Used SUVs for sale near Lucedale, MS under $15,000
-




$14,914
Est. $272/mo Walt Massey Chevrolet GMC Lucedale
Check Availability Vehicle Information
- Ext. color
- Sunset Orange
- Int. color
- Gray / Black
- Drivetrain
- Front-wheel Drive
- MPG
- 27-33
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.0L I4 16V MPFI DOHC
- Stock #
- LG72426T
- VIN
- KM8K22AA0LU572426
Features
- Convenience
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Walt Massey Chevrolet GMC LucedaleReviews
Walt Massey Chevrolet GMC Lucedale review
I have a pretty long history with Walt Massey. Purchased the Corvette from them. And Robbie and Jessica keep my C8 in pristine running order. Wouldn't think about taking it anywhere else.
2020 Hyundai KONA review
I love my Kona, easy to get in and out of, runs great, great on gas. The only problem is the spoiler is plastic and the paint has faded. I think it is a flaw in the paint job. The paint is out of warranty but Hyundai is going to take a look at it and see if they can help in any way.
-




$14,914
Est. $272/mo Walt Massey Chevrolet GMC Lucedale
Check Availability Vehicle Information
- Ext. color
- Sunset Orange
- Int. color
- Gray / Black
- Drivetrain
- Front-wheel Drive
- MPG
- 27-33
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.0L I4 16V MPFI DOHC
- Stock #
- LG72426T
- VIN
- KM8K22AA0LU572426
Features
- Convenience
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Walt Massey Chevrolet GMC LucedaleReviews
Walt Massey Chevrolet GMC Lucedale review
I have a pretty long history with Walt Massey. Purchased the Corvette from them. And Robbie and Jessica keep my C8 in pristine running order. Wouldn't think about taking it anywhere else.
2020 Hyundai KONA review
I love my Kona, easy to get in and out of, runs great, great on gas. The only problem is the spoiler is plastic and the paint has faded. I think it is a flaw in the paint job. The paint is out of warranty but Hyundai is going to take a look at it and see if they can help in any way.
-





$12,077
Est. $220/mo Ross Downing Chrysler Dodge Ram of Mobile
Check Availability Vehicle Information
- Ext. color
- White Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 22-30
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 2.4L I4
- Stock #
- 5-1391
- VIN
- 3C4NJDDB3JT314171
Features
- Convenience
- Keyless Entry
- Remote Start
- Entertainment
- Apple CarPlay®
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
Dealer
Ross Downing Chrysler Dodge Ram of MobileReviews
2018 Jeep Compass review
I,ve had several Jeeps and Subarus and Chevys and my Compass Latitude 4x4 is as good as any for around the city and my freeway trips. Better than the Subaru for the highway and offroad. I feel safe. posted this as i feel some people are harsh and wrong about Jeeps. Do the required oil and transmission services as requested.
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- Charcoal
- Drivetrain
- Front-wheel Drive
- MPG
- 23-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.0L I-4 16V DOHC Turbo
- Stock #
- E95079
- VIN
- WMZYT3C52K3E95079
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carfinders Auto OutletReviews
Carfinders Auto Outlet review
Luv this place good service and was helped to find the car that I needed
2019 MINI Countryman review
Phoenix (my mini) is sporty when needed, eco friendly when needed Or a dynamic blend most of the time. This car is perfect. Love him!
-





Vehicle Information
- Ext. color
- White
- Int. color
- Beige
- Drivetrain
- All-wheel Drive
- MPG
- 21-26
- Fuel type
- Gasoline
- Transmission
- A/T
- Engine
- 164.0HP 2.0L 4 Cylinder Engine Gasoline Fuel
- VIN
- KM8J23A40HU598608
Features
- Entertainment
- Bluetooth®
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
Reviews
2017 Hyundai TUCSON review
Just purchased as a daily driver for work. Had it two months with 104,000 miles. Looks and drives great. Base model but I’m pleased with its features. I agree not a lot of power but purchase it as a work vehicle to garage my nicer vehicle.
-





Vehicle Information
- Ext. color
- WHITE
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 22-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Engine, 2.4L DOHC 4-cylinder SIDI (Spark Ignition Direct Injecti
- Stock #
- 259659
- VIN
- 2GNALDEK3D1259659
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Carfinders Auto OutletReviews
Carfinders Auto Outlet review
Randy Wilson was ready for us when we arrived. We had called and given what we were looking for and how much we could spend. The SUV our grandson picked was pristine and very well maintained mechanically. What a great experience! Of course we had been to multiple places first to show our grandson what was out there in his price range. Carfinders were way above and beyond what we had looked at for days. They were well worth the drive from Biloxi!
2013 Chevrolet Equinox review
I owned this car for 10 years (2013 purchased in 2012). Spent less than $3k in repairs over those 10 years. With regular oil changes and good tires reached 135k miles comfortably and quietly. Buying a new Equinox looking forward to another 10+ years
-
-





Vehicle Information
- Ext. color
- White
- Int. color
- Tan
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Engine, 5.3L EcoTec3 V8 with Active Fuel Management, Direct Inje
- Stock #
- 182893
- VIN
- 1GNSCBKC9FR182893
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- Rear Seat Entertainment
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Carfinders Auto OutletReviews
Carfinders Auto Outlet review
The car buying process was very smooth and easy. All of our questions were answered and I couldn't be happier with my Murano. Randy is the best!! I would definitely recommend them to anyone looking for a vehicle.
2015 Chevrolet Tahoe review
Bought my 2015 Tahoe new, 124,000 miles later no major problems with normal maintenance. Annoying interior lights flicker when brakes depressed, replaced front ball joints. Overall great truck, car must have built on a Wednsday.
-





Vehicle Information
- Ext. color
- Molten Silver
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 25-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 1.6L I-4 gasoline direct injection, DOHC, D-CVVT variable valve
- Stock #
- 314613
- VIN
- KM8J33A25HU314613
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rear Cross Traffic Alert
- Stability Control
Dealer
SKCO AutomotiveReviews
2017 Hyundai TUCSON review
Only issue i have is my turbo blew at 60k miles good thing its under warranty. Other than that this car is nice to drive.
-





Vehicle Information
- Ext. color
- Vice White
- Int. color
- Lt Frost Beige/Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Tigershark MultiAir 2.4L I-4 DOHC, VVT variable valve control, r
- Stock #
- 275933
- VIN
- 3C4PDCAB4LT275933
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Third Row Seating
Dealer
SKCO AutomotiveReviews
2020 Dodge Journey review
This is my 2nd Journey and I was so happy with the 2014 that when I upgraded, I decided to get another one. I've only had this for a month but have been very happy with it so far.
-





$14,995
Est. $274/mo Carfinders Auto Outlet
Check Availability Vehicle Information
- Ext. color
- BLACK
- Int. color
- Gray
- Drivetrain
- Rear-wheel Drive
- MPG
- 12-19
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- ENGINE: 5.6L DOHC 32V ENDURANCE V8 W/FFV
- Stock #
- 621390
- VIN
- 5N1BA0ND7FN621390
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- DVD Player
- HomeLink
- Rear Seat Entertainment
- Satellite Radio
- Exterior
- Alloy Wheels
- Roof Rack
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Carfinders Auto OutletReviews
Carfinders Auto Outlet review
These guys know how to run a used car lot. Their cars are immaculate well maintained mechanically a pleasure to look at a pleasure to drive. I visited a dozen different car lot in the mobile area. The majority of the cars were junk. They might look good on the outside, but it looks like a family a homeless people had been living on the inside for years. These gentlemen understand what people are looking for and work with you to find the right financing and the right vehicle. They also had a great warranty program that I added to my purchase gives me great peace of mind. I bought a 2020 Jeep gladiator that was under blue book and in great mechanical and physical shape. I’d buy another car from these guys in a heartbeat well done gentlemen.
2015 Nissan Armada review
I travel for my job with a 10×6 enclosed trailer and have put many miles on this beautiful beast. Its taken my family camping on the beach, picked up family members and luggage at the airport. It has power and speed when needed with lots of comfort! At 115,000 miles(50,000 when I bought in 2019) and proper maintenance, im confident I can double that milage!
-





Vehicle Information
- Ext. color
- White
- Int. color
- Sand Beige
- Drivetrain
- All-wheel Drive
- MPG
- 22-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- Y25359
- VIN
- WBAVL1C50FVY25359
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
Dealer
SKCO AutomotiveReviews
2015 BMW X1 review
I've had three 2015 X1's. Drove the wheels off one, one got stolen and on my third. Love this car! So economical and the gps is off satellite, not cell tower. Get maps ANYWHERE, for life. I only have 72k on it and will be my last vehicle.
-





Vehicle Information
- Ext. color
- Redline 2 Coat Pearl
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Tigershark MultiAir 2.4L I-4 DOHC, variable valve control, regul
- Stock #
- 273001
- VIN
- 3C4PDCAB4JT273001
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- CD Player
- USB Port
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Third Row Seating
Dealer
SKCO AutomotiveReviews
2018 Dodge Journey review
Very reliable. Great mpg and overall performance. Interior is comfortable with plenty of storage room. Love this car. I would not hesitate to buy another Journey.
-
-





Vehicle Information
- Ext. color
- White
- Int. color
- Cream
- Drivetrain
- Front-wheel Drive
- MPG
- 21-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.0L I4 EcoBoost -inc: Twin scroll
- Stock #
- B96017
- VIN
- 2FMPK3K94GBB96017
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carfinders Auto OutletReviews
Carfinders Auto Outlet review
Great People, Salesman Randy and Manager Ryan were the best. I would have purchased the Jeep with 3 wheels after dealing we them two.Will do Business again
2016 Ford Edge review
The 2.7L Ecoboost engine in the Sport model is phenomenal. Powerful, smooth and reliable. I love the adaptive cruise control, air-conditioned front seats, panoramic sunroof, and power lift gate but its the engine that makes this stand out from the competition. I own 2 of these Sport models now.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- Orange
- Drivetrain
- All-wheel Drive
- MPG
- 21-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- H0W77322
- VIN
- 5UXWX9C34H0W77322
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Albert Lincoln AutomotiveReviews
Albert Lincoln Automotive review
Great dealer! Easy transaction! I will be back in the future for my next car
2017 BMW X3 review
STAR AUTO MALL: Worst car dealer EVER! I bought a 2017 BMW X3. They never checked the car! I had problems immediately! I called, emailed & texted... Star Auto Mall would NOT return my calls, texts or emails! I went to BMW dealer, and they found lots of issues! Wires hanging down, tires rubbing, etc. It cost me $480 to fix it! I billed Star Auto Mall, and it looks like they're just chucking me the finger!! AVOID these incompetent thieves! Here's links to my issues with the car they sold me! https://thebassplayer.com/BMW-Bill.pdf https://thebassplayer.com/BMW-1.mp4 If I don't get a check by the end of the month, a lawyer friend told me it's a slam dunk in small claims count.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- Canberra Beige
- Drivetrain
- Rear-wheel Drive
- MPG
- 19-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3L I-6 gasoline direct injection, DOHC, variable valve control,
- Stock #
- H37422
- VIN
- 5UXKR2C50F0H37422
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
SKCO AutomotiveReviews
SKCO Automotive review
I’d like to thank Mr Gavin Williams for doing such an awesome job working with my daughter and my daughter in law, getting them both into vehicles. My family loves and appreciates SCKO Automotive for taking care of them.
2015 BMW X5 review
I’ve owned two 2015 X5D’s - daily driven for 7 years for a combined 173,000 miles (sales job), I averaged 29MPG on each tank in mixed driving (38+mpg on hwy using renewable diesel in CA), and it’s been so much more reliable than any gas car I’ve owned… The only car that compares in reliability is two BMW 328 diesels I’ve owned - I’m not going back to gas cars. I may consider Cayenne diesel as the only other alternative daily driver, otherwise I’ll stay with X5 diesels.
-





Vehicle Information
- Ext. color
- Silver Ice Metallic
- Int. color
- Dark Ash/Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 15-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V-8 direct injection, variable valve control, regul
- Stock #
- KR100423
- VIN
- 1GNSCBKCXKR100423
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Memory Seat
- Third Row Seating
Dealer
Albert Lincoln AutomotiveReviews
Albert Lincoln Automotive review
Al was really nice. He made us very comfortable which. The vehicle was waiting & running when we arrived at the dealership. It was exactly as pictures showed and it did not disappoint.
2019 Chevrolet Tahoe review
Great vehicle. I would buy another one in a heartbeat. It rides good and has great performance with the 6.2 engine!! For an SUV, it is very quiet.
-





Vehicle Information
- Ext. color
- Shadow Black
- Int. color
- Medium Light Camel
- Drivetrain
- Front-wheel Drive
- MPG
- 17-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.5L V-6 DOHC, variable valve control, regular unleaded, engine
- Stock #
- B51950
- VIN
- 1FM5K7B82GGB51950
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Third Row Seating
Dealer
SKCO AutomotiveReviews
SKCO Automotive review
For anyone shopping around for a new or used vehicle I definitely recommend SKCO Automotive. They have a brand new facility, the greatest and most respectful salesmen I've ever met. The managers there try their hardest to make sure they get you the best rates and best deal to fit your wants and needs. They have highly trained mechanics to help with any mechanical problems you might need, and the service department will make sure everything is done quickly and properly. Don't even get me started on their detail department, wow, that's the only word that comes to mind when I think of how clean and detailed my car was when I purchased it. When you come to SKCO Automotive your greeted by a wonderful team of experts whose sole purpose is to have you leave in the vehicle you wanted and happy that you chose their establishment. My family has been buying vehicles from SKCO for many years and we'll always come back. It's great to be able to come back and see the same people that continue to help you each time. Thank you everyone at SKCO.
2016 Ford Explorer review
2016 Platinum. Nice SUV, comfortable, very powerful, decent fuel economy, fair build quality, but there are some things to be aware of; the AWD models have a PTU (power transfer unit) which sends power to the rear wheels. It is positioned very close to the exhaust, and the heat generated by the turbochargers literally cooks the gear oil in the PTU, causing it to fail. The unit only holds about a quart of oil, and is NOT serviced or checked, even when you have the vehicle serviced at the dealer. We had trouble with the front camera, and the recirculation actuator on the climate control. If you are considering a used Explorer, I highly recommend buying the best warranty you can! The only complaint I have is the road noise. On new pavement, it's quiet, but on all other roads it's VERY loud inside!
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 23-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- L11233
- VIN
- WBXHU7C59K5L11233
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- CD Player
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
SKCO AutomotiveReviews
2019 BMW X1 review
Awesome, solid well built suv. Good milage, great performance. A solid, reliable safe vehicle. By BMW recertified. Best vehicle I have ever owned. I would buy one again. I also own an Audi and Toyota.
-





Vehicle Information
- Ext. color
- Natural Green Pearl
- Int. color
- Dark Slate Gray/Medium Slate Gray
- Drivetrain
- Rear-wheel Drive
- MPG
- 15-20
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.8L V-6 regular gasoline, engine with 202HP
- Stock #
- T09788
- VIN
- 1J4BB3H1XAL209788
Features
- Entertainment
- CD Player
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
Dealer
SKCO AutomotiveReviews
2010 Jeep Wrangler Unlimited review
I love it great vehicle fun to drive a real eyecatcher we are completely happy with this vehicle jeeps are great vehicles with very high resale
-





Vehicle Information
- Ext. color
- Rainforest
- Int. color
- Black/Black
- Drivetrain
- Front-wheel Drive
- MPG
- 22-29
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Theta II 2.4L I-4 gasoline direct injection, DOHC, D-CVVT variab
- Stock #
- 066686
- VIN
- 5NMS23AD2KH066686
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
SKCO AutomotiveReviews
SKCO Automotive review
I had a great experience at Skco. Andrew Christensen was great to work with, Andrew was very knowledgeable and very helpful. Andrew made buying a car easy and I did not have a long wait. Thank you, Andrew!
2019 Hyundai SANTA FE review
We’ve put 85,000 miles on our Santa Fe, including a trip from Maryland to Idaho and Utah, and have consistently been happy happy with it. It’s needed no work/repairs, other than routine maintenance.
-





Vehicle Information
- Ext. color
- Steel Gray
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 23-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Theta II 2.4L I-4 direct injection, DOHC, D-CVVT variable valve
- Stock #
- L7656319
- VIN
- KNDP63AC8L7656319
Features
- Convenience
- Keyless Entry
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Albert Lincoln AutomotiveReviews
2020 Kia Sportage review
First off I would like to say that I am a huge car enthusiast who has owned many different cars in my 60 plus years. My most recent cars have been a 2017 Honda Pilot, 2022 Honda CRV and 2023 Toyota Highlander. The Pilot was nice but the CVT transmission drove me nuts with the way it jerked and shifted. The 2022 CRV was also nice but the electronics and bluetooth connectivity were SOOO bad!! The FWD Highlander with new turbo engine was a huge disappointment. I felt unsafe on curvy two lane roads.....like it didn't feel like it was gripping the road properly. It also had terrible turbo lag that was highly frustrating and dangerous feeling. When I would push it hard to get it going, it would almost skid out once it got going. The wireless apple CarPlay was its best feature but generally speaking the electronics were a nightmare and required a subscription to work best. You had to push multiple things to get to your radio and it was all so poorly designed. I had been having severe buyer remorse with the Highlander and started looking again. I drove a RAV4 and it was too underpowered and buzzy for my liking. Also drove a new Mazda CX-50 but was having a hard time spending the dollars on another new car since I would be losing on the Highlander trade. Long story short, we purchased a 2019 Kia Sportage EX for my college aged daughter in 2021. It was affordable, had good reviews and a longer warranty than everything else. She has loved it!! Turns out we have not needed the warranty even one time in these past two years. Only simple oil changes and tire rotations. She's away this summer so my husband and I have been driving her car periodically. During these drives, I decided I like her car so much, that I traded my Highlander for a certified pre-owned 2020 Sportage SX Turbo! I am SOOO thrilled with my decision!! The build is heavy and solid, visibility is incredible and driving it is SO much FUN! Feels like you're driving a Mercedes or BMW but at an extremely affordable price. The controls are so simple that I've not consulted the manual more than a couple of times. Everything has its own button and, although the car is loaded to the brim with every option you can imagine, it's all so easy to navigate and use. Kia made a winner here and I hope they continue on this path of using quality materials and easy to navigate electronics. If so I will be a loyal Kia fan forever!!
-





Vehicle Information
- Ext. color
- Lunar White
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 27-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Nu 2L I-4 DOHC, D-CVVT variable valve control, regular unleaded,
- Stock #
- 752258
- VIN
- KM8K22AA5MU752258
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
SKCO AutomotiveReviews
SKCO Automotive review
The service department is always nice and great prices for oil changes you cant beat it
2021 Hyundai KONA review
Good gas mileage. Turbo model is peppy & surprisingly responsive. All wheel drive great in upstate NY winters. Very comfortable interior, enjoyable to drive, especially long trips.
-





Vehicle Information
- Ext. color
- Satin Steel Metallic
- Int. color
- Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 26-31
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- Ecotec 1.4L I-4 DOHC, variable valve control, intercooled turbo,
- Stock #
- T385148B
- VIN
- KL7CJLSB5KB906112
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
U-J ChevroletReviews
U-J Chevrolet review
I had seen on their website that U-J Cheverlet had a lot of nice used trucks and decided to go there and see for myself. When I arrived I was greeted by sales person Jody Frost. Jody was very warm and very friendly and wanted me to feel comfortable about viewing every truck on the lot before I made any decisions. I found the truck of my dreams. A Chevrolet Silverado 1500 Z71 Texas Edition. Jody was very knowledgeable about every function and button on this truck. Which is good because I was lost and it had so many. He took the time and explained each feature and made me feel confident about my purchase. The rest of the staff made my purchase easy and I was confident about Doing business there. Thanks to Jody and the Team I now drive a beautiful Black Silverado 1500 Z71 Texas Edition which my girlfriend loves to sit in.
2019 Chevrolet Trax review
I've had my Trax for many years now, bought it slightly used with only 30,000 miles on it. Now with 80,000 on that engine and I haven't really had a problem with it. It's decent in the snow, a little slower on the highway as it is slow to accelerate up to speed (not really a huge issue for me). This car can take a beating pretty well and keep going as I had blown tire while on the highway and drove into a ditch. I was able to get the car out of it and park on the side of the road until help arrived.
-





Vehicle Information
- Ext. color
- Pearl White
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 21-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Theta II 2.4L I-4 direct injection, DOHC, D-CVVT variable valve
- Stock #
- T66669
- VIN
- 5XYZT3LB4JG566669
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
SKCO AutomotiveReviews
SKCO Automotive review
The salesman, Gavin W., was very helpful and patient. He did his best to answer my questions and he worked with me to find a great financing deal. I will definitely do business there in the future.
2018 Hyundai Santa Fe Sport review
Currently own a 2018 Santa Fe Sport base model and now has 115k miles on it. I have know major issues a d maintenance cost have been reasonable. I hope to get another 115k off it.
-
Vehicle Information
- Ext. color
- Blizzard Pearl
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 19-26
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 3.5L V-6 DOHC, variable valve control, regular gasoline, engine
- Stock #
- AU032141
- VIN
- 4T3ZK3BB2AU032141
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
Dealer
Toyota West MobileReviews
2010 Toyota Venza review
great car.... lots of added extras for the price, very roomy, looks great interior and exterior, excellent touring car. Even can sleep in it very comfortably with seats down
-





Vehicle Information
- Ext. color
- Victory Red
- Int. color
- Wheat
- Drivetrain
- Four-wheel Drive
- Fuel type
- Gasoline
- Transmission
- 4-Speed Automatic HD with Overdrive
- Engine
- Vortec 6L V-8 regular gasoline, engine with 316HP
- Stock #
- 4H11549T
- VIN
- 5GRGN23U54H115497
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- CD Player
- HomeLink
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Texas Toyota of GrapevineReviews
Texas Toyota of Grapevine review
He was a great guy, such a good help with everything needed. Got me exactly what i needed.
2004 Hummer H2 review
White is the color to get. One xxxx of a vehicle. I love the Comfort and the V 8 Engine by GM IS SO SMOOTH AND QUIET. The team loves it cause we can all go together.Never had any Vehicle that is COMFORTABLE as my Hummer. My wife grabs it any time she can (“HAPPY WIFE, HAPPY LIFE).
-





Vehicle Information
- Ext. color
- Copper
- Int. color
- Brown
- Drivetrain
- All-wheel Drive
- MPG
- 17-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, premium
- Stock #
- TDD007194
- VIN
- WVGEF9BPXDD007194
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Pensacola HondaReviews
Pensacola Honda review
We shopped every Honda dealership from Mississippi to Pensacola and they were by far the best to work with! Gave us what we asked for on pricing, definitely will be back!
2013 Volkswagen Touareg review
This SUV is amazing. It is fully loaded and the panoramic sunroof was the WOW factor that sold me. It rides so smoothly that even Ohio highways seem seamless. I’m still learning my way around the touchscreen computer and I’ll definitely need the manual to direct me because there is more to it than I am used to. Overall it is the pure luxury we were looking for since we are getting older.
About SUVs
What is the cheapest SUV available?
The Jeep Renegade is the cheapest available SUV by average Cars.com listing price, with an average listing price of $14,753.
Which SUV has the best MPG?
The Nissan Rogue has the best MPG among traditional internal combustion SUVs and offers up to 30 MPG city and 37 MPG highway for a combined rating of 33 MPG. The Kia Niro has the best MPG amongst SUVs with hybrid powertrains, reaching 53 MPG city and 54 MPG highway for a combined rating of 53 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
Which SUV has the longest range?
The Cadillac Escalade IQ has the longest range among SUVs and can travel up to 450 miles on a single charge depending on electric motor and battery options.
EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.
Which automaker has the most SUV deals?
Jeep has the most available SUV deals on Cars.com with 21884 great deals out of 70337 listings starting at $1.
Where can I find the most SUV deals?
The most SUV deals can be found near Axis, AL with 40 great deals out of 123 listings starting at $1,200.
Find great prices by city
-
SUVs under $15,000 in Hurley, MS
33 Great Deals out of 107 listings starting at $1,200
-
SUVs under $15,000 in Wade, MS
33 Great Deals out of 107 listings starting at $1,200
-
SUVs under $15,000 in Semmes, AL
36 Great Deals out of 114 listings starting at $1,200
-
SUVs under $15,000 in Citronelle, AL
6 Great Deals out of 31 listings starting at $7,270
-
SUVs under $15,000 in Big Point, MS
33 Great Deals out of 107 listings starting at $1,200
-
SUVs under $15,000 in Beaumont, MS
15 Great Deals out of 49 listings starting at $3,192
-
SUVs under $15,000 in Vancleave, MS
9 Great Deals out of 39 listings starting at $7,270
-
SUVs under $15,000 in Prichard, AL
40 Great Deals out of 125 listings starting at $1,200
-
SUVs under $15,000 in Saraland, AL
40 Great Deals out of 124 listings starting at $1,200
-
SUVs under $15,000 in Escatawpa, MS
33 Great Deals out of 99 listings starting at $1,200
-
SUVs under $15,000 in Helena, MS
33 Great Deals out of 101 listings starting at $1,200
-
SUVs under $15,000 in New Augusta, MS
16 Great Deals out of 48 listings starting at $3,192