Skip to main content
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Listings
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Filters
  • Tanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50i

    $50,272

    $805
    48,062 mi.
    Est. $924/mo

    New Century BMW

    4.4
    Alhambra, CA (26 mi)
    Check Availability

  • Alpine White 2026 BMW X6 M60iAlpine White 2026 BMW X6 M60iAlpine White 2026 BMW X6 M60iAlpine White 2026 BMW X6 M60iAlpine White 2026 BMW X6 M60iAlpine White 2026 BMW X6 M60i

    $96,121

    4,785 mi.
    Est. $1,766/mo

    BMW of Buena Park

    4.6
    Buena Park, CA (9 mi)
    Check Availability
  • Black Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40i

    $56,162

    $507
    29,792 mi.
    Est. $1,032/mo

    Huntington Beach Chrysler Dodge Jeep Ram

    4.5
    Huntington Beach, CA (2 mi)
    Check Availability
  • Mineral White Metallic 2022 BMW X6 M50iMineral White Metallic 2022 BMW X6 M50iMineral White Metallic 2022 BMW X6 M50iMineral White Metallic 2022 BMW X6 M50iMineral White Metallic 2022 BMW X6 M50iMineral White Metallic 2022 BMW X6 M50i

    $54,117

    $1K
    43,171 mi.
    Est. $994/mo

    Weir Canyon Honda

    4.8
    Anaheim, CA (17 mi)
    Check Availability
  • Vermilion Red Metallic 2012 BMW X6 xDrive35iVermilion Red Metallic 2012 BMW X6 xDrive35iVermilion Red Metallic 2012 BMW X6 xDrive35iVermilion Red Metallic 2012 BMW X6 xDrive35iVermilion Red Metallic 2012 BMW X6 xDrive35iVermilion Red Metallic 2012 BMW X6 xDrive35i

    $14,632

    $500
    60,452 mi.
    Est. $269/mo

    Auto Connections

    4.9
    Orange, CA (8 mi)
    Check Availability
  • Blue 2024 BMW X6 MBlue 2024 BMW X6 MBlue 2024 BMW X6 MBlue 2024 BMW X6 MBlue 2024 BMW X6 MBlue 2024 BMW X6 M

    $73,998

    32,259 mi.
    Est. $1,359/mo

    CarMax Buena Park

    4.4
    Buena Park, CA (9 mi)
    Check Availability
  • Black Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40i

    $58,854

    $122
    26,855 mi.
    Est. $1,081/mo

    Knight Claremont Chrysler Dodge Jeep Ram

    4.2
    Claremont, CA (28 mi)
    Check Availability
  • Dravit Grey Metallic 2023 BMW X6 M50iDravit Grey Metallic 2023 BMW X6 M50iDravit Grey Metallic 2023 BMW X6 M50iDravit Grey Metallic 2023 BMW X6 M50iDravit Grey Metallic 2023 BMW X6 M50iDravit Grey Metallic 2023 BMW X6 M50i

    $56,117

    47,263 mi.
    Est. $1,031/mo

    Nissan of Tustin

    4.6
    Tustin, CA (11 mi)
    Check Availability
  • Green 2020 BMW X6 M50iGreen 2020 BMW X6 M50iGreen 2020 BMW X6 M50iGreen 2020 BMW X6 M50iGreen 2020 BMW X6 M50iGreen 2020 BMW X6 M50i

    $44,998

    43,361 mi.
    Est. $827/mo

    CarMax Irvine

    4.6
    Irvine, CA (17 mi)
    Check Availability
  • Black 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 M

    $66,998

    $1K
    47,029 mi.
    Est. $1,231/mo

    CarMax LAX

    4.5
    Inglewood, CA (27 mi)
    Check Availability
  • White 2025 BMW X6 xDrive40iWhite 2025 BMW X6 xDrive40iWhite 2025 BMW X6 xDrive40iWhite 2025 BMW X6 xDrive40iWhite 2025 BMW X6 xDrive40iWhite 2025 BMW X6 xDrive40i

    $60,998

    $1K
    44,354 mi.
    Est. $1,121/mo

    CarMax Torrance

    4.6
    Torrance, CA (23 mi)
    Check Availability
  • Gray 2019 BMW X6 SDrive35iGray 2019 BMW X6 SDrive35iGray 2019 BMW X6 SDrive35iGray 2019 BMW X6 SDrive35iGray 2019 BMW X6 SDrive35iGray 2019 BMW X6 SDrive35i

    $26,998

    $1K
    64,929 mi.
    Est. $496/mo

    CarMax San Gabriel Valley/Duarte

    4.5
    Duarte, CA (28 mi)
    Check Availability
  • Gray 2017 BMW X6 XDrive50iGray 2017 BMW X6 XDrive50iGray 2017 BMW X6 XDrive50iGray 2017 BMW X6 XDrive50iGray 2017 BMW X6 XDrive50iGray 2017 BMW X6 XDrive50i

    $28,998

    $1K
    64,016 mi.
    Est. $533/mo

    CarMax Costa Mesa

    4.4
    Costa Mesa, CA (6 mi)
    Check Availability
  • Dravit Grey Metallic 2025 BMW X6 M60iDravit Grey Metallic 2025 BMW X6 M60iDravit Grey Metallic 2025 BMW X6 M60iDravit Grey Metallic 2025 BMW X6 M60iDravit Grey Metallic 2025 BMW X6 M60iDravit Grey Metallic 2025 BMW X6 M60i

    $74,117

    30,506 mi.
    Est. $1,362/mo

    McKenna Preowned Center

    Norwalk, CA (15 mi)
    Check Availability
  • Black Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40i

    $53,500

    45,282 mi.
    Est. $983/mo

    Cerritos Dodge Chrysler Jeep RAM

    Cerritos, CA (11 mi)
    Check Availability
  • Manhattan Green Metallic 2020 BMW X6 M50iManhattan Green Metallic 2020 BMW X6 M50iManhattan Green Metallic 2020 BMW X6 M50iManhattan Green Metallic 2020 BMW X6 M50iManhattan Green Metallic 2020 BMW X6 M50iManhattan Green Metallic 2020 BMW X6 M50i

    $41,084

    54,305 mi.
    Est. $755/mo

    PNW Luxury OC

    Westminster, CA (2 mi)
    Check Availability
  • Mineral White Metallic 2023 BMW X6 xDrive40iMineral White Metallic 2023 BMW X6 xDrive40iMineral White Metallic 2023 BMW X6 xDrive40iMineral White Metallic 2023 BMW X6 xDrive40iMineral White Metallic 2023 BMW X6 xDrive40iMineral White Metallic 2023 BMW X6 xDrive40i

    $50,242

    39,754 mi.
    Est. $923/mo

    Porsche South Bay

    3.6
    Hawthorne, CA (25 mi)
    Check Availability
  • Blue 2025 BMW X6 xDrive40iBlue 2025 BMW X6 xDrive40iBlue 2025 BMW X6 xDrive40iBlue 2025 BMW X6 xDrive40iBlue 2025 BMW X6 xDrive40iBlue 2025 BMW X6 xDrive40i

    $57,998

    $1K
    31,450 mi.
    Est. $1,065/mo

    CarMax San Gabriel Valley/Duarte

    4.5
    Duarte, CA (28 mi)
    Check Availability
  • White 2023 BMW X6 xDrive40iWhite 2023 BMW X6 xDrive40iWhite 2023 BMW X6 xDrive40iWhite 2023 BMW X6 xDrive40iWhite 2023 BMW X6 xDrive40iWhite 2023 BMW X6 xDrive40i

    $47,998

    $1K
    63,191 mi.
    Est. $882/mo

    CarMax Costa Mesa

    4.4
    Costa Mesa, CA (6 mi)
    Check Availability
  • Mineral White Metallic 2022 BMW X6 xDrive40iMineral White Metallic 2022 BMW X6 xDrive40iMineral White Metallic 2022 BMW X6 xDrive40iMineral White Metallic 2022 BMW X6 xDrive40iMineral White Metallic 2022 BMW X6 xDrive40iMineral White Metallic 2022 BMW X6 xDrive40i

    $40,917

    50,370 mi.
    Est. $752/mo

    Knight Claremont Chrysler Dodge Jeep Ram

    4.2
    Claremont, CA (28 mi)
    Check Availability
  • Phytonic Blue Metallic 2021 BMW X6 sDrive40iPhytonic Blue Metallic 2021 BMW X6 sDrive40iPhytonic Blue Metallic 2021 BMW X6 sDrive40iPhytonic Blue Metallic 2021 BMW X6 sDrive40iPhytonic Blue Metallic 2021 BMW X6 sDrive40iPhytonic Blue Metallic 2021 BMW X6 sDrive40i

    $37,171

    74,610 mi.
    Est. $683/mo

    CAR LUX

    3.8
    Inglewood, CA (25 mi)
    Check Availability
  • Tanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50iTanzanite Blue II Metallic 2023 BMW X6 M50i

    $50,272

    $805
    48,062 mi.
    Est. $924/mo

    New Century BMW

    4.4
    Alhambra, CA (26 mi)
    Check Availability
  • Black 2025 BMW X6 xDrive40iBlack 2025 BMW X6 xDrive40iBlack 2025 BMW X6 xDrive40iBlack 2025 BMW X6 xDrive40iBlack 2025 BMW X6 xDrive40iBlack 2025 BMW X6 xDrive40i

    $63,998

    23,760 mi.
    Est. $1,176/mo

    CarMax San Gabriel Valley/Duarte

    4.5
    Duarte, CA (28 mi)
    Check Availability
  • Black 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 MBlack 2022 BMW X6 M

    $61,998

    67,073 mi.
    Est. $1,139/mo

    CarMax Costa Mesa

    4.4
    Costa Mesa, CA (6 mi)
    Check Availability
  • White 2019 BMW X6 sDrive35iWhite 2019 BMW X6 sDrive35iWhite 2019 BMW X6 sDrive35iWhite 2019 BMW X6 sDrive35iWhite 2019 BMW X6 sDrive35iWhite 2019 BMW X6 sDrive35i

    $18,485

    101,674 mi.
    Est. $340/mo

    Pro X Motors

    South Gate, CA (21 mi)
    Check Availability
  • Alpine White 2026 BMW X6 xDrive40iAlpine White 2026 BMW X6 xDrive40iAlpine White 2026 BMW X6 xDrive40iAlpine White 2026 BMW X6 xDrive40iAlpine White 2026 BMW X6 xDrive40iAlpine White 2026 BMW X6 xDrive40i

    $73,499

    $1.5K
    2,014 mi.
    Est. $1,350/mo

    Certified Benz & Beemer

    4.9
    $488 delivery from Scottsdale, AZ (349 mi)
    Check Availability
  • Black Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40iBlack Sapphire Metallic 2024 BMW X6 xDrive40i

    $64,599

    20,930 mi.
    Est. $1,187/mo

    Certified Benz & Beemer

    4.9
    $488 delivery from Scottsdale, AZ (349 mi)
    Check Availability

BMW X6 prices by year

Model year Average price Deals
2027 BMW X6 $92,934

About the BMW X6

FAQs

How much does the BMW X6 cost?

The BMW X6 price depends on several factors, including the trim level, optional features, mileage, vehicle history and location. The nationwide average price for the X6 is $49,032, with pricing starting at $4,950.

What is the MPG of the BMW X6?

The hybrid BMW X6 can reach up to 23 MPG city and 26 MPG highway for a combined rating of 24 MPG. The BMW X6 with traditional internal combustion engine offers up to 21 MPG city and 26 MPG highway for a combined rating of 23 MPG.

These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.

What are some similar vehicles and competitors of the BMW X6?

The BMW X6 compares to and/or competes against the following vehicles:


What trim levels are available for the BMW X6?

For the latest model year, the BMW X6 is available in the following trim levels:

  • BMW X6 M60i
  • BMW X6 xDrive40i

What model years are available for the BMW X6?

Available model years for BMW X6 inventory range from 2012 to 2027.

Used BMW X6 by price

Similar Cars

Used BMW X6 by city