New and used 2026 Chrysler Pacifica for sale near Thiensville, WI
-





$50,154
MSRP $57,315
Est. $902/mo Griffin's Hub Chrysler Jeep Dodge
Check Availability Quick view Vehicle Information
- Ext. color
- Silver Mist Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- 326021
- VIN
- 2C4RC3GG4TR207617
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Griffin's Hub Chrysler Jeep Dodge -





$49,750
MSRP $54,885
Est. $895/mo Russ Darrow West Bend Chrysler Jeep Dodge RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Hydro Blue Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C66013
- VIN
- 2C4RC1GG0TR222815
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow West Bend Chrysler Jeep Dodge RAMReviews
Russ Darrow West Bend Chrysler Jeep Dodge RAM review
Everyone was very helpful and informative. Also was always able to answer the numerous questions I had as I had never bought a car before
-





$46,825
MSRP $55,740
Est. $842/mo City Chrysler Dodge Jeep Ram Fiat of Brookfield
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- B604
- VIN
- 2C4RC3GG6TR174359
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
City Chrysler Dodge Jeep Ram Fiat of BrookfieldReviews
City Chrysler Dodge Jeep Ram Fiat of Brookfield review
Thank you Willow and the rest of the sales team. Were very happy with our new vehicle
-





$45,250
MSRP $50,175
Est. $814/mo Russ Darrow West Bend Chrysler Jeep Dodge RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Hydro Blue Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C66012
- VIN
- 2C4RC1BG6TR222812
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow West Bend Chrysler Jeep Dodge RAMReviews
Russ Darrow West Bend Chrysler Jeep Dodge RAM review
Nice buying experience. Wonderful salesman . Got my car I wanted. Would recommend this Russ Darrow Dealership for anyone wanting a nice vehicle. Very nice car !!!
-





$45,447
MSRP $52,380
Est. $817/mo Wilde Chrysler Dodge Jeep Ram
Check Availability Quick view Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 3.6L V6 24V MPFI DOHC
- Stock #
- TR152758
- VIN
- 2C4RC1GG3TR152758
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Wilde Chrysler Dodge Jeep RamReviews
Wilde Chrysler Dodge Jeep Ram review
Our salesperson, Elijah, did a great job. When picking up our purchase, he spent as much time with us on a used Jeep GC as a new one. Demonstrating the vehicle features and connecting our phones to uConnect. Patiently and without being overbearing, I was impressed and would recommend him and the dealership.
-





$48,844
MSRP $52,725
Est. $879/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Silver Mist Clearcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26015
- VIN
- 2C4RC1GG2TR206972
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAMReviews
Russ Darrow Metro Chrysler Dodge Jeep RAM review
I was in the market to replace my 13-year-old Jeep Liberty and I've had my eye on the Renegade for the past year or so. I worked with an awesome sales guy who was patient and answered all of my questions. Russ Darrow had an amazing inventory compared to some other dealerships.
-





$43,545
MSRP $50,635
Est. $783/mo Griffin's Hub Chrysler Jeep Dodge
Check Availability Quick view Vehicle Information
- Ext. color
- Silver Mist Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- 326011
- VIN
- 2C4RC3BGXTR188238
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Griffin's Hub Chrysler Jeep DodgeReviews
Griffin's Hub Chrysler Jeep Dodge review
Worked with Johnny very professional, kind and helpful. Give him a big raise!!! He us great 10 all across the board.
-





$44,036
MSRP $47,135
Est. $792/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26027
- VIN
- 2C4RC1BGXTR240939
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAMReviews
Russ Darrow Metro Chrysler Dodge Jeep RAM review
Gary Smith was wonderful to work with and very knowledgeable about my vehicle. I will be recommending and using his services in the future. The staff at Russ Darrow made car buying easy!
-





Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C3593
- VIN
- 2C4RC1BG1TR251148
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Third Row Seating
Dealer
Uptown MotorcarsReviews
Uptown Motorcars review
Good service. Great Service Manager! Always pleasant!
-





$44,290
MSRP $49,455
Est. $797/mo Ewald Chrysler Jeep Dodge RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Red
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-25
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 3.6L V6 24V MPFI DOHC
- Stock #
- CT111
- VIN
- 2C4RC3BG9TR159331
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Jeep Dodge RAMReviews
Ewald Chrysler Jeep Dodge RAM review
Kudos to my salesman Howard Robinson on customer service and follow up. Great person to work with and a great resource for information on my Pacifica
-





$49,507
Est. $890/mo Amato Chrysler Jeep Dodge Ram
Check Availability Quick view Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- 3.6L V6 24V VVT
- Stock #
- J3473
- VIN
- 2C4RC3GG1TR219076
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Amato Chrysler Jeep Dodge RamReviews
Amato Chrysler Jeep Dodge Ram review
Ayinde Garry is genuine and passionate about customer satisfaction. He’s very knowledgeable and professional. I would refer him to many others because he’s really detailed when explaining each question that’s asked without being misleading.
-





$47,770
MSRP $56,810
Est. $859/mo City Chrysler Dodge Jeep Ram Fiat of Brookfield
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- B558
- VIN
- 2C4RC3GG8TR174153
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
City Chrysler Dodge Jeep Ram Fiat of BrookfieldReviews
City Chrysler Dodge Jeep Ram Fiat of Brookfield review
As a woman going to buy car alone it’s a bit intimidating, but NOT when your sales rep is as awesome and knowledgeable and sweet as Willow. I appreciate you making me feel at ease and being such a great saleswoman keep up the great work you’re definitely a keeper! Love my jeep journey with you!
-





$49,962
MSRP $54,025
Est. $899/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26014
- VIN
- 2C4RC1GG2TR202307
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAMReviews
Russ Darrow Metro Chrysler Dodge Jeep RAM review
Very pleasant auto buying experience. Great people to talk with and fair in their negotiations. I pointed out a scrape on the vehicle and they made a fair adjustment. It was the perfect buying experience … until I woke up this morning. I went out to wash the bugs off from driving home the night before and found several breaks and cracks in the grill and fender that I didn’t notice when I bought it the night before. They of course didn’t point them out to me. All I can say is, “Shame on me,”. My responsibility for not looking it over more closely. My bad not them. Buyers Beware! Look over every inch, twice. Everything is made of plastic these days.
-





$45,500
MSRP $48,680
Est. $818/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Hydro Blue Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26024
- VIN
- 2C4RC1BG4TR240936
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAMReviews
Russ Darrow Metro Chrysler Dodge Jeep RAM review
I bought my 2022 Wagoneer this week and could not have been happier with the entire experience. Joe, Brian, Chris, Krissy, and the finance team we’re all phenomenal. I have a lot of vehicle purchases under my belt and this team has without a doubt been the best. They have earned our business for years to come. Thanks to everyone on the team for making us feel like more than just a sale.
-





$43,590
MSRP $49,825
Est. $784/mo Wilde Chrysler Dodge Jeep Ram
Check Availability Quick view Vehicle Information
- Ext. color
- Silver Mist Clearcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 3.6L V6 24V MPFI DOHC
- Stock #
- TR237538
- VIN
- 2C4RC1BGXTR237538
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Wilde Chrysler Dodge Jeep RamReviews
Wilde Chrysler Dodge Jeep Ram review
Dealt with Ryan in Sales and Jeana in financing. Two of the best people I've ever worked with. Ryan went well above and beyond trying to make my experience pleasurable. He is the hardest, most sincere salesperson I've ever had the privilege of dealing with. I wish all sales people had his character and work ethic! Jeana was an absolute sweetheart in financial. She didn't try to sell me anything extra, just the basics to keep me covered. You can tell she loves just helping people get only what they need. High quality character and an absolute pleasure to "work" with!
-





$42,554
MSRP $49,730
Est. $765/mo Griffin's Hub Chrysler Jeep Dodge
Check Availability Quick view Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- 326030
- VIN
- 2C4RC1BG2TR198234
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Griffin's Hub Chrysler Jeep Dodge -





$50,961
MSRP $57,135
Est. $917/mo Uptown Motorcars
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C3568
- VIN
- 2C4RC3GGXTR219433
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Uptown MotorcarsReviews
Uptown Motorcars review
I purchased a new Jeep Wrangler Rubicon X from Uptown. The entire experience was incredibly positive. There was no pressure. My trade in value was fair. Overall I was very pleased with my purchase and the process of buying the vehicle.
-





$41,038
MSRP $46,935
Est. $738/mo 5 Corners Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- 46211
- VIN
- 2C4RC1BG1TR264921
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
5 Corners Chrysler Dodge Jeep RAMReviews
5 Corners Chrysler Dodge Jeep RAM review
Great purchasing experience working with both Jim and Spike. 2nd vehicle purchased here and will definitely be back in the future for the next!
-





$47,107
MSRP $52,350
Est. $847/mo Ewald Chrysler Jeep Dodge RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Red
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-25
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 3.6L V6 24V MPFI DOHC
- Stock #
- CT132
- VIN
- 2C4RC3BG7TR174121
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Jeep Dodge RAMReviews
Ewald Chrysler Jeep Dodge RAM review
Bob Groover is amazing, he is an authority on ram trucks and I truly appreciate his expertise. Ewald is a great dealership, and I plan to come back!
-





$49,180
MSRP $49,180
Est. $885/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26035
- VIN
- 2C4RC1BG1TR251215
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAM -





$47,138
MSRP $52,675
Est. $848/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT117
- VIN
- 2C4RC1BG9TR157843
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of Oconomowoc -





$46,867
MSRP $52,085
Est. $843/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT142
- VIN
- 2C4RC3BG4TR203042
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of Oconomowoc -





$45,563
MSRP $50,635
Est. $820/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT133
- VIN
- 2C4RC3BG5TR174327
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of OconomowocReviews
Ewald Chrysler Dodge Jeep Ram of Oconomowoc review
Had a great experience buying 2 new cars from Stevie Weed! It was an easy going experience that I would recommend to anyone looking!
-





$52,809
MSRP $57,245
Est. $950/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Diamond Black Crystal Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT143
- VIN
- 2C4RC3GG5TR207531
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of OconomowocReviews
Ewald Chrysler Dodge Jeep Ram of Oconomowoc review
THIS WAS AN OFF SITE WAREHOUSE SALE. I LOOKED AT A USED TRUCK. IT WASN'T WHAT I WAS LOOKING FOR. THE SALES PEOPLE WERE VERY POLITE AND FRIENDLY. AND NO HIGH PRESSURE. IT WAS A PLEASANT EXPERIENCE MORE THAN AT MOST USED CAR SALES.
-





$45,117
MSRP $50,140
Est. $811/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT123
- VIN
- 2C4RC3BG6TR173963
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of OconomowocReviews
Ewald Chrysler Dodge Jeep Ram of Oconomowoc review
Chris C. was curtious knowlegeable and showed a serious concern for my purchase. His willingness to give me options and understand what i want and needed. He was a good listener!!
-





$54,945
MSRP $54,945
Est. $988/mo Russ Darrow Metro Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- C26029
- VIN
- 2C4RC3GG2TR248778
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Russ Darrow Metro Chrysler Dodge Jeep RAMReviews
Russ Darrow Metro Chrysler Dodge Jeep RAM review
Only dealership in milwaukee that had the car i was looking for and was patient enough with me to ensure i pulled off in the vehicle of my choice. as a first time buyer, i was very satisfied with their service.
-





$41,491
MSRP $46,360
Est. $746/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT126
- VIN
- 2C4RC1BG1TR180856
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of OconomowocReviews
Ewald Chrysler Dodge Jeep Ram of Oconomowoc review
Very happy with my jeep! Came in to the dealership not knowing 100% what I wanted . Shannon, and Anthony were very helpful in explaining my options and available features in upgrading my vehicle that better fit my needs and driving habits. My family has bought several cars from Ewald and we know and trust that we are getting a good deal and a great vehicle when we work with Shannon . She is very knowledgable and makes sure we feel comfortable with our decision . We won't shop anywhere else ! The people at Ewald make buying a car not such a headache!
-





$43,924
MSRP $48,855
Est. $790/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Red Hot Pearlcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT134
- VIN
- 2C4RC3BG1TR188225
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of Oconomowoc -





$39,791
MSRP $49,835
Est. $716/mo Ewald Chrysler Dodge Jeep Ram of Oconomowoc
Check Availability Quick view Vehicle Information
- Ext. color
- Silver Mist Clearcoat
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- 9-Speed 948TE Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, VVT variable valve control, regular unl
- Stock #
- CT124
- VIN
- 2C4RC3BG7TR174328
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Ewald Chrysler Dodge Jeep Ram of OconomowocReviews
Ewald Chrysler Dodge Jeep Ram of Oconomowoc review
Caitlyn Sadowske and her associates at Ewald Dodge in Oconomowoc made the purchase of my new Durango one of the most pleasant buying experiences I have ever had. She listened intently and communicated throughout the process, focusing on my needs and concerns and alleviating them one by one. She was the consummate professional and I recommend her and Manager Pete Espinoza highly!
-





$52,704
MSRP $52,400
Est. $948/mo Extreme Chrysler Dodge Jeep RAM
Check Availability Quick view Vehicle Information
- Ext. color
- Red
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-25
- Fuel type
- Gasoline
- Transmission
- 9-Speed Automatic
- Engine
- 3.6L V6 24V MPFI DOHC
- Stock #
- P774
- VIN
- 2C4RC3BG8TR256245
Features
- Convenience
- Adaptive Cruise Control
- Heated Steering Wheel
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Extreme Chrysler Dodge Jeep RAMReviews
Extreme Chrysler Dodge Jeep RAM review
My experience with Extreme was fantastic! The salesman (Jarred) was polite. I asked that we handle most everything via email due to my work schedule and he was respectful of that. He was not pushy. He always responded in a timely fashion. Answered all questions I had and made sure I got the best finance rate possible. I couldn’t be happier. I would absolutely buy from Extreme and Jarred again. I could not be happier.
-





Quick view Vehicle Information
- Ext. color
- Black
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 19-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 28735460
- VIN
- 2C4RC1BGXTR180239
Features
- Convenience
- Heated Steering Wheel
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Third Row Seating
Dealer
CarMax IndianapolisReviews
CarMax Indianapolis review
A coworker Carmax to me. I enjoyed that you could walk around the lot and actually get inside the vehicles to check them out. No one followed you around the entire time unless you wanted them to. If needed I'd buy and shop here again. The salesman Britt P. was pleasant to work with too. I wanted a better finance rate because my credit score told me I could get one. I was advised to check around. In the end I was able to get a lower rate from another source and get the vehicle I wanted. I'm scheduled for some detail work on the vehicle and I trust it will be done well too.
Chrysler Pacifica prices by year
| Model year | Average price | Deals |
|---|---|---|
| 2027 Chrysler Pacifica | $50,075 | |
| 2024 Chrysler Pacifica | $27,409 |
|
| 2023 Chrysler Pacifica | $25,956 |
|
| 2021 Chrysler Pacifica | $25,644 |
|
About the 2026 Chrysler Pacifica
Select FWD shown (base trim).
- Seating
- 8
- Door count
- 4
- Drivetrain
- Front-wheel drive
- Combined MPG
- 22
- Transmission
- 9-Speed A/T
- Engine
- 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel)
How much does the 2026 Chrysler Pacifica cost?
The 2026 Chrysler Pacifica price depends on trim level and optional features. Prices typically start at $44,445 and go as high as $59,440 for fully loaded models.
What is the MPG of the 2026 Chrysler Pacifica?
The 2026 Chrysler Pacifica offers up to 19 MPG in city driving and 28 MPG on the highway for a combined rating of 22 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle trim, driving conditions, driving habits, vehicle maintenance, and other factors.
What are some similar vehicles and competitors of the 2026 Chrysler Pacifica?
The 2026 Chrysler Pacifica compares to and/or competes against the following vehicles:
Is the 2026 Chrysler Pacifica reliable?
The 2026 Chrysler Pacifica has an average reliability rating of 5 out of 5 according to Cars.com consumers. Find real-world reliability insights within consumer reviews from 2026 Pacifica owners.
Is the 2026 Chrysler Pacifica a good minivan?
Below are the Cars.com consumer ratings for the 2026 Chrysler Pacifica.
- Comfort
- 5.0
- Interior
- 4.0
- Performance
- 5.0
- Value
- 4.0
- Exterior
- 5.0
- Reliability
- 5.0
100% of drivers recommend this car
- Comfort
- 5.0
- Interior
- 4.0
- Performance
- 5.0
- Value
- 4.0
- Exterior
- 5.0
- Reliability
- 5.0
Limited (2 styles)
| Style | |
|---|---|
| Limited FWD | Limited AWD |
| Inventory price | |
| Starting at $49,605 | Starting at $52,950 |
| Combined MPG | |
| 22 | 22 |
| Engine | |
| 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) | 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) |
Pinnacle (2 styles)
| Style | |
|---|---|
| Pinnacle AWD | Pinnacle FWD |
| Inventory price | |
| Starting at $59,440 | Starting at $56,095 |
| Combined MPG | |
| 22 | 22 |
| Engine | |
| 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) | 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) |
Select (2 styles)
| Style | |
|---|---|
| Select AWD | Select FWD |
| Inventory price | |
| Starting at $47,790 | Starting at $44,445 |
| Combined MPG | |
| 22 | 22 |
| Engine | |
| 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) | 287.0-hp, 3.6-liter, V6 Cylinder Engine (Gasoline Fuel) |
Similar Cars
-
Honda Odyssey for sale
1 Great Deal out of 89 listings starting at $35,900
-
Kia Carnival for sale
60 listings starting at $37,887
Research the 2026 Chrysler Pacifica
Compare the 2026 Chrysler Pacifica
2026 Chrysler Pacifica by city
-
2026 Chrysler Pacifica in Mequon, WI
125 listings starting at $39,091
-
2026 Chrysler Pacifica in Brown Deer, WI
136 listings starting at $34,999
-
2026 Chrysler Pacifica in Cedarburg, WI
125 listings starting at $39,091
-
2026 Chrysler Pacifica in River Hills, WI
136 listings starting at $34,999
-
2026 Chrysler Pacifica in Bayside, WI
125 listings starting at $39,091
-
2026 Chrysler Pacifica in Grafton, WI
139 listings starting at $37,234
-
2026 Chrysler Pacifica in Fox Point, WI
136 listings starting at $34,999
-
2026 Chrysler Pacifica in Germantown, WI
145 listings starting at $34,999
-
2026 Chrysler Pacifica in Glendale, WI
146 listings starting at $34,999
-
2026 Chrysler Pacifica in Whitefish Bay, WI
146 listings starting at $34,999
-
2026 Chrysler Pacifica in Menomonee Falls, WI
145 listings starting at $34,999
-
2026 Chrysler Pacifica in Butler, WI
151 listings starting at $34,999
Chrysler Pacifica trims
-
Chrysler Pacifica 2026 Select AWD
46 listings starting at $39,791
-
Chrysler Pacifica 2026 Select FWD
40 listings starting at $39,091
-
Chrysler Pacifica 2026 Limited AWD
23 listings starting at $46,825