Hybrid cars for sale near Desert View Highlands, CA
-
-





$30,001
MSRP $29,484
Est. $572/mo Toyota of Lancaster
Check Availability Vehicle Information
- Ext. color
- Celestite
- Int. color
- Black/Red
- Drivetrain
- Front-wheel Drive
- MPG
- 50-43
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 1.8L I-4 DOHC, VVT-i variable valve control, regular gasoline, e
- Stock #
- 184062
- VIN
- JTDBCMFE0V3175168
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
Toyota of Lancaster -





$48,960
MSRP $47,620
Est. $933/mo Kia of Valencia
Check Availability Vehicle Information
- Ext. color
- Ice
- Int. color
- Off Black
- Drivetrain
- Front-wheel Drive
- MPG
- 34-32
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 1.6L I4 16V GDI DOHC Turbo Hybrid
- Stock #
- 4127
- VIN
- KNDNC5KA3V6230653
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Kia of Valencia -





$57,430
MSRP $56,090
Est. $1,094/mo Kia of Valencia
Check Availability Vehicle Information
- Ext. color
- Blue
- Int. color
- Off Black
- Drivetrain
- Front-wheel Drive
- MPG
- 34-32
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 1.6L I4 16V GDI DOHC Turbo Hybrid
- Stock #
- 4144
- VIN
- KNDNE5KA1V6204580
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Kia of Valencia -





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Kyalami Orange
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 4.4L V8 32V GDI DOHC Twin Turbo Hybrid
- Stock #
- VCY93493
- VIN
- WBS83GV04VCY93493
Features
- Convenience
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMW -





$32,727
MSRP $32,605
Est. $624/mo AutoNation Ford Valencia
Check Availability Vehicle Information
- Ext. color
- Oxford White
- Int. color
- Navy Pier
- Drivetrain
- Front-wheel Drive
- MPG
- 42-35
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 2.5L I4 16V MPFI DOHC Hybrid
- Stock #
- TRB74021
- VIN
- 3FTTW8H32TRB74021
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
Dealer
AutoNation Ford ValenciaReviews
AutoNation Ford Valencia review
I am very thankful for the salesman and the service manager who worked with me. Richard and the service manager went above and beyond my expectations. I?ve bought several ford F-150?s from you guys and I want hesitate to come back. Thank you to the whole team at Magic Ford in Valencia Ca for your service and impeccable professionalism. I will definitely tell my friends and family to go there for good service. Thank you again from a loyal customer.
2026 Ford Maverick review
I'm getting 42 mpg! Super impressive hybrid engineering and tech! I feel in control of the responsive hybrid system (activating electric mode with pedal modulation). I've towed a trailer with a quad and an oven, plenty of power. Payload capacity is WAY higher than expected. Acceleration is peppy and the transmission feels dialed in and reliable. Move over Toyota, there's a new hybrid king in town! Seriously, I can't think of a more versatile vehicle than this little truck... it can do it all, with comfort, style, and affordability. The only thing that could be improved is: I'd like to see the battery percentage of the 1.1kWh pack.
-





Vehicle Information
- Ext. color
- Manhattan Green Metallic
- Int. color
- Coffee
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- T9539926
- VIN
- 5UX43EU09T9539926
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
Valencia BMW review
Bought a 2026 Black G70 Prestige AWD and it is FANTASTIC... Jose sold me the car and he did a fantastic job. We made arrangements and he dropped off the car at my residence. Great JOB! Great Dealership and will definitely buy more from then in the future.
2026 BMW X5 PHEV review
I traded in my 2023 X5 45e and a 2026 X5 50e. I loved the 2023 and thought I would keep it longer but my local dealer had a 2026 loaner X5 that they were selling at a big discount. It has the more improved Driver Professional Pro package, a $2500 option which includes a self driving option on the interstates. The 50e had many issues in its first model year that BMW has fixed for the 2026 model the last year before the major redesign in 2027. The battery is warranty is now 100000 miles rather than the 80000 on the 45e. The Driver Professional Pro usually is only on the M model upgrades which didn’t want so this fix the bill for a timely replacement before the major redesign in 2027.
-
-





$43,120
MSRP $45,515
Est. $822/mo AutoNation Ford Valencia
Check Availability Vehicle Information
- Ext. color
- Space Silver
- Int. color
- Ebony
- Drivetrain
- Front-wheel Drive
- Fuel type
- Hybrid
- Transmission
- Automatic CVT
- Engine
- 2.5L I4 16V MPFI DOHC Hybrid
- Stock #
- SUA70484
- VIN
- 1FMCU0E18SUA70484
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
AutoNation Ford ValenciaReviews
AutoNation Ford Valencia review
I had an outstanding experience working with Austin, the Sales Manager, Peter, and the entire team. I was searching for a very specific Ford Raptor in a particular color, and although they didn’t have exactly what I wanted in stock, they never tried to steer me toward something else. Instead, Austin went above and beyond to locate the exact truck I was looking for at one of their sister dealerships. What impressed me most was their dedication to customer service. Peter was absolutely fantastic—he personally drove over two hours to pick up the truck and made sure everything was completed the very same day. Anyone who has shopped for a Raptor knows how difficult these trucks can be to find, especially when you’re looking for a specific color and configuration. The entire process was smooth, stress-free, and professional from start to finish. They listened to what I wanted, respected my preferences, and worked hard to make it happen. It’s refreshing to work with a dealership that genuinely puts the customer first instead of simply trying to sell what’s available on the lot. Thank you again to Austin, Peter, and the entire team for going above and beyond. I couldn’t be happier with my new Raptor and the overall buying experience. I highly recommend them to anyone looking for a vehicle and exceptional customer service!
2025 Ford Escape review
Overall the car is great. I bought the trailer towing model and the towing features work seamlessly with my light trailer. It has the power to easily pull the 2000 pound trailer I use. There are a couple fit and finish issues where the hood doesn't quite line up with the fender, but I am fussy about these things and other people might not even notice. I have the larger infotainment screen which has some positives. But almost all the controls go through the screen and my eyesight isn't the best so it is difficult to make selections while the vehicle is in motion. Also, the learning curve is rather steep and the paper owners manual is not much help. The A/C controls are all on the screen and hard to change while in motion.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- TCY16089
- VIN
- WBA43EH08TCY16089
Features
- Convenience
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMW -





$41,956
MSRP $43,155
Est. $799/mo Mazda Of Valencia
Check Availability Vehicle Information
- Ext. color
- Polymetal Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 39-37
- Fuel type
- Hybrid
- Transmission
- 0-Speed E
- Engine
- 2.5L I4 16V PDI DOHC Hybrid
- Stock #
- 770
- VIN
- 7MMVAAEW5TN165930
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Mazda Of ValenciaReviews
2026 Mazda CX-50 Hybrid review
I have owned two Mazdas in the past so I thought I would look at a third. I wanted a hybrid this time, so knowing that Mazda hasn't really gotten into the hybrid game I was skeptical with the CX50 hybrid. I did alot of online, and magazine article research on this vehicle as well as others. There are a number of options out there, but what sold me on the CX50 is that 1) The other Mazdas I have owned were extremely reliable, 2} The CX50 has the same fourth (I believe it's the fourth) generation Toyota 2.5 liter hybrid engine and e-cvt transmission that was used in the RAV 4 which is highly rated and 3) Mazda just knows how to make a extremely engaging fun to drive vehicle than most. As most vehicles go, this one isn't perfect. I have noticed the road noise is worse than the CX5 I used to have. It's not terrible by any means, just more noticable. I know there are tires out there that are quieter but that's not something I'm willing to do until it's time to replace them. The other thing is I hate the cupholders being in the front, in front of the gear shift. The only other thing (and I've heard people say if you have been a Mazda owner it's annoying to what you're used to, if you've been a Toyota owner it sound normal) and that is the engine drone sound at higher needed speed like entering a highway or passing someone. All of these are things I can live with and I have absolutely have no regrets with this purchase. Bottom line, if you want the interior and exterior quality and engaging driving experience that Mazda gives you and an extremely proven reliable hybrid engine that Toyota gives you...you have the perfect marriage.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Sakhir Orange
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 4.4L V8 32V GDI DOHC Twin Turbo Hybrid
- Stock #
- T9531860
- VIN
- 5YM33CS04T9531860
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
Valencia BMW review
Excellent experience getting my X5 50e lease. Everything was seamless and straightforward, there weren’t any gotchas and I was pleased throughout. I got a lease from them for an X5 50e, and I’ve already been recommending them to friends and family for their BMW needs. I’ll also be back to talk to them when my lease is up for another vehicle.
2026 BMW XM review
Amazing SUV, very quick and comfortable, commanding seating position with great support very easy to drive. I had a 2021 M5 competition and was always scratching the front lower bumper don’t have that problem anymore, 23 inch wheels make the driving position high with less stress on a freeway able to see far ahead instead of a back of the car in front of me. this SUV is very quick and comfortable fully loaded with high tech features and very easy to drive and park, if you are looking for exclusive suv that very few people own this is it , X5 M competition looks like any other X5, the XM very similar performance with distinctive look and dealers offer deep discounts so price of X5M is the the same as XM In this price range gas consumption should not be a concern but with mentioned in the edrive mode I get 33 miles a gallon on the freeway and city without sacrificing the performance, sapphire black with black exterior is amazing and electric only drive mode is great for short trips I only gases up once a month for $43 as the SUV only used about 1/2 tank of gas.if you looking for a family SUV with M sports manners this is the best , you will love it I guarantee it!
-





Vehicle Information
- Ext. color
- Mediterranean Blue Metallic
- Int. color
- Canberra Beige
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo Hybrid
- Stock #
- KB399069
- VIN
- WBAJA9C59KB399069
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
2019 BMW 530e review
109,000 miles on my 2019 BMW 530e and it drives like the day I bought it. Original brakes, 2 sets of new performance tires since purchased new. Keep it services precisely to timeliness at the dealership, where service department provides a loaner. Favorite car of 13 lifetime purchases (which is why we still have it).
-





Vehicle Information
- Ext. color
- Snow White Pearl
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 38-38
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 1.6L I4 16V GDI DOHC Turbo Hybrid
- Stock #
- P7097315
- VIN
- KNDPUCAG0P7097315
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
Dealer
AutoNation Ford ValenciaReviews
AutoNation Ford Valencia review
Great is a classic, analog auto-wah and envelope filter produced in the USA from 1998 to 2007. Known for its mint-green casing an
2023 Kia Sportage Hybrid review
Great redesign. Much roomier interior. I have the gas hybrid and gas mileage is great. The only complaint I have is the middle console. The material used scratches easily and shows fingerprints as well.
-
-





Vehicle Information
- Ext. color
- Fusion Orange
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 35-36
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 1.6L I4 16V DIRECT INJECTION DOHC Turbo Hybrid
- Stock #
- T7272480
- VIN
- KNDPUDDG9T7272480
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
Dealer
Valencia BMWReviews
2026 Kia Sportage Hybrid review
I`ve only had the Kia Sportage EX AWD hybrid for 3 weeks previously owning a 2023 Toyota Rav4 XLE (gas) that seemed bullet proof even after 30K miles. Looking to upgrade to a new hybrid vehicle I was thoroughly impressed with my Kia test drive . The Kia Sportage is so smooth and quiet with strong acceleration and comes with an automatic transmission instead of a CVT. I had studied all the reviews available and concluded that this was among the top compact SUV hybrids .
-





$25,300
Est. $482/mo AutoNation Chrysler Dodge Jeep Ram Valencia
Check Availability Vehicle Information
- Ext. color
- Wind Chill Pearl/Midnight Black Metallic
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 44-47
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 2.5L I-4 port/direct injection, DOHC, VVT-iE/VVT-i variable valv
- Stock #
- NU038203
- VIN
- 4T1K31AK2NU038203
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
AutoNation Chrysler Dodge Jeep Ram ValenciaReviews
AutoNation Chrysler Dodge Jeep Ram Valencia review
Very straightforward sales team. Not too much of go around. Finance team was pushing to sell extended warranty a few times yet in friendly mood
2022 Toyota Camry review
Overall, I think the Camry Nightshade is a great car if you want something reliable, stylish and comfortable for daily driving. The blacked-out wheels and trim give the car a sleek and sporty look that makes it different from a regular Camry. The car rides smooth and comfortable and does very well on the highway. It's spacious and the seats are comfortable.
-





$42,192
MSRP $43,450
Est. $804/mo Mazda Of Valencia
Check Availability Vehicle Information
- Ext. color
- Soul Red Crystal Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 39-37
- Fuel type
- Hybrid
- Transmission
- 0-Speed E
- Engine
- 2.5L I4 16V PDI DOHC Hybrid
- Stock #
- 946
- VIN
- 7MMVAAEW2TN170678
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Mazda Of ValenciaReviews
2026 Mazda CX-50 Hybrid review
So far no problems with this vehicle other than the plastic side trim piece on the door is starting to come off. That I’m sure is an easy fix. Everything works perfectly the new and improved Bluetooth connectivity is nice, the heated seats work fine and no problem with the panoramic moon roof.
-





$20,678
Est. $394/mo AutoNation Chrysler Dodge Jeep Ram Valencia
Check Availability Vehicle Information
- Ext. color
- Brilliant Black Crystal Pearlcoat
- Int. color
- Black/Alloy/Black
- Drivetrain
- Front-wheel Drive
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, variable valve control, regular gasolin
- Stock #
- NR207501
- VIN
- 2C4RC1L70NR207501
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
AutoNation Chrysler Dodge Jeep Ram ValenciaReviews
AutoNation Chrysler Dodge Jeep Ram Valencia review
Very friendly and very, very helpful. I will recommend to others to go to do Dodge in Valencia I love my ram 2027
-





Vehicle Information
- Ext. color
- Mineral White Metallic
- Int. color
- Tartufo
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- T9319850
- VIN
- 5UX43EU09T9319850
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
2026 BMW X5 PHEV review
We leased a 2026 BMW X5 xDrive50e on 3/31/2026. There were at least a dozen on the dealer lot and we were able to find one with exactly the packages and colors we wanted. We got an excellent deal and, including our 6-year-old paid-off trade-in, left with a monthly payment of less than $300. The car is beautiful, manhattan green with cognac interior. This is our first PHEV, so we started with the included level 1 charger and then installed a level 2 charger (Emporia Classic) in our garage as quickly as possible. For our typical around-town use we've been able to drive almost entirely in EV mode. The EV mileage gauge starts off at 50 miles and, given recent mild weather, appears to be accurate. The interior displays are quite usable. We particularly appreciate the heads-up driver display, which shows speed, speed limit, and even driving directions. The most common operations are still associated with knobs and buttons, with interior temperature settings relegated to the central LCD but visible by default. The main LCD is a touch screen and the BMW iDrive puck is particularly helpful for changing settings. The depth of settings and options is immense. Fortunately an expert at the dealer set up all the basics before we left. We're still experimenting with various features such as automatic locking and interior lighting, but we can find our way around. The ride is softer than a previous (~2015) X5 we had, which is actually nice. The car can be raised and lowered. You can drive in EV, hybrid, or sport mode. So far we've kept it in EV and the performance is plenty good. It still has the tight handling we expect of a BMW. If you punch the gas, the engine fires up and the car really takes off (483 hp). We had a bad experience with run-flat tires in the previous X5 and switched to regular tires plus a spare kept under the back storage area. That is no longer an option because that space is now taken by batteries. We hope we won't have similar tire trouble in this car. With our three-year lease and bumper-to-bumper plus maintenance coverage over the entire period, we will have minimal worries about anything going wrong.
-





Vehicle Information
- Ext. color
- Mineral White Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- TCV96418
- VIN
- WBA43EH06TCV96418
Features
- Convenience
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
Valencia BMW review
Dealing with Taylor is great. She is very attentive and helpful and most of all she?s on top of everything. I would recommend Valencia BMW to my friends.
-





Vehicle Information
- Ext. color
- Carbonized Gray Metallic
- Int. color
- Ebony
- Drivetrain
- Front-wheel Drive
- MPG
- 27-34
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 2.5L I4 16V MPFI DOHC Hybrid
- Stock #
- SUB29400
- VIN
- 1FMCU0MZXSUB29400
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
AutoNation Ford ValenciaReviews
AutoNation Ford Valencia review
Service Advisor Greg Speer at Ford in Valencia was excellent in taking care of my Mustang Bullitt. I appreciate his desire to handle my vehicle service needs.
2025 Ford Escape review
Love my escape hybrid would be perfect for a couple that loves to go exploring. Best ever and love when we test drove it.. yay
-





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- VCY36980
- VIN
- WBA13FK0XVCY36980
Features
- Convenience
- Automatic Parking
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMW -





Vehicle Information
- Ext. color
- Mineral Blue
- Int. color
- Charcoal
- Drivetrain
- Front-wheel Drive
- MPG
- 53-45
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic with Auto-Shift
- Engine
- 1.6L I4 16V GDI DOHC Hybrid
- Stock #
- 5721P
- VIN
- KNDCT3LEXP5048311
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Kia of ValenciaReviews
2023 Kia Niro review
This is my first kia. The fit and trim are solid. The car is sound all around. Great gas mileage between 46 in the very cold winter to 67 mpg. Depending on how you drive it. I.ve been dealing with a dealer in burlington massachusetts where I purchase the vehicle. Im not sure they pay attention to detail as the engine calls for a special motor oil, 0W16, And that was not reflected on the engine oil change receipt. When I approached them with a question about the Motor oil, i was told all the engines are the same, which is not true. Also they recommended a 4wheel alignment which i paid for but had problems down the road. The dealer was very unhappy when they had to Repeat the alignment again, and made sure I knew about it. At this time I am searching for another dealer.
-





Vehicle Information
- Ext. color
- Urban Gray Pearl
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 43-36
- Fuel type
- Hybrid
- Transmission
- Automatic CVT
- Engine
- 2.0L I4 16V GDI DOHC Hybrid
- Stock #
- RE033359
- VIN
- 7FARS5H85RE033359
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- Satellite Radio
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
Valencia BMW review
Ibraheem was very helpful and honest with us about our son's car. Our son is away serving in the US Navy and we needed some advice on his 1997 BMW while he's away. His BMW was given a through inspection and we were advised on what was in need of repair. They also took care of the recall on our vehicle. Thank you Ibraheem.
2024 Honda CR-V Hybrid review
We purchased a 2024 hybrid sport touring last July 2023. We had been driving a BMW X3 prior to this car. So far I really enjoy the vehicle. It is not a BMW in terms of handling and engine performance. The upside is hopefully it will not cost as much to keep on the road as the BMW. Also gas mileage is pretty amazing for a large vehicle like this. Most of the time we average around 40 miles per gallon around town and 35 or so as long as we're not driving 75 plus miles per hour. The Bose stereo system is great, better than the BMW in my opinion. Even though the sunroof is not panoramic we didn't open the BMW sunroof because if it broke replacing or fixing it would have been three plus thousand dollars!
-





Vehicle Information
- Ext. color
- Dark Graphite Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo Hybrid
- Stock #
- TCW13782
- VIN
- WBA13FK02TCW13782
Features
- Convenience
- Automatic Parking
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Valencia BMWReviews
Valencia BMW review
They were very nice polite and gave me whatever I needed. The process was very fast and they put my old car and gave me a good credit. Very prompt, professional, and nice.
-





$51,145
MSRP $49,055
Est. $974/mo Kia of Valencia
Check Availability Vehicle Information
- Ext. color
- Metal
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 2.5L I4 16V GDI DOHC Turbo Hybrid
- Stock #
- 2847DT
- VIN
- 5XYPC5SA1VG046625
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Third Row Seating
Dealer
Kia of Valencia -





Vehicle Information
- Ext. color
- Designo Magno Alanite Grey Matte
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 19-25
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 3.5L V-6 DOHC, variable valve control, premium unleaded, engine
- Stock #
- AFN2133
- VIN
- WDDNG9FB0BA384069
Features
- Convenience
- Cooled Seats
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- CD Player
- DVD Player
- HomeLink
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Autofest IncReviews
2011 Mercedes-Benz S-Class review
this has been and still is my dream car ( bought it in 2020) and i am going to keep this beauty forever, the night vision, all glass moon roof, massage seats, hot & cold, park assit, huge back seats, wood steering wheel, air rise or sport mode air bags, i have a hitch and used to pull 2 fast motorcycles like nothing, the power, i have drove it to Mexico about 20 times maybe more, Vegas, LA and never felt ANY kind of discomfort! i bet i can drive to NY and be way more comfy than an airplain! if you are thinking of getting this beautiful car DO NOT HESITATE! you wont want another.
-





Vehicle Information
- Ext. color
- White
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 53-50
- Fuel type
- Hybrid
- Transmission
- Automatic CVT
- Engine
- 2.5L I4 16V PDI DOHC Hybrid
- Stock #
- C8473R
- VIN
- 4T1DAACK4SU504401
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
Rydell Chrysler Dodge Jeep RamReviews
Rydell Chrysler Dodge Jeep Ram review
KYLE MCDUFFIE Was amazing. Give that man a raise. He was kind, professional, knew everything and yet he was calm. Explained everything. We all need a Kyle in every dealership across the globe. Thank you Kyle. My family loves you.
2025 Toyota Camry review
Excellent gas mileage! The 2025 Toyota Camry LE model is a very smooth ride. Sporty get up and go and very agile. The driver's seat is difficult to find the best comfort for long drives. Storage space is minimal, but I found add-ons that were a perfect fit. Bottom line.... a car you can trust that pays itself off at the pump!
-





$11,992
Est. $228/mo Karplus Warehouse Inc.
Check Availability Vehicle Information
- Ext. color
- Obsidian
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 43-40
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 1.8L I-4 DOHC, variable valve control, regular gasoline, engine
- Stock #
- M160506F
- VIN
- JTHKD5BHXD2160506
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- CD Player
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
Karplus Warehouse Inc.Reviews
Karplus Warehouse Inc. review
Thank you Karplus for giving us a chance to close this deal. Juan Acevedo was awesome! He was very patient, calm, and understanding. Please look for him if you need help getting your next car. Thanks Juan!!! And thanks to the manager too who was sweet and helpful- Elizabeth😃
2013 Lexus CT 200h review
Once over 100K mi. Replace the Hybrid battery! This car os like the ones of old. Good for about 100K mi or 10 yrs. Then get rid of it.... inherent design flaws rear their ugly heads and start denying you of a paycheck! Hybrid battery failure, CVT failure, head gasket failure. Hybrid drive link failure and and and and!
-





$75,622
Est. $1,441/mo Porsche Santa Clarita
Check Availability Vehicle Information
- Ext. color
- CHALK
- Int. color
- STANDARD INTERIOR BLACK
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 3L V-6 direct injection, DOHC, VarioCam Plus variable valve cont
- Stock #
- SCP2007
- VIN
- WP1BE2AY4PDA28069
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
Dealer
Porsche Santa ClaritaReviews
Porsche Santa Clarita review
My electric Taycan was completely discharged as I got home at midnight and even the 12volt battery was dead because the car had no power i was partially on my driveway but my charging cable did not reach. Had ro leave it like that overnight. I contacted Santa Clarita service dept in the morning and told.them of my situation. The technician. I spoke with was completely helpful and rght away told me that the foreman could come out and assess the situation. Brian called me in 20 minutes that he was on his way. He jumped started the car so he could access the trunk and power the 12v battery and open the charge port. He ran a diagnosis and then pulled out an extension cable so I could charge. I am so gratefully and thankful for the excellent customer service skills of the service department. What a life saver.
2023 Porsche Cayenne review
One of the top 3 best SUVs in the market by far, only rivaled by RR and Bentley. The quality is flawless; it drives like a car but with the comfort of a luxury SUV. Best of both worlds. I have a 911 and I am shocked how fantastic is the driving experience of the Cayenne
-





$60,837
MSRP $61,465
Est. $1,159/mo Diamond Hyundai Palmdale
Check Availability Vehicle Information
- Ext. color
- Ecotronic Gray Pearl
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 29-31
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- Theta III 2.5L I-4 direct injection, DOHC, variable valve contro
- Stock #
- 6NU116240
- VIN
- KM8RMESA3VU116240
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Diamond Hyundai PalmdaleReviews
Diamond Hyundai Palmdale review
The staff at the Hyundai store was very helpful. The manager James Gonzalez was very upfront and did not give us the round around. Thank you
-





Vehicle Information
- Ext. color
- White
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-24
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- PowerBoost Full-Hybrid V6 3.5 L
- Stock #
- DB40275
- VIN
- 1FTFW1CD0NFB40275
Features
- Convenience
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Karplus Warehouse Inc.Reviews
2022 Ford F-150 review
My experience with Ford F1 50s is that they have gotten better with time. I’ve owned three now and my latest 2022. I’ve had zero performance issues. None of the electrical problems like somebody put in a review no transmission no engine problems nothing. It’s a 3.5 L V6 eco-boost and it has the best passing power of any vehicle I’ve ever owned. It can also toll anything in the backup cameras and all the front and above cameras are absolutely essential and work great. Most of all it has had a couple of recalls they’ve taken a bit of time, but I don’t care if they recalls. I’m not paying for them. None of them have been major things all have been fixed. Undoubtedly this is the most comfortable vehicle I’ve ever driven. It’s quiet it rides like a comfort sedan and it has a large enough gas tank to get me a couple of states. The hard roll up Ford cover is much less expensive than some aftermarket types. It’s not floppy. It’s solid and easy to use. This baby has been in the field. I’ve hunted and harvested a half a dozen deer with this beast out in the middle of nowhere of North Dakota. It’s completely reliable.
-





$58,625
MSRP $58,108
Est. $1,117/mo Toyota of Lancaster
Check Availability Vehicle Information
- Ext. color
- Wind Chill Pearl
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 36-32
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 2.5L I-4 port/direct injection, DOHC, VVT-iE/VVT-i variable valv
- Stock #
- 183655
- VIN
- 5TDACAB53TS119124
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Toyota of LancasterReviews
Toyota of Lancaster review
Great Service! Great Deals! Friendly staff who helped me with the purchase of my new Toyota Camry. I take my car there for service. It's close by and see the specials the website.
2026 Toyota Grand Highlander Hybrid review
Only have 500 miles on it so far. So far I am completely satisfied. The ride is good and there is plenty of room for my golf clubs.
-





$144,108
Est. $2,746/mo Land Rover Jaguar Van Nuys
Check Availability Vehicle Information
- Ext. color
- WHITE
- Int. color
- Black AMG Exclusive Nappa Leather
- Drivetrain
- All-wheel Drive
- Fuel type
- Plug-In Hybrid
- Transmission
- auto
- Engine
- AMG 4L V-8 gasoline direct injection, DOHC, variable valve contr
- Stock #
- LR260477A
- VIN
- W1K6G8CB0RA299987
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Land Rover Jaguar Van NuysReviews
Land Rover Jaguar Van Nuys review
Excellent service sales person jin cho wonderful services high recommendation very helpful with everything left happy services
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 6-Speed Automatic
- Engine
- 1.5L I3 12V GDI DOHC Turbo Hybrid
- Stock #
- 12741
- VIN
- WBY2Z2C56GV674778
Features
- Convenience
- Keyless Entry
- Navigation System
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
Pro MotorcarsReviews
Pro Motorcars review
Had a great experience with Pro Motorcars purchasing my Lamborghini Urus. The whole process was smooth, easy, and professional from start to finish. The team was helpful, knowledgeable, and made buying such a special vehicle a great experience. I would definitely recommend Pro Motorcars to anyone looking for a quality vehicle.
2016 BMW i8 review
This car brought me nothing but Joy, love this car every single moment. It's unique, one of a kind! never will be produced again so this has become a collector's item, super excited about what the future has to bring for this car! i8 Owners lets keep the legacy alive.
Hybrid cars by city
-
Hybrid cars in Palmdale, CA
22 Great Deals out of 496 listings starting at $5,980
-
Hybrid cars in Quartz Hill, CA
22 Great Deals out of 494 listings starting at $5,980
-
Hybrid cars in Acton, CA
86 Great Deals out of 2002 listings starting at $4,400
-
Hybrid cars in Lancaster, CA
17 Great Deals out of 452 listings starting at $7,995
-
Hybrid cars in Leona Valley, CA
31 Great Deals out of 561 listings starting at $5,980
-
Hybrid cars in Littlerock, CA
23 Great Deals out of 444 listings starting at $5,500
-
Hybrid cars in Agua Dulce, CA
70 Great Deals out of 1760 listings starting at $5,073
-
Hybrid cars in Sun Village, CA
22 Great Deals out of 356 listings starting at $5,500
-
Hybrid cars in Elizabeth Lake, CA
21 Great Deals out of 492 listings starting at $5,980
-
Hybrid cars in Lake Los Angeles, CA
10 Great Deals out of 229 listings starting at $13,458
-
Hybrid cars in Lake Hughes, CA
19 Great Deals out of 465 listings starting at $7,500
-
Hybrid cars in Rosamond, CA
8 Great Deals out of 189 listings starting at $7,995