Used Cadillac cars for sale near Grapevine, TX
-





Vehicle Information
- Ext. color
- Satin Steel Metallic
- Int. color
- Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- LZ181194
- VIN
- 1GYKNCRS6LZ181194
Features
- Convenience
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of ArlingtonReviews
BMW of Arlington review
I have always received the best service from the entire staff. And one of the service advisors game a tip on a new band she recommended. Alt-j Great experience great music recommendation- thanks again!
2020 Cadillac XT5 review
Got a 2023 identical to this 3 weeks ago. Bought it for retirement road travel. Have had 2 SRXs before. Traded in a sweet 2016 ATS Performance coupe reluctantly. No regrets. Electronics are outstanding. Handles better than the SRX. As peppy and nimble as the ATS. Always GM, never disappointed. Value, comfort, performance.
-





$78,000
Est. $1,440/mo East Dallas Volkswagen
Check Availability Vehicle Information
- Ext. color
- Silver Metallic
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 14-18
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 6.2L V8 16V GDI OHV
- Stock #
- P135805
- VIN
- 1GYS4GKL2RR135805
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Rear Seat Entertainment
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
East Dallas VolkswagenReviews
2024 Cadillac Escalade review
This Escalade is much better and refined more than the five previous we have owned. We would recommend this as high quality luxury car above others in the price range
-





Vehicle Information
- Ext. color
- Black Raven
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 14-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 6.2L V-8 direct injection, variable valve control, premi
- Stock #
- 160948
- VIN
- 1GYS3BKJ5JR160948
Features
- Convenience
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- CD Player
- DVD Player
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarnovaReviews
Carnova review
Estoy muy feliz con mi compra en Carnova. El personal fue muy paciente y respondió todas mis preguntas. Todo el proceso fue fácil y sin estrés.
2018 Cadillac Escalade review
Excellent service from Raul Ibarra sells man made us feel very comfortable. Highly recommend him does not make you waste time going back and forth to get a lower deal he goes straight to the deal.
-





Vehicle Information
- Ext. color
- Stellar Black Metallic
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64857
- VIN
- 1GYKNDRS0RZ702442
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac Frisco -





$28,573
Est. $527/mo Crest Cadillac Frisco
Check Availability Vehicle Information
- Ext. color
- Argent Silver Metallic
- Int. color
- Jet Black, Leather seating surfaces with mini-perf
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64292
- VIN
- 1GYKNDRS7RZ716628
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac Frisco -





Vehicle Information
- Ext. color
- Satin Steel Metallic
- Int. color
- Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64863
- VIN
- 1GYKNCRS5MZ111915
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
Crest Cadillac Frisco review
Mandy made my experience so much easier with her smile and personality and Jason topped it off with his financial expertise.
2021 Cadillac XT5 review
Road noise is loud, Water leak in front passenger side during heavy rain or car wash. Engine noise that the tech can’t locate. The XT 5 is a very nice size SUV. For a high end vehicle the warranty should be better in length and milage..
-





Vehicle Information
- Ext. color
- Crystal White Tricoat
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64859
- VIN
- 1GYKNDRS5RZ714859
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
Crest Cadillac Frisco review
I would like to thank Felix and Jimmy of Crest Cars at Frisco Tx for making my dream vehicle purchase a breeze. Both of these guys are amazing! They are very professional and really reach out in any way possible to make a reasonable deal possible. I highly recommend these two if you need assistance in your next vehicle purchase, the best decision to go with these guys!
2024 Cadillac XT5 review
3rd XT5 have had no issues with '19 & '21. Current our '24 is experiencing automatic braking and cruise control issues. The vehicle is in the shop to be fixed. This issue has caused crashes. Our experience was shocking with the system slamming on the brakes while moving. Ido hope Cadillac gets this issue corrected. We are very apprehensive when driving and will be since this occured.
-





Vehicle Information
- Ext. color
- Galactic Gray Metallic
- Int. color
- Light Platinum/Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 23-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- PF146257
- VIN
- 1GYAZAR49PF146257
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Vandergriff ChevroletReviews
Vandergriff Chevrolet review
Damien my service advisor is the best in the business, highly recommended for your service needs. 100% customers satisfaction. Been over 7 years and only asked for Damien to get your vehicle service needs.
2023 Cadillac XT4 review
My wife and I enjoy our XT4 and we have drive it over 19,000 miles in 11 months. People complaining about issues apparently didn’t test drive one before they purchased other wise they shouldn’t be complaining. Performance 8 Comfort. 8 Quality. 7 Exterior finish 9 Interior 8 Ride. 7 Quietness. 8 Nimbleness. 8 Handling. 7 Rear seat room 6 Over all for the value it’s a very nice car. The sunroof had a rattle - dealer repaired a loose clip - fixed - - dealership replaced its battery it seemed weak - replaced with a more powerful one. We have at times spent 7-8 hours highway driving found it very comfortable and quiet. Headlights light of the road ahead very good. In all a very good car. Sounds like some owners should have driven one more before purchasing one or maybe purchased a larger model. We have owned many much more expensive vehicles and this one is in the top ones we have owned. We are in our 70’s so its smaller size is great for getting around. We haven’t had any issues like their complaining about. We will purchase another one possibly a 2025 model.
-





Vehicle Information
- Ext. color
- Stellar Black Metallic
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64778
- VIN
- 1GYKNGRS3PZ168917
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
2023 Cadillac XT5 review
First of all, I purchased the XT5 Sport AWD with the Platinum package, sticker $69,530. Truthfully, this is a fine ride, and a pleasure to drive. Everything is at your fingertips and easy to use. A couple of items I miss would be the floating high beams that come with intellibeams, the accent lighting in the interior was a nice feature. My final complaint, not enough USB ports. It could use a couple on the dash just below the radio.
-





Vehicle Information
- Ext. color
- Argent Silver Metallic
- Int. color
- Cirrus w/Dark Titanium Accents
- Drivetrain
- Front-wheel Drive
- MPG
- 19-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- C71217A
- VIN
- 1GYKNCRS7RZ719300
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
Crest Cadillac Frisco review
Quick and friendly. Matthew was extremely knowledgeable. He answered all of my questions and was extremely trustworthy. He provided insight to things that I didn’t even think about.
2024 Cadillac XT5 review
This is the 3rd XT5 I have had and I think it is a great car for the money. perfect size with enough room for most everything you would need for trips or just around town.
-





$30,441
Est. $562/mo Crest Cadillac Frisco
Check Availability Vehicle Information
- Ext. color
- Stellar Black Metallic
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 21-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 64831
- VIN
- 1GYKNDR40PZ169166
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
2023 Cadillac XT5 review
Absolutely love it. Got the bigger motor and not sorry! Comfortable as ever. Nice sound system and lots of “tech”. Pretty interior and love the exterior paint!
-





Vehicle Information
- Ext. color
- Crystal White Tricoat
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64833
- VIN
- 1GYKNGRS1PZ138069
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
2023 Cadillac XT5 review
This is my second XT5. Had a 2017 and never had a problem. Just got my 2023 XT5 Sport, and wow, maybe too much power for a senior citizen, but I love it. A few changes from the 2017, but love the car. I put other vehicles like the Jeep or GMC as beasts, my XT5 is more like a cat, still get where I want to be with luxury.
-
$57,261
New 2026 Cadillac CT5 Premium Luxury
$121,855
New 2026 Cadillac Escalade IQL Luxury
$128,474
New 2026 Cadillac Escalade IQ Sport
$62,849
New 2027 Cadillac OPTIQ Premium Sport
$49,119
New 2026 Cadillac XT5 Luxury
$132,099
New 2026 Cadillac Escalade IQ Sport
$126,909
New 2026 Cadillac Escalade Sport Platinum
$130,384
New 2026 Cadillac Escalade ESV Sport Platinum
$129,394
New 2027 Cadillac Escalade Sport Platinum
$81,714
New 2026 Cadillac OPTIQ V-Series
$131,705
New 2027 Cadillac Escalade ESV Sport Platinum
$58,819
New 2026 Cadillac XT5 Sport -





Vehicle Information
- Ext. color
- Stellar Black Metallic
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 64860
- VIN
- 1GYKNDRS3RZ701379
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac Frisco -





Vehicle Information
- Ext. color
- Silver Coast Metallic
- Int. color
- SHALE/COCOA, SOLEIL KEISEL LEATHER SEATING SURFACE
- Drivetrain
- All-wheel Drive
- MPG
- 17-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- E9173965
- VIN
- 2G61N5S32E9173965
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Vandergriff ChevroletReviews
Vandergriff Chevrolet review
Great place excellent customer service! Bought my car here and have enjoyed coming back for service.. will buy here again when I?m ready to trade my car in .
2014 Cadillac XTS review
I brought my 2014 Cadillac XTS in 2021 with only 17,000 miles on it and I now have 77,000 miles on it. The only complaint I have is when I took it to the dealer to get a headlight changed the service manager told me the whole front end of the car had to be taken apart to change that headlight and one of the mechanics overheard him and came over and said that’s not true so the mechanic showed him how by removing three screws you could get access to the LED headlight and it still cost $500 because the bulb itself was somewhere around 400! Now at 77,000 miles if you’re thinking about buying one make sure the struts and the leveling compressor are all in perfect shape. At 77,000 miles I am looking at $3000 to replace the rear struts and. Another 2200 for the front struts and up to 3000 for the air compressor if that is bad so you could be looking at six to $8000 for four struts , and a compressor! I’m selling the car as is.
-





$31,287
Est. $577/mo Crest Cadillac Frisco
Check Availability Vehicle Information
- Ext. color
- Argent Silver Metallic
- Int. color
- Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 22-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 64844
- VIN
- 1GYKNCR47PZ112165
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
2023 Cadillac XT5 review
The Luxury and comfort leveli is not the same that. people got from the early 2000's and earlier models.Disappointing and makes you wonder why you are paying an upcharge over a basic gm or chevrolet of same size just for the name
-





$24,523
Est. $453/mo Crest Cadillac Frisco
Check Availability Vehicle Information
- Ext. color
- Wilder Metallic
- Int. color
- Jet Black
- Drivetrain
- Front-wheel Drive
- MPG
- 22-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 64525A
- VIN
- 1GYKNCR46NZ153528
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Crest Cadillac FriscoReviews
Crest Cadillac Frisco review
I purchased an SUV with Samuel Dixon. He was so awesome to work with and the sales transaction went smoothly. Sam and the team were straightforward. I look forward to purchasing again in the future. In the past, I've been to different dealerships, and I was tired of their deceitful tactics.
2022 Cadillac XT5 review
Excellent handling, very maneuverable, very tight turning radius, decent fuel economy, great infotainment system and navigation, great paint job, very comfortable seats. Very satisfied with my XT5.
-





$38,079
Est. $703/mo Meador Chrysler Dodge Jeep Ram
Check Availability Vehicle Information
- Ext. color
- Argent Silver Metallic
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 18-26
- Fuel type
- Gasoline
- Transmission
- 9-Speed A/T
- Engine
- 3.6L V6 Cylinder Engine
- Stock #
- 704247AP
- VIN
- 1GYKNDRS1RZ704247
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Meador Chrysler Dodge Jeep RamReviews
Meador Chrysler Dodge Jeep Ram review
While I didn't purchase a vehicle here after all (the deal on my first choice of vehicle came through), I had a fantastic internet sales experience with Vanessa Weathers! I'd give her 6 stars if I could. Responsive, friendly, provides all the information requested, very professional, absolutely the best domestic brand internet sales department experience I ever had. I wholeheartedly recommend giving Vanessa & Meador a shot at earning your business. You will be pleasantly surprised by their transparency and professionalism.
-





$200,704
Est. $3,704/mo Hurst Autoplex Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Black Raven
- Int. color
- Jet Black
- Drivetrain
- All-wheel Drive
- MPG
- 11-17
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic with Overdrive
- Engine
- 6.2L V-8 direct injection, VVT variable valve control, intercool
- Stock #
- 12172
- VIN
- 1GYS9HK98TR344677
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Rear Seat Entertainment
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Hurst Autoplex MitsubishiReviews
Hurst Autoplex Mitsubishi review
Nathan is an excellent service manager. He's been taking care of my little Wonder Woman car for years.
-





Vehicle Information
- Ext. color
- Silver
- Int. color
- Light Titanium/Ebony Accents
- Drivetrain
- Front-wheel Drive
- MPG
- 17-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.6L V-6 direct injection, DOHC, variable valve control, regular
- Stock #
- 630571
- VIN
- 3GYFNBE37ES630571
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
DFW Unique AutoReviews
DFW Unique Auto review
I was looking for a clean vehicle and I wanted to be at a right price. I went to this dealership and I end up buying another vehicle which I never thought I could afford. Thank you Aaron. You have a customer for life.
2014 Cadillac SRX review
Very nice SUV has a Cadillac comfort ride witch his excellent. A lot of features and gadgets. Cadillac stuff in around for years and I always have been very luxurious and the ride is just awesome.
-





$129,715
Est. $2,394/mo Hurst Autoplex Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Aegean Stone
- Drivetrain
- Four-wheel Drive
- MPG
- 14-18
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic with Overdrive
- Engine
- EcoTec3 6.2L V-8 direct injection, variable valve control, premi
- Stock #
- 12267
- VIN
- 1GYS9EKL9TR405321
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Hurst Autoplex MitsubishiReviews
Hurst Autoplex Mitsubishi review
I recently bought my 8th vehicle from Hurst Autoplex and it was an excellent experience as always! I’ve worked with Ryan Miller many times over the last 9 years and he makes the process is incredibly simple. I spent less than 20 minutes in the dealership before I was driving home in a new vehicle. Hurst Autoplex always has a large inventory of competitively priced high end cars. They offer fair values on trade ins and back their products. I’m a lifelong customer of Hurst Autoplex and recommend that you are as well!
-





$75,443
Est. $1,392/mo Grubbs INFINITI
Check Availability Vehicle Information
- Ext. color
- Silver Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 14-19
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 6.2L V8 16V GDI OHV
- Stock #
- RR139598
- VIN
- 1GYS3GKL6RR139598
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Rear Seat Entertainment
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Grubbs INFINITIReviews
Grubbs INFINITI review
Was greeting the moment I drove in. Definitely good Customer service they were able to turn a bad situation to a good experience. John and Ezekiel were very helpful in getting my car in to get worked on. Will definitely be coming back
-





$79,995
Est. $1,476/mo Carsandpickups.com of Dallas
Check Availability Vehicle Information
- Ext. color
- Dark Emerald Metallic
- Int. color
- Dark Auburn w/Jet Black Accents
- Drivetrain
- Four-wheel Drive
- MPG
- 14-18
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 6.2L V-8 direct injection, variable valve control, premi
- Stock #
- 545778
- VIN
- 1GYS4RKL3PR545778
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Rear Seat Entertainment
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Carsandpickups.com of DallasReviews
Carsandpickups.com of Dallas review
Great service, Robert (salesman) was very friendly and easy to work with! Highly recommend this dealer if you are looking for a vehicle to purchase.
2023 Cadillac Escalade ESV review
Absolutely love this SUV. beautiful in every way. after 88k miles there are only 2 negative things i can possibly say 1) the auto-braking feature while backing up will give you whiplash if somebody walks the vehicle but its a good thing just very violent. 2) she is the biggest thing on the road that you dont need a special license for which makes my wife terrified to drive it. she has definitely become a passenger princess in it which i kinda dont mind because i get to enjoy the joy of driving it all to myself.
-





Vehicle Information
- Ext. color
- Emerald Lake Metallic
- Int. color
- Sky Cool Gray w/Santorini Blue Accents
- Drivetrain
- All-wheel Drive
- Fuel type
- Electric
- Transmission
- NONE
- Engine
- Electric
- Stock #
- RZ140169
- VIN
- 1GYKPTRL6RZ140169
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Frank Kent CadillacReviews
2024 Cadillac LYRIQ review
It’s really a pretty great car. For the price, the car is quite luxurious and well-made. I had a glitch or two when I first got it, but they were quickly resolved and have had no further problems over my first year of ownership. The car is smooth, quiet, very powerful and quick. I’ve been getting close to 3 miles per kilowatt hour over the long haul using the regenerative braking system. There is a little adjustment to drive an EV over a gas engine car, but the advantages are easily stated such as the smooth power and low maintenance required. The lower range is an issue for long trips, but if you’re not in a real hurry, the stops to charge can be quite pleasant. That said, my wife and I usually use her hybrid Lexus when we go road tripping as it is just more comfortable as it is what we are used to. Kudos to Cadillac for a job well done.
-





$107,516
Est. $1,984/mo Frank Kent Cadillac of Arlington
Check Availability Vehicle Information
- Ext. color
- Crystal White Tricoat
- Int. color
- Whisper Beige w/Gideon Accents
- Drivetrain
- Four-wheel Drive
- MPG
- 14-18
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 6.2L V-8 direct injection, variable valve control, premi
- Stock #
- SR247300
- VIN
- 1GYS9GRLXSR247300
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Rear Seat Entertainment
- USB Port
- WiFi Hotspot
- Exterior
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Frank Kent Cadillac of ArlingtonReviews
Frank Kent Cadillac of Arlington review
Friendly tip work with. Delivered the car clean but very little gas in it. Beautiful car.
-





$70,822
Est. $1,307/mo Clay Cooley Cadillac
Check Availability Vehicle Information
- Ext. color
- Black Raven
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 14-18
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 6.2L V8
- Stock #
- RR150451
- VIN
- 1GYS4BKL9RR150451
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Clay Cooley CadillacReviews
Clay Cooley Cadillac review
Lone Star Cadillac is a first class dealership. Mr. Ike Iwu and his team made my experience so quick and easy. They are very experienced in their jobs and are very professional. This is my 7th vehicle purchase from Richard Wells. He is such an amazing salesman and very professional. He makes the car-buying experience so seamless and easy. The entire staff was so professional and made every step during the process simple and quick. They made sure that I understood everything about my new car and walked me through every step. I really appreciated the care and attention that they showed me.
-





Vehicle Information
- Ext. color
- Crystal White Tri-Coat
- Int. color
- Dark Auburn
- Drivetrain
- Four-wheel Drive
- MPG
- 14-19
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 6.2L V8 16V GDI OHV
- Stock #
- 65644A
- VIN
- 1GYS4GKL7NR264424
Features
- Convenience
- Adaptive Cruise Control
- Heated Steering Wheel
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ames FordReviews
Ames Ford review
I highly recommend Ames Ford Lincoln The whole car buying experience there was very good. Our salesman David Xu was attentive to our needs. Everyone was so nice when we picked up our car. We love our Toyota Highlander Limited.
2022 Cadillac Escalade review
I purchased a used 2021 model Sport and after being very impressed sold it in order to get a 2022 Sport with Super Cruise, which I absolutely love. I love all of the new technology, with the exception of Apple Car Play. I had a 2016 prior to this generation and was surprised that the gas mileage is actually better on the newer one. The ride is the best ever.
-





$71,193
Est. $1,314/mo Lexus of Wichita
Check Availability Vehicle Information
- Ext. color
- Gold
- Int. color
- Platinum
- Drivetrain
- Four-wheel Drive
- MPG
- 14-19
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 6.2L V-8 gasoline direct injection, variable valve contr
- Stock #
- 54C0002P
- VIN
- 1GYS4DKL5MR344821
Features
- Convenience
- Adaptive Cruise Control
- Automatic Parking
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Rear Seat Entertainment
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Lexus of WichitaReviews
Lexus of Wichita review
Just bought the brand new Lexus RX350! So excited Haris helped us find the perfect car! He was extremely helpful and gave us straight forward answers to any questions we asked! Would definitely recommend you ask for Haris when you walk in the door!
2021 Cadillac Escalade review
Nice vehicle very good family truck 68,000 miles very solid have not had any major issues comfortable and ample power like the options great power pulling boat