rear suspension
-
Suspension type front Strut front suspension
-
Suspension type rear Multi-link rear suspension
-
Tachometer
-
Tailgate control Tailgate/power door lock
-
Tailpipe Stainless steel single exhaust with chrome tailpipe finisher
-
Temperature display Exterior temperature display
-
Third-row windows Fixed third-row windows
-
Tinted windows Deep tinted windows
-
Tires P235/60TR18 AS BSW front and rear tires
-
Towing And Hauling Trailer Wiring: 4-Pin
-
Towing trailer sway Trailer sway control
-
Towing wiring harness Trailer wiring harness
-
Traction Control
-
Traction Control With Trailer Stability Assist
-
Traction control All-speed ABS and driveline traction control
-
Transfer case Electronic transfer case shift
-
Transmission 8-speed automatic
-
Transmission Type Automatic
-
Transmission electronic control
-
Trip Odometer
-
Trip computer
-
Trip odometer
-
Trunk lid trim Plastic trunk lid trim
-
Turn signal in door mirrors Turn signal indicator in door mirrors
-
Turn-by-turn nav Blue Link Guidance (3-year subscription) turn-by-turn navig…
-
USB ports 4 USB ports
-
Valet key
-
Vanity Mirrors Dual Illuminating
-
Variable intake manifold
-
Variable panel light Variable instrument panel light
-
Vehicle tracker Blue Link vehicle tracker with vehicle slowdown
-
Ventilated brakes Front ventilated disc brakes
-
Visor driver expandable coverage Driver visor with expandable coverage
-
Visor driver mirror Driver visor mirror
-
Visor illuminated driver mirror Illuminated driver visor mirror
-
Visor illuminated passenger mirror Illuminated passenger visor mirror
-
Visor passenger expandable coverage Passenger visor with expandable coverage…
-
Visor passenger mirror Passenger visor mirror
-
Voice activated audio Voice activated audio controls
-
Warnings And Reminders Low Fuel Level
-
Warnings And Reminders Maintenance Reminder
-
Wheel well trim Black wheel well trim
-
Wheels 18 x 7.5-inch front and rear machined w/painted accents aluminum whee…
-
Window Trim Chrome side window trim
-
Windows Front Wipers: Variable Intermittent
-
Windows Laminated Glass: Acoustic
-
Windows Lockout Button
-
Windows Privacy Glass
-
Windows Rear Defogger
-
Windows Rear Wiper With Washer
-
Windows Rear Wiper: Intermittent
-
Windows Solar-Tinted Glass: Front
-
Wipers Variable intermittent front windshield wipers
-
Wireless device charging Front wireless smart device charging
-
Wireless streaming Bluetooth wireless audio streaming