Used BMW 530 for sale near Lantana, FL
-
-





Vehicle Information
- Ext. color
- Bluestone Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- L260819223T1
- VIN
- WBAJR3C04LCE61924
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Wayne Akers FordReviews
Wayne Akers Ford review
The salesman Ronaldo Santiago was nothing but a gentleman treated me like I was special I would recommend him to anyone he was very honest and loyal
2020 BMW 530 review
This car did meet all my requirements in a new car. It has the power and speed of the M series. The ride and handling are exceptional. The interior styling with blue stitching on the black leather is a class-act.
-





Vehicle Information
- Ext. color
- Glacier Silver Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 24-34
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- U10672A
- VIN
- WBAJA5C57KBX46925
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- CD Player
- Premium Sound System
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Gunther Volkswagen Pompano BeachReviews
2019 BMW 530 review
The car is absolutely beautiful. My wife and I are thrilled with the vehicle purchase. The car lives up to its name in style and performance. I’m looking forward to enjoying my birthday gift for a very long time.
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- CSM92855
- VIN
- WBA53BH00PCM92855
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Lou Bachrodt Chevrolet Coconut CreekReviews
Lou Bachrodt Chevrolet Coconut Creek review
Even though I didn’t buy my car here, I decided to bring it to Lou Bachrodt for its regular maintenance because, while the sales experience at my original dealership was great, their service department and maintenance were completely unsatisfactory. Making that switch was the best decision! From the moment I arrived, they welcomed me warmly. The service was impeccable, communication was constant throughout the process, and everyone was always smiling and professional. Highly recommended!
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- WY25274
- VIN
- WBA53BH05PWY25274
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW/Mini of Coconut CreekReviews
BMW/Mini of Coconut Creek review
Do your self a favor and ask for Mike (Michael E Loiselle) I highly recommend this salesman and dealership to all my friends and family! It’s hard to car Mike a salesman when he wasn’t never trying to sell me anything, he wanted me to get the exactly what I was looking for. My experience was outstanding, thanks to my salesman, Mike. From start to finish, he was incredibly professional and patient. He took the time to understand exactly what I was looking for and never pressured me into making a decision. Instead, he genuinely cared about helping me find the right vehicle that would make me happy. It’s rare to find a salesman who prioritizes customer satisfaction over a quick sale, but Mike truly did. If you’re looking for an stress-free, enjoyable car-buying experience, this is the place to go!
-





Vehicle Information
- Ext. color
- Bluestone Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- L260819223T1
- VIN
- WBAJR3C04LCE61924
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Wayne Akers FordReviews
Wayne Akers Ford review
The salesman Ronaldo Santiago was nothing but a gentleman treated me like I was special I would recommend him to anyone he was very honest and loyal
2020 BMW 530 review
This car did meet all my requirements in a new car. It has the power and speed of the M series. The ride and handling are exceptional. The interior styling with blue stitching on the black leather is a class-act.
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 24-34
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- KWA58004
- VIN
- WBAJA5C52KWA58004
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Apple CarPlay®
- Bluetooth®
- CD Player
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Mercedes-Benz of Coconut CreekReviews
Mercedes-Benz of Coconut Creek review
I had an absolutely amazing experience with Jeff at Mercedes Benz of Coconut Creek. From start to finish it was a wonderful decision. I am in love with my new car!
2019 BMW 530 review
This car went beyond my expectations. From the autobahns of Germany to the potholed, unrepaired streets and highways I have to drive here in the US along with avoiding those who drive without any regard for others being on the road my car has performed.
-
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Canberra Beige
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- PCN07104
- VIN
- WBA53BH0XPCN07104
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Delray BeachReviews
BMW of Delray Beach review
Great advisor helped me with latest visit to BMW Delrey Beach. Went of tye 2 recalls. And they did quick oil change as well. A+++
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Smoke
- Drivetrain
- Rear-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- BC-PF36048
- VIN
- WBA43FJ00RCN94933
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW West Palm BeachReviews
BMW West Palm Beach review
I was looking t buy a used car and honestly all the persons me my husband talked at the dealership were very helpful.I would recommend everyone to go and check them out .
-





Vehicle Information
- Ext. color
- Blue Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 24-31
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- GL33380A
- VIN
- WBAJR7C08LCD74597
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Lincoln of Coconut CreekReviews
Lincoln of Coconut Creek review
Great experience. Negotiated a good price for my Lincoln Nautilus. The purchasing process was seamless. I was helped by Lisa and Ryan who provided excellent customer service.
2020 BMW 530 review
Car handles very well, standard features like backup cam, blind spot warning light & signal is great . I recommended this vehicle to a close friend. hope they come to see you guys!!!
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 164038
- VIN
- WBAJA7C56JWA71168
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- CD Player
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of West Palm BeachReviews
Carvix of West Palm Beach review
Thank you Brandon at Florida fine cars. You are the best sales person I’ve dealt with.
2018 BMW 530 review
As a retired Automotive Professional I've driven literally hundreds of car over my 40 year career. So, I decided as a retirement present to myself, I would go luxury this time. I bought mine certified pre-owned with only 15,000 miles on it. The quietness, the handling, are as good or better than anything. When passing, the acceleration is smooth and clean. The only drawback is that if you don't pay attention, you'll find yourself going 80.
-





Vehicle Information
- Ext. color
- Glacier Silver Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- 162676
- VIN
- WBA53BH00MCF82361
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of MargateReviews
Carvix of Margate review
Service orientated staff. Easy going atmosphere, quick transaction once all is finalized, would recommend this dealership.
2021 BMW 530 review
So well designed, engineered, and manufactured, just an awesome sedan, well worth it! CPO purchase means great warranty and at the same time avoiding a 40% depreciation if bought new!
-
$65,900
New 2027 BMW 530 i
$74,084
New 2027 BMW 530 i xDrive
$71,134
New 2027 BMW 530 i xDrive
$70,840
New 2027 BMW 530i
$70,140
New 2027 BMW 530i
$68,540
New 2027 BMW 530i
$69,540
New 2027 BMW 530i
$72,184
New 2027 BMW 530i
$72,700
New 2027 BMW 530 i
$66,140
New 2027 BMW 530i
$66,003
New 2027 BMW 530 i
$65,140
New 2027 BMW 530i -





Vehicle Information
- Ext. color
- Blue
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29148135
- VIN
- WBA53FJ07TCV72102
Features
- Convenience
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax Boynton BeachReviews
CarMax Boynton Beach review
Found a great deal on an Infiniti G37 but wanted my wife to check it out first. When we went the next day it was gone! While there, however, I learned about their terrific warranty plans so when when we saw the car I really wanted - a Jaguar XK - I didn't hesitate, knowing their warranty would ease any concerns I might have about this expensive-to-repair car. Again, when I went to this same location it had disappeared from their website! A helpful saleswoman told me one of their managers was driving it but it was mine if I wanted it - and I did!
-
-





Vehicle Information
- Ext. color
- White
- Int. color
- BROWN
- Drivetrain
- Four-wheel Drive
- MPG
- 23-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 70300904
- VIN
- WBAJA7C5XKWW20045
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax Sample Rd (Pompano Beach)Reviews
CarMax Sample Rd (Pompano Beach) review
On December 23rd of 2016 I purchased a 2014 Jeep Patriot from the Pompano Beach Carmax (Sample Road). My wife is pregnant and will soon give birth to our first child. Before this we were a one car family with a Fiat 500 and my wife was very concerned about not having a car to bring baby boy home from the hospital in, not to mention to make it to all of the Doctor appointments for wellness checks in. So, I decided why not make the purchase a Christmas present/surprise since we needed one anyways! Only problem was I had this revelation on Wednesday December 21, 2016 and Carmax was to be closed on the 24th and 25th for Christmas. The real issue was that the perfect car (She had been wanting a white Patriot for a few years now) was all the way in Clearwater, FL... some 250 miles away. I was told by the sales rep at Pompano Beach that while it was possible the car may be there by Friday, in time for me to pick up prior to Christmas, it was in no way a certainty. I then contacted the Clearwater store to speak with someone who handles the outgoing shipments and he basically told me that it was not going to happen. From my understanding, the way it works with Carmax is when the car you want is at a location less than 200 miles Carmax will do the shipping itself and it usually takes 1-3 days. But when it is further than that they outsource to carrier companies. In that case they have to wait until they have enough cars to send to make it economical for them to do so and also deal with bidding/price hunting etc... which complicates the who thing and makes everything take much longer. After learning all of this I gave the corporate office a call and got in touch with a Emilee, an analyst from the Carmax Customer Care Team. I explained my situation and how much it would mean to my wife and I (both in the form of glee for her and reduced anxiety for the both of us) if they could somehow get the car to Pompano Beach in time for me to pick up on Friday. Before the end of the week Emilee had gotten a whole team of people in the corporate office working on getting the car to us in time. I received telephone updates from her all along the way. By Thursday afternoon I received an email informing me that the car was in transit, followed by a call from Emilee letting me know that everything worked out and the car should be there Thursday evening or Friday morning and a call from the Sales Manager at the Pompano Beach store letting me know that he had spoken to Emilee and once the car arrived they were going to expedite the "unpacking" and everything that that entails. The real cherry on top came on January 3rd when my wife received a FedEx package while I was at work. Inside she found a set of very nice swaddling blankets and a card that read: "Chris, Thank you so much for letting our Pompano Beach Team help you find your new-to-you Jeep Patriot for your growing family! Here's a small token from CarMax to welcome your new addition. We hope your Jeep Patriot takes you on incredible new adventures! Sincerely, Emilee, Your CarMax Customer Care Team" Everyone was super amazing and I could not be more grateful for the professional and caring people at both the local Sample Road Pompano Beach Store and the Corporate office. Thanks to Cristy (Pompano Beach sales rep) as well for making the whole process and painless as possible. As a side note: The Patriot was absolutely immaculate inside and out despite having 27k miles on it, my wife would have sworn it was new before she saw the odemeter... She was happy I saved us some money ;)
2019 BMW 530 review
Almost 4 years of driving experience, 35000 km , reliable, gas saving, quiet and comfortable.fast , but you need to add premium gas, generally, this car is a great choice
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L 4 CYLINDER
- Stock #
- P13207
- VIN
- WBA53BH06MCF78038
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Presidential Auto Sales & ServiceReviews
Presidential Auto Sales & Service review
Fabulous Experience with Jennifer in the Sales Department. She made the process seamless and pain-free.
2021 BMW 530 review
Purchased a 2021 cert pre-owned from dealer w/ 26k miles. 530i xdrive, car handles like a true Beamer, so tight and feels great driving. A little disappointed the entire 5-series class isn't 6 cylinder however the 4 turbo feels like one anyways, only with improved gas mileage, so not really a compliant just a preference. The dealer recommended using premium fuel, and I use it maybe once a month to keep the engine running smooth and also 10k in between oil changes. Pretty nice! Would absolutely purchase again. Next major service at 80k as well.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Mocha
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- CSY16651
- VIN
- WBA53BH08PWY16651
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Lou Bachrodt Chevrolet Coconut CreekReviews
Lou Bachrodt Chevrolet Coconut Creek review
Sam Mercado is a true professional. Sam address’s all issues, answers any questions l might have and makes me as a customer feel comfortable.
-





Vehicle Information
- Ext. color
- White
- Int. color
- Brown
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- A57280
- VIN
- WBAJA5C51JWA57280
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
AUTOVEND USA LLCReviews
2018 BMW 530 review
I love my BMW 5-Series highly recommended I purchased it at Park Place Of NJ and they were very helpful on helping me with everything I needed to know about my car ,so if you need a car go and see them ask for Wilfredo he was very helpful
-





Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- BC-PF36151
- VIN
- WBA43FJ01RCP79976
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW West Palm BeachReviews
BMW West Palm Beach review
I bought my first Rolls Royce from Braman forty years ago. Since them I have bought many sports cars. When I decided to buy another luxury sedan I returned to Braman. I can honestly say that the exceptional service, sensitivity to customers needs and vehicle knowledge have remained the same over 40 years. Everyone at the dealer from owner, to GM to sales manager to salesperson has been exceptional. Whether your looking for Rolls Royce, Bentley, Porshe, or BMW, Bramen of Palm Beach should be your only place to shop.
-





Vehicle Information
- Ext. color
- Carbon Black Metallic
- Int. color
- Canberra Beige
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- 161811
- VIN
- WBA13BJ00PCN28343
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of MargateReviews
Carvix of Margate review
Cody was my salesperson. And he found us the perfect vehicle for our business. We are so happy and our customers will be too. Thank you
-





Vehicle Information
- Ext. color
- Dark Graphite Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- 162354
- VIN
- WBA13BJ08PCN28848
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of West Palm BeachReviews
Carvix of West Palm Beach review
Jean Delia made our car-buying experience fantastic! He treated us with respect, took the time to explain everything clearly, and never rushed or pressured us. He really cares about his customers, answer my text after the sales and assist my son when the vehicle needs service. We couldn't be happier!
-





Vehicle Information
- Ext. color
- Dark Graphite
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 28-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- 9600796A
- VIN
- WBA43FJ01TCV71832
Features
- Convenience
- Automatic Parking
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW/Mini of Coconut CreekReviews
BMW/Mini of Coconut Creek review
Showed up late in the rain Fred was very attentive, courteous and patient showing me the car
-





Vehicle Information
- Ext. color
- Bluestone Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- L260819223T1
- VIN
- WBAJR3C04LCE61924
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Wayne Akers FordReviews
Wayne Akers Ford review
The salesman Ronaldo Santiago was nothing but a gentleman treated me like I was special I would recommend him to anyone he was very honest and loyal
2020 BMW 530 review
This car did meet all my requirements in a new car. It has the power and speed of the M series. The ride and handling are exceptional. The interior styling with blue stitching on the black leather is a class-act.
-





Vehicle Information
- Ext. color
- Bernina Grey Amber Effect Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- TPC007
- VIN
- WBA53BH01MCF28955
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
The Platinum Collection LLCReviews
The Platinum Collection LLC review
If you havent come to take a look at this place you are likely missing out on the best deals on high fashionable cars... I got mine today and it was a deal Im comfortable with, Hope this helps anyone to make its mind
2021 BMW 530 review
It handles well, has safety features that is important , and accelerates well in traffic. The car stereo, leather seats and heated seating and steering wheel is comforting.
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- TPC254
- VIN
- WBA53BH00MWX19164
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
The Platinum Collection LLCReviews
The Platinum Collection LLC review
Patronn's the guy people should go to if people are looking for classy cars and this place is full of them... Thank you guys!
2021 BMW 530 review
Smooth riding with good road handling. Lots of electronics to personalize the driving experience. Inside trim was great and functional .Outside was sleek and . Happy to drive and be seen in this car
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- TPC096
- VIN
- WBA53BH0XNWX53100
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
The Platinum Collection LLCReviews
The Platinum Collection LLC review
I felt like a kid in a candy store, when I first visited their showroom! The cars there were exceptional! High quality, Hi-Line vehicles that would many anyone excited to see, drive and buy! Thank you Rick and the rest of the staff…. You came thru and made my time there, trading in my car and buying another, a great experience! Thanks…
-





Vehicle Information
- Ext. color
- Aventurin Red Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 23-32
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- TPC256
- VIN
- WBA13BJ09PCN01397
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
The Platinum Collection LLCReviews
The Platinum Collection LLC review
They were knowledgeable, patient, and truly understood what I was looking for in a car. They took the time to explain everything, which I really appreciated. Highly recommend!
-
Vehicle Information
- Ext. color
- Alpine White
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- PWY17173
- VIN
- WBA53BH03PWY17173
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Delray BeachReviews
BMW of Delray Beach review
Excellent service department! My car is never rushed. The sunroof was leaking and Delray BMW unclogged the sunroof drains. No more leaks from the sunroof.
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Smoke
- Drivetrain
- Rear-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- BC-PF36048
- VIN
- WBA43FJ00RCN94933
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW West Palm BeachReviews
BMW West Palm Beach review
I was looking t buy a used car and honestly all the persons me my husband talked at the dealership were very helpful.I would recommend everyone to go and check them out .
-





Vehicle Information
- Ext. color
- Glacier Silver Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- 163541
- VIN
- WBA53BH0XMWX22931
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of OrlandoReviews
Carvix of Orlando review
Juan did a great work, I will remember to anyone 100% , nice dealer very clean
-





Vehicle Information
- Ext. color
- Blue
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 28629978
- VIN
- WBA53BH05PWY15778
Features
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
Dealer
CarMax OrlandoReviews
CarMax Orlando review
I traded in a 6 month old Lexus hybrid for a Mitsibushi lancer. I paid $20k for the lexus and my 16 year old pretended to like it but he hated it. It was a lame hybrid and his friends laughed at him. So before he even got his license and had only added 400 miles to the car I took it back. Eliot got me a deal on a Mitsibushi with 19,000 miles. The trade in came back at $14,000. Eliot WENT BACK AND GOT ME A BETTER DEAL! because I was a previous Carmax customer. I ended up with a 5 year warranty on the Mitsubishi and a $700 refund... You cannot beat Carmax. If you buy cars from this dealership THEY LOOK AFTER YOU. Genuine customer.
-
-





$57,680
Est. $1,047/mo Miami Lakes Automall - Chevrolet Kia Dodge Chrysler Jeep Ram Mitsubishi
Check Availability Vehicle Information
- Drivetrain
- Rear-wheel Drive
- MPG
- 29-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- JR6059
- VIN
- WBA43FJ0XVCX76892
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Miami Lakes Automall - Chevrolet Kia Dodge Chrysler Jeep Ram MitsubishiReviews
Miami Lakes Automall - Chevrolet Kia Dodge Chrysler Jeep Ram Mitsubishi review
Thank you to Jorge & Enrique at the Mitsubishi service center for excellent service & kindness. It was a pleasure.
-





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 28-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- VP2741
- VIN
- WBA43FJ06SCU53080
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Aventura Chrysler Jeep Dodge RamReviews
Aventura Chrysler Jeep Dodge Ram review
Thanks to Mike Katz in finance for answering my questions and making it simple .So happy with my purchase. Will definitely come back here for my next car .
2025 BMW 530 review
Love everything about this car honestly besides the taillights. Drives very smoothly and sporty yet comfortable like a BMW should, nailed the interior, just not in love with the exterior.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- R71945T
- VIN
- WBA43FJ08RCR71945
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Starling Buick GMC StuartReviews
Starling Buick GMC Stuart review
Bob Ewing was great to work with, and will definitely go back there for future vehicles. I recommend others that are thinking of buying a new or used car to speak with Bob Ewing to get the job done.
-





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic Sport
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- Y21240C01
- VIN
- WBA53BH01PWY21240
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
North Miami MitsubishiReviews
North Miami Mitsubishi review
Edgar thanks for helping my daughters she loves her car . WE WILL BE COMING BACK
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- B548700
- VIN
- WBA53FJ07TCV74285
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Subaru of Pembroke PinesReviews
Subaru of Pembroke Pines review
Kerry was absolutely fantastic in helping identify the car that was the best fit for me and provided great guidance every step of the way. He was able to answer all of my questions and point me in the right direction for everything about the Subaru Crosstrek. Kerry made my experience in purchasing this car very smooth and enjoyable overall! I’d highly recommend requesting to speak with Kerry at the Pembroke Pines dealership if you’re looking to speak with someone kind and helpful. I’d give this experience 6 stars if I could put more than 5 stars.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 27-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- 161088
- VIN
- WBA43FJ08RCS03236
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of MiamiReviews
Carvix of Miami review
I had an amazing experience working with Jeffrey Kelly at Florida Fine Cars! He was professional, honest, patient, and went above and beyond to make sure I got the best deal possible. He made the entire car-buying process smooth and stress-free. If you’re looking for a great salesman who truly cares about his customers, ask for Jeffrey Kelly! Highly recommended! 🚗🔥
2024 BMW 530 review
Liked the outside design, I got the M package, red calipers etc... Not use to having a gear level, miss my analog gauges In previous 5 . Top of dash grill has a cheap feel, plastic.
-





Vehicle Information
- Ext. color
- Brown
- Int. color
- CHAMPAGNE
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 70292382
- VIN
- WBA53BH0XMCF95991
Features
- Convenience
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax Jensen BeachReviews
CarMax Jensen Beach review
Absolutely no pressure at all. All cars are unlocked so I was free to browse whatever vehicle I wanted. There are no sales persons on the lot following you around. Salesperson was very nice, professional, knowledgeable.
2021 BMW 530 review
It's my 5th 5 series BMW. 21' Arctic pearl white 530i with cognac Dakota leather vented seats. Absolutely amazing car. Smooth as glass acceleration, handling and braking. Large like an an old 7 series. 44 miles to the gallon doing over a 100mph going to Arizona in eco mode. The Sport mode is kick ass and noticibly quicker and tighter handeling. When I test drove her I thought for sure it was a 6 cylinder, it wasn't. 4 cylinder twin turbo. I wanted the straight 6 but was $12,000 more...to much. Each night I still go out to the garage and look at her before going to bed. Will be buying it 4/24 when lease expires. Greg
-





Vehicle Information
- Ext. color
- Phytonic Blue Metallic
- Int. color
- Mocha
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- PWY24356
- VIN
- WBA53BH02PWY24356
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Fort LauderdaleReviews
BMW of Fort Lauderdale review
The entire process was excellent, from building my car online to giving it to the dealership to order. Deliver with Brian my sales guy was awesome, great communication. The car arrived early even better then the final phase to get with Warren for my financing was amazing. Smooth fast and easy. Best car buying experience I have had over the past 20+ years with buying cars with BMW. Love my 2025 X5
-





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Cognac
- Drivetrain
- All-wheel Drive
- MPG
- 23-32
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic Sport
- Engine
- 2L I-4 direct injection, DOHC, Double VANOS variable valve contr
- Stock #
- X39264C01
- VIN
- WBA13BJ02NWX39264
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
North Miami MitsubishiReviews
North Miami Mitsubishi review
Thank for the Honda Edgar , they really have the best deals all around town thank again
-





Vehicle Information
- Ext. color
- Mineral White Metallic
- Int. color
- Burgundy Red
- Drivetrain
- Rear-wheel Drive
- MPG
- 28-35
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- TCX66016
- VIN
- WBA43FJ04TCX66016
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Fort LauderdaleReviews
BMW of Fort Lauderdale review
Ryan Schilt (our sales advisor) was phenomenal. My wife is a difficult customer, as it is hard for her to make a final decision on just about anything, especially a large purchase. Ryan truly spent about 15 hours with us, from start to finish (over 3 or 4 visits to your beautiful showroom). We live in Boca, thus we have closer BMW dealerships, however, none could possibly be as good as your dealership is/was. We visited a more local dealership before going to yours and the experience was not over the top, as your dealership is/was. I told Ryan he is a rising star at your dealership and I meant it. He knows how to deal with people well, he goes above and beyond what is required and I truly admire him for that. Ryan, thank you VERY MUCH - you are going to be star one day at Holman (BMW of FLL). Btw, Holman is a car dealership with over 50 locations across several high end vehicle brands. Holman started over 100 years ago and is currently in it's 3rd generation of family ownership. A wonderful, beautiful car dealership (to say the least). Everyone who works at Holman is a special person and will treat you right, from start to finish. A++ for Holman and all of it's employees. I truly mean all of the above.
-





Vehicle Information
- Ext. color
- Skyscraper Gray Metallic
- Int. color
- Cognac
- Drivetrain
- Rear-wheel Drive
- MPG
- 25-33
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic Sport
- Engine
- 2L I-4 gasoline direct injection, DOHC, Double VANOS variable va
- Stock #
- M65224F01
- VIN
- WBA53BH06PCM65224
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
North Miami MitsubishiReviews
North Miami Mitsubishi review
I would like to thank Jorge & Ernesto from North Miami Mitsubishi for providing exceptional customer service.. My experience at the dealership was great!! I am extremely impressed how helpful and patient knowledgeable they were. The process was smooth and enjoyable. I highly recommend Jorge from sales & Ernesto from finance if anyone is looking for a new vehicle or used car North Miami Mitsubishi is the place to buy!! Thank u guys From Gabriel
-





Vehicle Information
- Ext. color
- Black Sapphire Metallic
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 28-35
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- 4 Cylinder RWD Hybrid
- Stock #
- LU2272
- VIN
- WBA43FJ03SCU03432
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Memory Seat
Dealer
Carlux FTLReviews
Carlux FTL review
LOVE THIS VERY HAPPY WITH MY SERVICE AND A BEAUTIFUL SELECTION OF CARS. GO SEE JACI SHE IS VERY PROFESSIONAL, WE ARE VERY HAPPY WITH OUR CAR
-
BMW 530 prices by year
| Model year | Average price | Deals |
|---|---|---|
| 2027 BMW 530 | $69,539 | |
| 2026 BMW 530 | $63,296 |
|
About the BMW 530
How much does the BMW 530 cost?
The BMW 530 price depends on several factors, including the trim level, optional features, mileage, vehicle history and location. The nationwide average price for the 530 is $36,549, with pricing starting at $1,700.
What is the MPG of the BMW 530?
The hybrid BMW 530 can reach up to 28 MPG city and 35 MPG highway for a combined rating of 31 MPG. The BMW 530 with traditional internal combustion engine offers up to 25 MPG city and 33 MPG highway for a combined rating of 28 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
What are some similar vehicles and competitors of the BMW 530?
The BMW 530 compares to and/or competes against the following vehicles:
- Mercedes-Benz E-Class
- Mazda RX-8
- Lexus ES 300
- BMW 540
- BMW 525
- Audi A6
What trim levels are available for the BMW 530?
For the latest model year, the BMW 530 is available in the following trim levels:
- BMW 530 i
- BMW 530 i xDrive
What model years are available for the BMW 530?
Available model years for BMW 530 inventory range from 2018 to 2027.
Used BMW 530 by price
Similar Cars
-
Audi A6 for sale
398 Great Deals out of 1620 listings starting at $1,999
-
BMW 525 for sale
2 Great Deals out of 20 listings starting at $4,400
-
BMW 540 for sale
246 Great Deals out of 797 listings starting at $4,180
-
Lexus ES 300 for sale
12 Great Deals out of 45 listings starting at $2,300
-
Mercedes-Benz E-Class for sale
25 Great Deals out of 72 listings starting at $5,100
Used BMW 530 by city
-
BMW 530 in South Palm Beach, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in San Castle, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Hypoluxo, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Lake Worth, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Seminole Manor, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Atlantis, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Ocean Ridge, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Boynton Beach, FL
9 Great Deals out of 27 listings starting at $15,997
-
BMW 530 in Palm Springs, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Lake Clarke Shores, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Kenwood Estates, FL
8 Great Deals out of 24 listings starting at $15,997
-
BMW 530 in Briny Breezes, FL
9 Great Deals out of 29 listings starting at $15,997