Used Mazda cars for sale in Vero Beach South, FL
-





$26,447
Est. $482/mo Nissan of Fort Pierce
Check Availability Vehicle Information
- Ext. color
- Polymetal Gray
- Int. color
- Red
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- N260905591T1
- VIN
- JM3KFBCMXN0562875
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Nissan of Fort PierceReviews
Nissan of Fort Pierce review
Muy agradecida con Lazaro Lopez y Milton Perez por ser tan Agradables y Amables Personas súper atención ,da gusto Visitar Sutherlin Nissan Of Fort Pierce 😊❤️👍
2022 Mazda CX-5 review
We have owned our 2022 CX-5 Turbo for 10 moths and it is a great vehicle. Our previous SUV was an Acura RDX Advance. It too was great but this Mazda is of a higher quality and $10-$15,000 less when purchased new. Every once in a while the doors don’t lock when I walk away (I have it set up to do so) and that is the only issue I have had in 10 months and 10,000 miles. I highly recommend any Mazda product. We also own a ‘21 Miata RF, have owned several Miatas along with a Mazda6 Signature and a CX-9 Grand Touring. All have been great vehicles.
-





$21,993
Est. $401/mo Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce
Check Availability Vehicle Information
- Ext. color
- Platinum Quartz Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- M674216
- VIN
- 3MVDMBBM1RM674216
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. PierceReviews
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce review
Manny was a wonderful salesman. He was professional, friendly and helpful in getting us a deal on a used Jeep Grand Cherokee. Thank you Manny! You do your company a great service!
-





Vehicle Information
- Ext. color
- Eternal Blue Mica
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 28-37
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC
- Stock #
- CHFTHM126524
- VIN
- 3MZBN1V7XHM126524
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Coggin Honda of Fort PierceReviews
Coggin Honda of Fort Pierce review
Mike Lopez my salesman was great Was able to purchase a New Honda for a great price with zero hassle!!!! They have a great selection and great deals!!!!
2017 Mazda Mazda3 review
Bought 2017 Mazda3 Touring 6 Speed Manual new. It now has 180k miles. Fun to drive, great on fuel, great handling (Way better than Toyota Corolla), more than enough technology including Android Auto & Apple Car Play, easy on maintenance, very reliable (More reliable than Toyota in my opinion)
-





$21,993
Est. $401/mo Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce
Check Availability Vehicle Information
- Ext. color
- Platinum Quartz Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- M674216
- VIN
- 3MVDMBBM1RM674216
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. PierceReviews
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce review
Manny was a wonderful salesman. He was professional, friendly and helpful in getting us a deal on a used Jeep Grand Cherokee. Thank you Manny! You do your company a great service!
-





$22,266
Est. $406/mo Nissan of Vero Beach
Check Availability Vehicle Information
- Ext. color
- Jet Black Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 23-29
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.5L I4 16V GDI DOHC
- Stock #
- 26361A
- VIN
- JM3KFBBL0R0480992
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Nissan of Vero BeachReviews
Nissan of Vero Beach review
Best dealer ever great customer service dee was wonderful and very patient he and finance manager did a great job
2024 Mazda CX-5 review
This is my first CX-5. I love it. Previously I drove a mazda tribute which was a 6 cylinder. I was reluctant to purchase a smaller vehicle with a smaller engine, but I’ve been pleased. My only negative comment is regarding the leg room in the back seat. It’s not great but workable for most average size adults.
-





$22,603
Est. $412/mo Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce
Check Availability Vehicle Information
- Ext. color
- Eternal Blue Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- 0220342
- VIN
- JM3KFBAM0P0220342
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
Dealer
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. PierceReviews
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce review
Once again Great Sevice Joel was an amazing salesperson we trading in for a new truck seen a few and settled on one awesome experience
2023 Mazda CX-5 review
We looked at Honda, Toyota, Nissan, Hyundai, and Mazda and selected the Mazda CX-5. Honda and Toyota have priced themselves out of the middle-class budget, and Nissan’s Achilles Heel is their very brittle CVT transmission. Mazda is by far the best-looking, has AWD as standard equipment (a $1,200 to $1,500 option on other brands), easy-to-read gauges and dash, nice sound system, soft-touch dash and doors usually found only on “premium” brands, the best price, and the most beautiful factory color on the road: Soul Red. Our family has owned vehicles from all 5 companies, and have been totally happy with our problem-free CX-3. Anyone looking to buy a compact crossover should consider the CX-5.
-
-





$26,447
Est. $482/mo Nissan of Fort Pierce
Check Availability Vehicle Information
- Ext. color
- Polymetal Gray
- Int. color
- Red
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- N260905591T1
- VIN
- JM3KFBCMXN0562875
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Nissan of Fort PierceReviews
Nissan of Fort Pierce review
Muy agradecida con Lazaro Lopez y Milton Perez por ser tan Agradables y Amables Personas súper atención ,da gusto Visitar Sutherlin Nissan Of Fort Pierce 😊❤️👍
2022 Mazda CX-5 review
We have owned our 2022 CX-5 Turbo for 10 moths and it is a great vehicle. Our previous SUV was an Acura RDX Advance. It too was great but this Mazda is of a higher quality and $10-$15,000 less when purchased new. Every once in a while the doors don’t lock when I walk away (I have it set up to do so) and that is the only issue I have had in 10 months and 10,000 miles. I highly recommend any Mazda product. We also own a ‘21 Miata RF, have owned several Miatas along with a Mazda6 Signature and a CX-9 Grand Touring. All have been great vehicles.
-





$22,603
Est. $412/mo Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce
Check Availability Vehicle Information
- Ext. color
- Eternal Blue Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- 0220342
- VIN
- JM3KFBAM0P0220342
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
Dealer
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. PierceReviews
Arrigo Chrysler Dodge Jeep Ram FIAT of Ft. Pierce review
Once again Great Sevice Joel was an amazing salesperson we trading in for a new truck seen a few and settled on one awesome experience
2023 Mazda CX-5 review
We looked at Honda, Toyota, Nissan, Hyundai, and Mazda and selected the Mazda CX-5. Honda and Toyota have priced themselves out of the middle-class budget, and Nissan’s Achilles Heel is their very brittle CVT transmission. Mazda is by far the best-looking, has AWD as standard equipment (a $1,200 to $1,500 option on other brands), easy-to-read gauges and dash, nice sound system, soft-touch dash and doors usually found only on “premium” brands, the best price, and the most beautiful factory color on the road: Soul Red. Our family has owned vehicles from all 5 companies, and have been totally happy with our problem-free CX-3. Anyone looking to buy a compact crossover should consider the CX-5.
-



Vehicle Information
- Ext. color
- Gray
- Int. color
- Red
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- SKYACTIV 2.5L 4-Cylinder DOHC 16V
- Stock #
- 260896A
- VIN
- JM3KFBCMXN1560599
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Bev Smith KiaReviews
Bev Smith Kia review
Awesome experience with James Taylor (not the singer). Did a great job helping find and sell me a used Tacoma when there were none on the market.
2022 Mazda CX-5 review
Have had our 2022 for 8 months now. It's been great, the fit/finish and ride are superior, IMHO, then my previous CRV and Rav4 vehicles. The only thing I would like to see is a touch screen entertainment center rather then the manual knob. The interior is well laid out with quality accents, feel and quiet, again far superior to our previous SUVs. So far it's been mechanically sound with no issues and we are enjoying it very much.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 70213851
- VIN
- JM3KE2DY0F0550725
Features
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Rain Sensing Wipers
- Seating
- Leather Seats
Dealer
CarMax Jensen BeachReviews
2015 Mazda CX-5 review
I love my 2015 Mazda CX5 Grand Touring. It is the first Mazda I have ever owned. Pleasantly surprised with it all around. Would recommend to anyone.
-





Vehicle Information
- Ext. color
- Snowflake White Pearl Mica
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 25-31
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- P28398
- VIN
- JM3KFACM7M0461768
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Toyota of Vero BeachReviews
Toyota of Vero Beach review
Janeth fue una excelente asesora, 100% recomendada, su ayuda sin lugar a duda fue increíble, Saludos.
2021 Mazda CX-5 review
I did an extensive research on Japanese SUV’s and I kept coming back to the Mazda CX5. This vehicle is beautiful inside and out and is amazingly smooth and quiet. It also has really good handling and plenty of power even with the 4 cylinder. I think Mazda gives the best bang for the buck of all the Japanese car brands. I highly recommend the Mazda CX5.
-





Vehicle Information
- Ext. color
- Sonic Silver Metallic
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 23-31
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.5L I4 16V GDI DOHC Turbo
- Stock #
- S26133012T1
- VIN
- JM1GL1TY3J1334743
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
Dealer
Sunrise FordReviews
Sunrise Ford review
Great experience. Ricky was very patient and Rob in finance explained everything. Will definitely come back!
2018 Mazda Mazda6 review
One of the best driving experiences. Very comfortable, nice power and great looking car. If you put premium fuel in it you get and 20+ horsepower but you can drive on regular. Great option…..
-
-





$22,847
Est. $417/mo Sunrise Ford
Check Availability Vehicle Information
- Ext. color
- Polymetal Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.5L I4 16V GDI DOHC
- Stock #
- S260808479T1
- VIN
- 7MMVABEM4PN127616
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Sunrise FordReviews
Sunrise Ford review
Recently purchased a new car Mustang GT And Rob in finance helped me get out of finance quickly and efficiently. Finance is usually the worst part but he made it seamless. Thank you Sunrise ford
2023 Mazda CX-50 review
Have the 2025 CX-50 in white premium addition. Often think whether I should have bought the turbo as I wish I had some more power, but I didn’t want to give our insurance a reason to hike rates. It gets the job done and in style. Interior is nicely finished but I’ve experienced many little rattles from instrument cluster, A pillar, mounted Bose speakers, etc. lots of felt tape was needed to mitigate. Technology is the major con here. Constantly have to reconnect Bluetooth so I just plug it in now all the time. Wireless phone charger never works - it overheats seemingly after two minutes and stops working. At times the tailgate buttons seem to get confused and don’t know what you’re asking it to do. And the way the doors all lock / unlock together can be frustrating and I’ve learned that it depends on how many times you hit the disarm / unlock button on the key fob. Finally, memory seats never worked since buying it new, and I’m too lazy to bring it in all day for that. I like the car but I’m not sure I’ll get into another one after my time is up with it.
-





$20,388
Est. $372/mo Vero Beach Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Ceramic Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- MP3003
- VIN
- 3MVDMBBM1RM607292
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Vero Beach MitsubishiReviews
Vero Beach Mitsubishi review
Just took a family member from Canada to have his bearings check and just happened to look to compare price and saw that one and just made a deal. We are very happy with our decision ?
-





Vehicle Information
- Ext. color
- Jet Black Mica
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 26-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2L I-4 direct injection, DOHC, variable valve control
- Stock #
- P28390A
- VIN
- JM1NDAB77K0307498
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
Toyota of Vero BeachReviews
Toyota of Vero Beach review
So far my services have been very good from this dealership after I purchased my vehicle in 2023.
2019 Mazda MX-5 Miata review
I moved up from a 2015 Mazda 3 sport to the 2019 Mazda MX-5 Miata Grand Touring soft top in May of 2020. It is soul red with tan leather interior. I have received many compliments from people who say the car looks more expensive then it really is. I prefer the soft top over the hard top model because it was almost 5 grand cheaper and I get more open space when driving with the top down. Takes me about two seconds to drop the top even while I'm sitting in the driver seat at a stop light. It is a lot of fun in sport mode on the highway as you can easily pass about anyone in seconds. Sometimes people move out of you way when they see you in their rear view mirror, lol. I turned off the lane departure feature as it beeps too much for me. I love the blind spot feature, automatic headlights, automatic climate control, seat heaters, and rain sensing wipers. There is a lot of wind noise in the cabin even with the top up and it is not as comfortable on long rides like the Mazda 3 was but I wouldn't go back. The trunk space is only good for one week of groceries or one carry on suitcase. There is no spare tire so I recommend having roadside assistance. CarPlay for iPhone works seamlessly and the Bose system sounds awesome. Build quality is top notch on this car, nothing feels cheap, and everything is laid out well. You have storage behind your seats but be aware the glove box is in between the seats and can be blocked by anything in the cup holders. I'm 5 foot 3 so this car fits me perfectly.
-





$28,437
Est. $519/mo Toyota of Vero Beach
Check Availability Vehicle Information
- Ext. color
- Jet Black Mica
- Int. color
- Black w/Brown
- Drivetrain
- All-wheel Drive
- MPG
- 22-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- P28336A
- VIN
- 3MVDMBDY5RM704513
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Toyota of Vero BeachReviews
Toyota of Vero Beach review
Just purchased a Toyota Venza. Very happy. Thank you Anthony and Toyota of Vero Beach
2024 Mazda CX-30 review
I love my CX30. Only a few very minor complaints. The back seat is small. I would only recommend it for small children. Since i'm the only user, it doesn't really apply to me. The car overall is small, which makes it easier to maneuver and more fun to drive than larger CX models. I'm 6'3 tall and have no problem fitting in the driver's seat - plenty of head and leg room. The other complaint is the small gas tank (under 13 gallons). Even though, I don't regret buying my CX30. It's a lot of fun! I would definitely recommend not looking at any trim level lower than premium due to all the options the premium includes. I opted for the non-turbo. It's fast enough without it, and was 3K less.
-





Vehicle Information
- Ext. color
- White
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 70187954
- VIN
- JM3KFBCM2M0451364
Features
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax Jensen BeachReviews
2021 Mazda CX-5 review
The only issue I have had was the code P0126 having to do with the thermostat. This is common for this car. I was 170 miles from home when it happened. I talked to a Mazda dealer and they said I could drive it home, which I did and made an appointment with the dealer to have it fixed. It has not happened again. I am very happy with this car!
-





$23,998
Est. $438/mo CarMax Jensen Beach
Check Availability Vehicle Information
- Ext. color
- Black
- Int. color
- GRAY
- Drivetrain
- Four-wheel Drive
- MPG
- 24-30
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 28501514
- VIN
- JM3KFBCM3P0172087
Features
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax Jensen BeachReviews
CarMax Jensen Beach review
Absolutely no pressure at all. All cars are unlocked so I was free to browse whatever vehicle I wanted. There are no sales persons on the lot following you around. Salesperson was very nice, professional, knowledgeable.
2023 Mazda CX-5 review
I am delighted with my 2023 CX-5 Signature in the hard-to-find Eternal Blue. I've had it about one year now and it's more than adequate for my driving needs. No, I don't need a rattle-prone pano sunroof. The six-speed non-CVT transmission is just fine. Never need or use(less) the paddle shifters. Performance with regular fuel is just fine. As an "early senior", I don't need huge cargo or passenger space. Only complaints are the Apple CarPlay isn't wireless; and miss the power tilt/telescope steering wheel and power memory exit seat that I had on my unbeloved '20 Lexus NX (which I was glad to get rid of!). All told, I'm a Mazda believer and buh-bye Lexus!
-





$20,388
Est. $372/mo Vero Beach Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Ceramic Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- MP3003
- VIN
- 3MVDMBBM1RM607292
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Vero Beach MitsubishiReviews
Vero Beach Mitsubishi review
Just took a family member from Canada to have his bearings check and just happened to look to compare price and saw that one and just made a deal. We are very happy with our decision ?
-





$20,288
Est. $370/mo Vero Beach Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Deep Crystal Blue Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- MP2990
- VIN
- 3MVDMBBMXRM654899
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Vero Beach MitsubishiReviews
Vero Beach Mitsubishi review
Chris, the service associate was very courteous and respectful. Waiting area is stocked with great complimentary coffee and snacks. Repair was completed and vehicle returned earlier than expected and washed.
2024 Mazda CX-30 review
The turbo is remarkable feat of engineering. 227 HP from regular unleaded and torque that leaps right from the get-go, maxing out by 2500 rpm. 29 MPG on a trip with 2 hours of highway and 1.5 of city stop & go. Add 93 Octane and you get 240 HP and change. Very responsive steering and suspension. The Premium Plus will spoil you rotten. THAT SAID ... the gas tank is tragically under-sized. Good luck getting to 300 miles even on a well-behaved week of driving. Though 2 gallons remain when the panic lights up on the dashboard, you won't know how much you've used of it thanks to zero=2 gal on the gauge. Also, at 1 of those is just used to keep the fuel pump cooled. We've wrestled for months now over whether it's even safe to drive around these parts with a measly 275 mile range.
-





$20,288
Est. $370/mo Vero Beach Mitsubishi
Check Availability Vehicle Information
- Ext. color
- Deep Crystal Blue Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- MP2990
- VIN
- 3MVDMBBMXRM654899
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Vero Beach MitsubishiReviews
Vero Beach Mitsubishi review
Chris, the service associate was very courteous and respectful. Waiting area is stocked with great complimentary coffee and snacks. Repair was completed and vehicle returned earlier than expected and washed.
2024 Mazda CX-30 review
The turbo is remarkable feat of engineering. 227 HP from regular unleaded and torque that leaps right from the get-go, maxing out by 2500 rpm. 29 MPG on a trip with 2 hours of highway and 1.5 of city stop & go. Add 93 Octane and you get 240 HP and change. Very responsive steering and suspension. The Premium Plus will spoil you rotten. THAT SAID ... the gas tank is tragically under-sized. Good luck getting to 300 miles even on a well-behaved week of driving. Though 2 gallons remain when the panic lights up on the dashboard, you won't know how much you've used of it thanks to zero=2 gal on the gauge. Also, at 1 of those is just used to keep the fuel pump cooled. We've wrestled for months now over whether it's even safe to drive around these parts with a measly 275 mile range.
-


Vehicle Information
- Ext. color
- Deep Crystal Blue Mica
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 22-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, VVT variable valve c
- Stock #
- MP3053
- VIN
- JM3KFBAY5N0601636
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Vero Beach MitsubishiReviews
Vero Beach Mitsubishi review
If you’re looking for a trustworthy car salesman who truly goes above and beyond — ask for Deiondre “Dee” Tubbs at the Mitsubishi dealership. Last night, I got a flat tire on US 1 at 6 PM and stopped at Midas for help. They had just closed and couldn’t get me a tire for two days. I live an hour away and was completely stuck. After trying another nearby dealerships with no luck, I walked over to the Mitsubishi dealership — and that’s where I met Dee. He opened the door with a warm welcome, listened to my situation, and before I could even finish explaining, he was already walking toward my car parked across the street. I thought he was a mechanic — turns out, he’s a salesman who just genuinely cares. Within 20 minutes, he had my spare tire on and refused to accept any payment or even share his Venmo. Deiondre Tubbs is the definition of outstanding customer service and old-school integrity. He didn’t just sell me on a car — he sold me on character. If you want to work with a kind, honest, and dependable car salesman you can trust, go see Deiondre Tubbs. Actions don’t lie — I’ll be buying my next vehicle from him!
2022 Mazda CX-5 review
After 36000 miles on my 2025 Signature Turbo I would definitely purchase it again. Previous vehicles were Acura & Lexus. The CX5 checks all the boxes.
-


Vehicle Information
- Ext. color
- DK GRAY
- Int. color
- WHITE
- VIN
- JM3KKEHD6S1200537
Features
- Convenience
- Heated Seats
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Blind Spot Monitor
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Seating
- Memory Seat
Dealer
Dyer Mazda SubaruReviews
Dyer Mazda Subaru review
Do yourself a favor and go see Kole and Jeffrey for that new Mazda you are looking for! They were fabulous to work with, and Hunter in the finance office completed a smooth and easy transaction. You’ll be glad you did!
2025 Mazda CX-90 review
5 Stars ⭐⭐⭐⭐⭐ – Outstanding Service & Amazing CX-90 from Mazda of Orland Park! We recently purchased the 2025 Mazda CX-90 AWD from Mazda of Orland Park, and We couldn’t be more pleased with the entire experience. From start to finish, the service was exceptional — professional, smooth, and stress-free. A special thank you to Chris Duer, who went above and beyond throughout the process. Chris was knowledgeable, transparent, and genuinely committed to helping us find the right vehicle. He made sure every detail was covered, took the time to answer all our questions, and made us feel confident in our purchase from the moment we walked in. The CX-90 AWD is a phenomenal SUV — powerful, luxurious, and equipped with all the latest tech and safety features. It drives like a dream and checks every box I had for comfort, performance, and design. The entire team at Mazda of Orland Park made the buying process seamless, from financing to delivery. Chris ensured we were fully comfortable with every step and that we left knowing how to get the most out of my new Mazda. If you're in the market for a vehicle and want a dealership that values honesty, quality service, and customer care — ask for Chris Duer at Mazda of Orland Park. You won’t be disappointed!
-


Vehicle Information
- Ext. color
- GOLD
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- VIN
- JM1NDAC70N0505729
Features
- Convenience
- Keyless Entry
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Safety
- Backup Camera
- LED Headlights
- Stability Control
Dealer
Dyer Mazda SubaruReviews
2022 Mazda MX-5 Miata review
There are a lot of professional reviews that state the absolute fun of driving this vehicle. After owning this car and driving in multiple traffic conditions in south Florida, I have to say that the reviews are completely correct. I've owned my share of cars, including some sports cars, like a 2021 WRX (manual tranny) and a 2004 RX-8 (auto tranny). This 2022 Miata MX-5 definitely beats the WRX hands down in drivability and fun. It also edges out the RX-8, but the rotary is something in its own class. My favorite thing about this car is the gear ratio. It fits in almost every driving condition. There's plenty of room in 1st and 2nd while in rush hour traffic, and if you want to step on it, holy cow! This car is F>A>S>T>!!! It's reportedly set to go to 60mph in under 6 seconds, and I believe it. After 500 miles on the odo, the car seemed to open up and got even more fast and fun. At first I thought the cockpit was too small. After getting into this car from my Mazda 3, I felt cramped and a bit claustrophobic. That lasted about three days. Now it feels totally natural and comfortable. I'm 5'9" and slender build, so I really fit in this car. Someone above 6ft tall and larger build would probably feel tight. This is a glorious go kart, with a Bose stereo, terra cotta leather seats, and platinum quartz color. It corners like no one's business, and if I turned off my traction control, it would drift beautifully. With the traction control, it catches and corrects in an intentional slide. The turning radius is ridiculously tiny. Throwing the top open takes about 3 seconds, literally. The seats have speakers in the head area for calls and the higher pitch of the Bose sound. This is my daily driver, and I love it. If you have a partner who has a larger car for the more practical notions, go get one of these before you turn 80. You'll be glad you did.
-


Vehicle Information
- Ext. color
- BLACK
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- VIN
- JM1NDAM70R0605012
Features
- Convenience
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Safety
- Brake Assist
- LED Headlights
- Stability Control
Dealer
Dyer Mazda SubaruReviews
Dyer Mazda Subaru review
Excellent service, and good customer personnel, I would go back for service here, maybe I would buy my next Subaru in this dealership. I love that they offer coffee while you wait.
-

$12,099
Est. $221/mo Sunrise Volkswagen of Fort Pierce
Check Availability Vehicle Information
- Ext. color
- Jet Black Mica
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 29-34
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC
- Stock #
- P260613504T1
- VIN
- JM1DKDB70H0168908
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Sunrise Volkswagen of Fort PierceReviews
Sunrise Volkswagen of Fort Pierce review
Staff members were very personable, knowledgeable and professional. The inventory was well-stocked and the selection was readily available for browsing. The financing process was quick and efficient. The total time spent in the process was reasonable. Denise Bowman is superb!
2017 Mazda CX-3 review
It’s a wonderful car great gas mileage I don’t have to worry about the winter in it getting to work it’s awd. Traci was a great sales lady couldn’t have asked for a better person.
-


Vehicle Information
- Ext. color
- LT BROWN
- Int. color
- LT BROWN
- VIN
- JM1BPBYY9S1756157
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- LED Headlights
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Dyer Mazda SubaruReviews
2025 Mazda Mazda3 review
It’s a sport car! Can get a honda or toyota with the same price but basic features. Totally worth the value. This is good for personal and family use.
-


Vehicle Information
- Ext. color
- GRAY
- Int. color
- BLACK
- VIN
- JM3KFBCMXP0148126
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- LED Headlights
- Stability Control
- Seating
- Memory Seat
Dealer
Dyer Mazda SubaruReviews
Dyer Mazda Subaru review
The staff was awesome. Everyone was so nice, personable and there to assist me with any questions and made my purchase simple. My sales person Brock was excellent. Down to earth, personable, friendly and no pressure on any part of the sale. Highly recommend Brock and Dyer Subaru.
2023 Mazda CX-5 review
Best for handling, silky smooth and very refined. Great interior. Bullet proof reliability. Looks great. Mazda is now number one or safety. Surpassed Volvo. A very safe SUV for driving.
-


Vehicle Information
- Ext. color
- WHITE
- Int. color
- BLACK
- VIN
- JM3KKBHD7T1350589
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- Safety
- Blind Spot Monitor
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
Dealer
Dyer Mazda SubaruReviews
Dyer Mazda Subaru review
Cody, Lorraina and john in service were the best! A really great experience with a group of honest and sincere folks! I will not deal with any other dealer after this experience! Thank you
2026 Mazda CX-90 review
After owning several luxury SUV”s , the Mazda CX 90 with the inline 6 engine, is amazing and just as luxurious! The cabin is quiet the ride is smooth and have taken several road trips without any problems. We have been very impressed with the gas mileage on this AWD as well. The third row is ideal for anyone under 5.11, and it’s very convenient to have rear AC that can be controlled by rear passengers.
-


Vehicle Information
- Ext. color
- GRAY
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- VIN
- JM1NDAD71R0603186
Features
- Convenience
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Safety
- Backup Camera
- LED Headlights
Dealer
Dyer Mazda SubaruReviews
Dyer Mazda Subaru review
Dyer Subaru is outstanding. I dread buying a new car and keep them for a long time. I had the good fortune of having Dyer close to me so stopped in to look at a 2025 Impreza and a Crosstrek. I was also lucky to first encounter Lilly, an excellent salesperson with a great personality. I also met Allen, Zack, Madison, and Ryan. All pleasant, helpful, proactive introducing themselves and explaining their functions. I bought the Crosstrek and couldn?t be happier. I love this car! Cars have come a long way in thirteen years since I last bought one and the 2025 Crosstrek Premium has refined to the perfect car for me, just right. Love it. Thanks Dyer!
-





Vehicle Information
- Ext. color
- Black
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 26-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 70202250
- VIN
- JM1GL1VM7L1515079
Features
- Convenience
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
Dealer
CarMax Ft. LauderdaleReviews
CarMax Ft. Lauderdale review
It's all about your salesman... I had a great salesman no pressure very patient and as a result I ended up buying a car... My experience was very pleasurable and and the car I got was in perfect conditions. Very satisfied.... Highly recommend the dealership just make sure you get a good salesman.
2020 Mazda Mazda6 review
Wanted to upgrade from a Mazda3 (my 2nd) to more luxury and I got it with the Mazda6. Beautiful styling. Absolutely the most reliable and easy to care for car I have ever owned. Never fear to be on the road and I love the gas mileage.
-





$38,497
Est. $702/mo Jaguar Land Rover Ocala
Check Availability Vehicle Information
- Ext. color
- Artisan Red Premium
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- E-SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve con
- Stock #
- I239981
- VIN
- JM3KKEHA3S1239981
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Jaguar Land Rover OcalaReviews
Jaguar Land Rover Ocala review
Jake and Jason in the service department will always greet you with smile and professionalism. They always get the job done on time and willing to answer any questions you have.
2025 Mazda CX-90 PHEV review
We have owned 3 of the Mazda cx90 hybrids. Great comfortable and lots of room for the whole family. Looks great too. Highly recommend to anyone looking for a comfortable suv.
About Mazda
What is the cheapest Mazda vehicle available?
The Mazda Mazda6 is the cheapest available vehicle by average Cars.com listing price in Mazda's lineup, with an average listing price of $14,474.
Which Mazda vehicle has the best MPG?
The Mazda CX-50 Hybrid can reach up to 39 MPG city and 37 MPG highway for a combined rating of 38 MPG. The Mazda Mazda3 with traditional internal combustion engine offers up to 29 MPG city and 41 MPG highway for a combined rating of 33 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
Which Mazda vehicle has the longest range?
The electric Mazda MX-30 EV can travel up to 100 miles on a single charge depending on electric motor and battery options. The plug-in hybrid Mazda CX-70 PHEV can travel up to 30 electric-only miles before the gas engine kicks on.
EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.
Which Mazda vehicle has the most deals?
The Mazda CX-5 has the most available deals on Cars.com with 1857 great deals out of 9290 listings starting at $3,300.
Where can I find the most Mazda deals?
The most Mazda deals can be found near Wabasso, FL with 6 great deals out of 58 listings starting at $12,099.
Used Mazda by price
Used Mazda by city
-
Used Mazda in Vero Beach, FL
5 Great Deals out of 28 listings starting at $12,099
-
Used Mazda in Florida Ridge, FL
5 Great Deals out of 28 listings starting at $12,099
-
Used Mazda in Gifford, FL
5 Great Deals out of 29 listings starting at $12,099
-
Used Mazda in South Beach, FL
5 Great Deals out of 28 listings starting at $12,099
-
Used Mazda in West Vero Corridor, FL
5 Great Deals out of 29 listings starting at $12,099
-
Used Mazda in Lakewood Park, FL
5 Great Deals out of 34 listings starting at $12,099
-
Used Mazda in Indian River Shores, FL
5 Great Deals out of 29 listings starting at $12,099
-
Used Mazda in Winter Beach, FL
6 Great Deals out of 55 listings starting at $12,099
-
Used Mazda in Wabasso, FL
6 Great Deals out of 58 listings starting at $12,099
-
Used Mazda in Saint Lucie Village, FL
5 Great Deals out of 34 listings starting at $12,099
-
Used Mazda in St. Lucie Village, FL
5 Great Deals out of 34 listings starting at $12,099
-
Used Mazda in Wabasso Beach, FL
6 Great Deals out of 58 listings starting at $12,099
Used Mazda by body style
- Used Mazda SUVs for sale in Vero Beach South, FL
- Used Mazda sedans for sale in Vero Beach South, FL
- Used Mazda hatchbacks for sale in Vero Beach South, FL
- Used Mazda convertibles for sale in Vero Beach South, FL
- Used Mazda wagons for sale in Vero Beach South, FL
- Used Mazda coupes for sale in Vero Beach South, FL
- Used Mazda passenger vans for sale in Vero Beach South, FL