Used Chevrolet cars for sale near Social Circle, GA
-
-





$60,746
Est. $1,108/mo Courtesy Ford
Check Availability Vehicle Information
- Ext. color
- Torch Red
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V-8 gasoline direct injection, variable valve control, prem
- Stock #
- P11472
- VIN
- 1G1YA2D44P5141734
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
Dealer
Courtesy FordReviews
Courtesy Ford review
Excellent service. Professional and courteous people in the service department. They follow through and always treat me respectfully.
2023 Chevrolet Corvette review
Update from Vette Guy of Tucson, Az. I received my replacement Z-06 convertible almost exactly 2 months from the date I ordered it. It arrived exactly as ordered: Mist Red with Natural interior, Z07 Handling Package, Visible Carbon Fiber Big Aero Package, Carbon Fiber Wheels and Racing Seats. I have 800 miles on the car, so far no problems. I plan on racing the car in the September Silver State Challenge Ely, Nv. open road race. I raced the 2023 Z06 there in May, great race try it! I'm also attending the Z06 driving school in Pahrump,Nv. I did the Z51 school last year, highly recommended! Overall a big Thumbs up to Watson Chevrolet for keeping their word on getting me a replacement Z-06!
-





$60,746
Est. $1,108/mo Courtesy Ford
Check Availability Vehicle Information
- Ext. color
- Torch Red
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V-8 gasoline direct injection, variable valve control, prem
- Stock #
- P11472
- VIN
- 1G1YA2D44P5141734
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
Dealer
Courtesy FordReviews
Courtesy Ford review
Excellent service. Professional and courteous people in the service department. They follow through and always treat me respectfully.
2023 Chevrolet Corvette review
Update from Vette Guy of Tucson, Az. I received my replacement Z-06 convertible almost exactly 2 months from the date I ordered it. It arrived exactly as ordered: Mist Red with Natural interior, Z07 Handling Package, Visible Carbon Fiber Big Aero Package, Carbon Fiber Wheels and Racing Seats. I have 800 miles on the car, so far no problems. I plan on racing the car in the September Silver State Challenge Ely, Nv. open road race. I raced the 2023 Z06 there in May, great race try it! I'm also attending the Z06 driving school in Pahrump,Nv. I did the Z51 school last year, highly recommended! Overall a big Thumbs up to Watson Chevrolet for keeping their word on getting me a replacement Z-06!
-





Vehicle Information
- Ext. color
- Sterling Gray Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 15-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V-8 direct injection, variable valve control, regul
- Stock #
- G26438A
- VIN
- 1GNSKNKD4PR232999
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Colonial Buick GMCReviews
Colonial Buick GMC review
Great customer service and they always do a great job ! I?ll be a forever customer! I live to come here for my oil changes!
2023 Chevrolet Tahoe review
I have a 2023 Tahoe after driving a Mercedes ML350. Husband wanted something bigger. While I really like my Tahoe, I do have a few complaints. The side mirror moves to a weird position inside the case every time I start the car and the preset button does not move it back, I have to reset it manually. I have had this "fixed" once only for it to start doing it again. I hate the auto stop option and am trying to train myself to push the button to turn it off whenever I get in it. The breaks squeal when stopping, I absolutely hate it! Was told since break pads used to be asbestos so they do not use them anymore and now it is metal on metal and living in a humid area makes them rust and that's what make them squeal. Was told to hard stop every so often to knock of the rust. What??? And my biggest complaint, it will not read my text messages to me without and internet plan. Why will it connect to my phone for calls, maps and music but won't read messages?? One of the biggest causes of wrecks, people trying to text while driving. Just one more way to get more money from us as if we didn't pay a fortune for the vehicle itself.
-





$60,677
Est. $1,107/mo Jimmy Britt Chevrolet
Check Availability Vehicle Information
- Ext. color
- Accelerate Yellow Metallic
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-24
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V8
- Stock #
- P1287
- VIN
- 1G1YA2D45N5112112
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
Dealer
Jimmy Britt ChevroletReviews
Jimmy Britt Chevrolet review
Justin was very helpful in getting my truck for me and was very excited for me, He did everything I asked and went over the whole process with me and made sure that I got what I wanted
2022 Chevrolet Corvette review
Never owned a Corvette before my 2020 C8 2LT. This American sports car is a super car costing 3 & 4 times less than others. My only disappointment is the camera in the interior rear view mirror. Head lights and driving lights flutter in the camera and at night following vehicles appear to be in a fog. It's a smart man's super car.
-





Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 19-22
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.7L I-4 direct injection, DOHC, variable valve control, interco
- Stock #
- 26T1472A
- VIN
- 3GCNAAEK3NG500479
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Courtesy FordReviews
2022 Chevrolet Silverado 1500 review
very good truck it is the best car i jave bought since my opd one was broken this help me alot and thanks for seeing this
-





$14,398
Est. $263/mo Hayes Chrysler Dodge Jeep RAM-Lawrenceville
Check Availability Vehicle Information
- Ext. color
- Black
- Int. color
- Ebony
- Drivetrain
- Rear-wheel Drive
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- 5.3L V8 16V MPFI OHV
- Stock #
- 22300A
- VIN
- 3GCPCSE05DG350414
Features
- Entertainment
- CD Player
- Satellite Radio
- Safety
- Stability Control
Dealer
Hayes Chrysler Dodge Jeep RAM-LawrencevilleReviews
Hayes Chrysler Dodge Jeep RAM-Lawrenceville review
Thanks to ALL OF YOU, I GOT THE CAR I WANTED, and I could not be happier...Thanks again for making it happen for me!!! DEARCI and MAGDALENA!!!!BOTH of you were GREAT!!!!
2013 Chevrolet Silverado 1500 review
Pricey but not for these days! $20000 for a 2013 best deal I could find! I did find exactly what I was looking for and the dealer was amazing! They worked with me on everything! So happy I found car. com to find my truck!
-
-





$42,566
Est. $777/mo Jimmy Britt Chevrolet
Check Availability Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 22-25
- Fuel type
- Diesel
- Transmission
- Automatic
- Engine
- 3.0L I6
- Stock #
- B1354
- VIN
- 3GCUKFE88SG301692
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
Dealer
Jimmy Britt ChevroletReviews
2025 Chevrolet Silverado 1500 review
When I first drove this truck I fell in love with it. I am recommending this truck to everyone I know. It’s got great power and it is comfortable. It rides surprisingly smooth.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 17-21
- Fuel type
- Diesel
- Transmission
- Automatic
- Engine
- 3.0L I6 24V DDI DOHC Turbo Diesel
- Stock #
- TGB65132A
- VIN
- 1GCUKEE88TZ234930
Features
- Convenience
- Heated Steering Wheel
- Keyless Start
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
Dealer
Akins FordReviews
Akins Ford review
Akins service dept is the best in town. They did the Works service in 56 minutes. My service writer Rudy was very polite and friendly. He was very efficient in keeping me updated. There waiting room is silo with free coffee and drinks and ice cream snacks and computers.
2026 Chevrolet Silverado 1500 review
I recently purchased a 2026 Chevy Silverado LT Z71 Crew Cab Trail Boss, and I couldn’t be happier with my decision. The truck looks incredible, rides smoothly, and has all the power and capability I was looking for. If you’re considering a new truck, I highly recommend the 2026 Silverado LT Z71 Crew Cab Trail Boss.
-





$30,885
Est. $563/mo Lou Sobh Volkswagen of Athens
Check Availability Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 19-22
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 5.3L V8 16V GDI OHV
- Stock #
- 5NZ504958
- VIN
- 1GCPACED5NZ504958
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Lou Sobh Volkswagen of AthensReviews
Lou Sobh Volkswagen of Athens review
This was a really great experience from Lou Sobh Volkswagen, Phil our salesperson was on point with every question we had. And we left with a beautiful pre-owned Tiguan!! Zaria in parts was awesome in helping us pick out accessories. We highly recommend at Lou Sobh Volkswagen.
2022 Chevrolet Silverado 1500 review
Love my 22 Chevy LTZ truck, I have the cat back mufflers on it which are not that loud. The inside cab noise is really loud from the road noise and pipes. Don't feel the cab is insulated very well.
-





$36,794
Est. $671/mo O'Steen Acura Volvo Cars Athens
Check Availability Vehicle Information
- Ext. color
- Summit White
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 16-18
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 5.3L V8 16V GDI OHV
- Stock #
- UA00274
- VIN
- 3GCUDFED2NG565566
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
Dealer
O'Steen Acura Volvo Cars AthensReviews
2022 Chevrolet Silverado 1500 review
Comfort in a truck that gets excellent gas mileage and has plenty of power for the average driver. Handles well and has many features! Would recommend for anyone who likes a good full size truck and 4x4 with tow package.
-





Vehicle Information
- Ext. color
- Silver Ice Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 15-20
- Fuel type
- Gasoline
- Transmission
- 8-SPEED AUTOMATIC, ELECTRONICALLY CONTROLLED
- Engine
- EcoTec3 6.2L V-8 gasoline direct injection, variable valve contr
- Stock #
- HG486062
- VIN
- 3GCUKSEJ5HG486062
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Magnetism MotorsReviews
Magnetism Motors review
Gracias a cesar me ayudo buscar un carro and con un pago que era bueno pa mi
2017 Chevrolet Silverado 1500 review
Very good truck, bought it used, inside is comfortable lots of features, engine runs good for now. enough power to pull a trailer and good on mileage for a truck
-
$104,605
New 2027 Chevrolet Corvette Grand Sport
$77,027
New 2027 Chevrolet Silverado 1500 ZR2
$79,227
New 2027 Chevrolet Silverado 1500 High Country
$76,727
New 2027 Chevrolet Silverado 1500 ZR2
$50,205
New 2026 Chevrolet Silverado 1500 RST
$83,177
New 2027 Chevrolet Tahoe Z71, 4WD
$80,415
New 2027 Chevrolet Tahoe RST
$50,000
New 2026 Chevrolet Silverado 2500 Custom
$86,177
New 2027 Chevrolet Tahoe High Country, 4WD
$67,730
New 2026 Chevrolet Silverado 1500 High Country
$65,000
New 2026 Chevrolet Colorado ZR2
$57,121
New 2026 Chevrolet Silverado 1500 LT Trail Boss -





$58,957
Est. $1,076/mo Magnetism Motors
Check Availability Vehicle Information
- Ext. color
- Arctic White
- Int. color
- Sky Cool Gray
- Drivetrain
- Rear-wheel Drive
- MPG
- 15-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V-8 direct injection, variable valve control, premium gasol
- Stock #
- M5107785
- VIN
- 1G1YB2D44M5107785
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Magnetism MotorsReviews
Magnetism Motors review
Amazing service everyonenwas nice and helpful i liked how everyone was and treated me thank you ceaser
2021 Chevrolet Corvette review
Great car to drive, fast and comfortable. Hard to get in and out of for me. Very good value and no problems after 7500 miles.
-
-





Vehicle Information
- Ext. color
- Slate Gray Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- TurboMax 2.7L I-4 direct injection, DOHC, variable valve control
- Stock #
- 29015265
- VIN
- 3GCPDKEK5RG283755
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
CarMax AthensReviews
CarMax Athens review
You couldn't find a better place to shop. Very enjoyable to work with them treated the wife and I better than I was ever treated at a dealership. we will recommend to friends and family think for everything.
2024 Chevrolet Silverado 1500 review
Purchased new vehicle at Hendrix Chevrolet, Charlotte, North Carolina helped by Chadwick, Dana, Brandon,& Nicholas, great hospitality great service. Excellent experience word buy her again
-





Vehicle Information
- Ext. color
- Silver Ice Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.7L I-4 direct injection, DOHC, variable valve control, interco
- Stock #
- KZ240604STK
- VIN
- 1GCRYDEK2KZ240604
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
Dealer
DriveTime of ConyersReviews
2019 Chevrolet Silverado 1500 review
Since I've owned it, so far so good. I like my truck and I appreciate it everyday. A little bit of shaking in the steering at high speeds but I'm not concerned with it. Overall, pretty great.
-





Vehicle Information
- Ext. color
- Summit White
- Int. color
- Light Cashmere/Dark Cashmere
- Drivetrain
- Four-wheel Drive
- MPG
- 15-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Vortec 5.3L V-8 variable valve control, regular gasoline, engine
- Stock #
- 27T0061A
- VIN
- 1GNSKCE00DR278838
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Bluetooth®
- CD Player
- DVD Player
- Rear Seat Entertainment
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Backup Camera
- Blind Spot Monitor
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Courtesy FordReviews
Courtesy Ford review
I did my research, but the experience was even better in person, they had what I wanted in stock and at the best price, Paul Guyton really went the extra mile of trying to put the whole deal together for me and my family
2013 Chevrolet Tahoe review
My 2013 Tahoe LTZ w/ 143k miles is the best Chevy vehicle I’ve owned yet, for the last 20k miles I’ve owned it’s been very reliable, has never left me stranded. the only thing I do not care for is the afm to drop into 4 cyl mode, putting trans into manual 5 works like a charm to keep all 8 cylinders running up to 60mph. Working on these vehicles yourself is really easy for routine maintenance (except for the transmission), I’ve replaced a lot of stuff and fresh tune up on mine because she’s getting up there in mileage and I want to make sure she is going to be a top performer for the long run. Overall 9/10 recommend this Vehicle
-





Vehicle Information
- Ext. color
- Dark Ash Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-21
- Fuel type
- Diesel
- Transmission
- 10-Speed Automatic
- Engine
- 3.0L I6 24V DDI DOHC Turbo Diesel
- Stock #
- RZ216350U
- VIN
- 1GCUDEE86RZ216350
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
ALM Hyundai AthensReviews
ALM Hyundai Athens review
We were not able to come up with a deal. The dealership was firm on their asking price. Although a few days later they did reach out to say that they had dropped the price, unfortunately I had already completed a deal with another dealership.
2024 Chevrolet Silverado 1500 review
What I am most satisfied with is its color. This matte silver color is matched with silver wheels, which is really unique. The matte texture is very good, and the personality is low-key but full of connotation. I just like not to follow the crowd.
-





Vehicle Information
- Ext. color
- Dark Ash Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 22-19
- Fuel type
- Diesel
- Transmission
- Automatic
- Engine
- Duramax 3L I-6 diesel direct injection, DOHC, variable valve con
- Stock #
- G26304A
- VIN
- 1GCUDEET0NZ541137
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Colonial Buick GMCReviews
Colonial Buick GMC review
My salesman, Dave, was outstanding from the very beginning of the contact and sale. I believed he was honest and represented the company well. He and I agreed on a price over the phone, and I accepted it. Before the purchase was completed, I was engaged by another dealer with a lower price. However, I chose to stay with Dave because of his integrity and my belief that a deal is a deal.
2022 Chevrolet Silverado 1500 review
The Silverado is my dream vehicle, I've wanted one ever since I was a kid and my dad had one. I needed a full sized 4 x 4 truck w/ room for the family to be comfortable during trips and the Silverado LT is it! Everything I could ask for and more! Plus, Jeremy at Champion Hargreaves Chevrolet was outstanding; I ended up with a lifetime powertrain warranty, a 1 year bumper to bumper warranty from the dealership, and the price was a steal for a truck w/ only 26,000 miles on it! I am as happy as a clam!
-





$37,900
Est. $691/mo Southern Auto Imports
Check Availability Vehicle Information
- Ext. color
- Red
- Int. color
- Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 17-29
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 6.2L V8 16V GDI OHV
- Stock #
- SA114021
- VIN
- 1G1YM2D78F5114021
Features
- Convenience
- Keyless Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Stability Control
- Seating
- Leather Seats
Dealer
Southern Auto ImportsReviews
Southern Auto Imports review
Danny did such a great job helping my son fine a car, I brought my fiance in and she bought a car in the same week! Very nice guys to deal with. Danny in sales and Raul the finance manager took the time to discuss all our options. The end result was a great experience! They have great prices and even better service. Thanks Southern Auto imports!
2015 Chevrolet Corvette review
Love vetted since Route 66. This is 2nd C7,Velocity Yellow. Looks great and is a hoot to drive. Being 11years old it has a few issues but they are of no significance.
-





Vehicle Information
- Ext. color
- White
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 16-22
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V-8 gasoline direct injection, variable valve contr
- Stock #
- Z137188Z
- VIN
- 1GCUYDED9KZ137188
Features
- Convenience
- Keyless Entry
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
Dealer
United Luxury MotorsReviews
United Luxury Motors review
Good service nice friendly people would recommend to friends
2019 Chevrolet Silverado 1500 review
I recently found a oil leak earlier on the engine oil cooling lines. It took a couple of days to find the parts to fix it. It seems the there were 3 dealers in the area that had the part but they were already designated for other pickups with the same problem. This being said I believe GM is aware of the problem and should take responsibility for the cost encured for repairs.
-





Vehicle Information
- Ext. color
- White
- Int. color
- Gray
- Drivetrain
- Four-wheel Drive
- MPG
- 23-29
- Fuel type
- Diesel
- Transmission
- Automatic 10-Speed
- Engine
- Duramax 3L I-6 direct injection, DOHC, variable valve control, i
- Stock #
- LG264169STK
- VIN
- 3GCUYDET3LG264169
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Memory Seat
Dealer
Top Deals AutomotiveReviews
2020 Chevrolet Silverado 1500 review
I have a 2020 Chevy Silverado 1500 and simply love my truck. It now has 110,000 miles and the only repairs I needed were a water pump under warranty at 99,000 miles and brake system that needed to be upgraded. It's comfortable and drives like a car. This is my 6th Silverado truck. You can't go wrong.
-





Vehicle Information
- Ext. color
- Glacier Blue Metallic
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 16-20
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V8
- Stock #
- 26T1461A
- VIN
- 1GCUDEED3PZ332339
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
Dealer
Courtesy FordReviews
2023 Chevrolet Silverado 1500 review
been buying dhevy trucks since 1976 was my 1st truck, now i got a 2022 silverado with a 6.2 last Feb. of 2023,kicked up the computer kicking out 454 horse power to the wheels, still waiting on my tow mirrors dont make the wiring harrness for my modle is the only problem im having with this truck, will never buy any other truck.
-





$44,468
Est. $811/mo Group 1 Toyota Stone Mountain
Check Availability Vehicle Information
- Ext. color
- Black
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 22-27
- Fuel type
- Diesel
- Transmission
- 10-Speed A/T
- Engine
- Duramax 3L I-6 direct injection, DOHC, variable valve control, i
- Stock #
- PG101656
- VIN
- 3GCUDJE86PG101656
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Group 1 Toyota Stone MountainReviews
2023 Chevrolet Silverado 1500 review
Great truck awesome power Has the usual infotainment system issues that all makes have the sound goes out and radio system locks up shut it down for a few then works again The steering column upper cover came a part when I picked it up the dealer ordered the part but it’s been 3 months no called from the dealer ( Unity Chevy ) Newburgh ny No status updates very poor dealer Also no fog lights and none are available from the dealer or after market needs fog lights the normal headlights just aren’t enough lighting for night driving One other note the antenna paint is peeling and the dealer said I had to pay for that Lol truck had 230 miles on it the dealer was a joke so I will be going to another dealer for and warranty work
-





$39,689
Est. $724/mo Countryside Chrysler Dodge Jeep RAM of Madison
Check Availability Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 16-20
- Fuel type
- Gasoline
- Transmission
- 10-speed automatic
- Engine
- EcoTec3 5.3L V-8 gasoline direct injection, variable valve contr
- Stock #
- 2LP2756
- VIN
- 2GCUDGED5P1130722
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Countryside Chrysler Dodge Jeep RAM of MadisonReviews
Countryside Chrysler Dodge Jeep RAM of Madison review
This dealership has the most accommodating personel. They went above and beyond helping us to be able to continue our trip to Virginia.
2023 Chevrolet Silverado 1500 review
This is my 3rd Silverado and the best one yet. The infotainment features are great. The screen is big and easy to work. Looks great, rides smooth, quiet and is plenty powerful. (5.3 V8) Great every day driver for my family of 4.
-





$28,899
Est. $527/mo Countryside Pre-Owned Supercenter
Check Availability Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-21
- Fuel type
- E85 Flex Fuel
- Transmission
- Automatic
- Engine
- 5.3L V8 16V GDI OHV Flexible Fuel
- Stock #
- 3P1120
- VIN
- 1GCUDAED7PZ302043
Features
- Convenience
- Keyless Entry
- Keyless Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Stability Control
Dealer
Countryside Pre-Owned SupercenterReviews
2023 Chevrolet Silverado 1500 review
More comfortable and roomier than a car. Great gas mileage for a big truck - 21.8 miles per gallon to California and back, 24.4 miles per gallon to Kansas City airport and back. My wife always says, “Are we riding in luxury or taking the car.” I would highly recommend a Silverado to anyone who wants a dependable, useable truck!!
-





$60,448
Est. $1,103/mo Jimmy Britt Chevrolet
Check Availability Vehicle Information
- Ext. color
- Elkhart Lake Blue Metallic
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 15-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V8
- Stock #
- B1362
- VIN
- 1G1YC2D46M5100589
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Jimmy Britt ChevroletReviews
2021 Chevrolet Corvette review
This car is definitely and upgrade from my C7! The shifting, the handling and overall driving experience is amazing for the money! So fun to drive every time I get behind the wheel!
-





$40,455
Est. $738/mo Jimmy Britt Chevrolet
Check Availability Vehicle Information
- Ext. color
- Black
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-22
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V8
- Stock #
- B1167
- VIN
- 2GCPAEED3R1132336
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Jimmy Britt ChevroletReviews
2024 Chevrolet Silverado 1500 review
My 2024 Chevy Silverado LTZ provides a deluxe large SUV interior and a standard (short) tuck bed all in one vehicle. It is loaded with features to make it look and operate very well, and it provides mid 20's regular unleaded fuel mileage. The dynamic fuel management system combined with the 10 speed automatic transmission work together flawlessly to deliver smooth power without being able to realize what gear or how many cylinders the powertrain is using at any given time.
-





Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Four-wheel Drive
- MPG
- 14-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- EcoTec3 5.3L V-8 direct injection, variable valve control, regul
- Stock #
- 26T1634A
- VIN
- 1GCUYGED4MZ287522
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Courtesy FordReviews
Courtesy Ford review
We needed a used car sooner rather than later. We have bought two trucks in less than four years at Courtesy through Jason. We went to Jason to ask what to do about acquiring a vehicle. He is very knowledgeable about what is on his lot and helped us out. We walked out with an excellent used car and excellent customer care. Courtesy Ford will treat you right, and ask for Jason!
2021 Chevrolet Silverado 1500 review
A hard clunk bump on acceleration still looks new I've got a 24 mile stretch of road. Need reliable Vehicle. No break downs ....................................... No more to write.
-





$43,177
Est. $788/mo Jimmy Britt Chevrolet
Check Availability Vehicle Information
- Ext. color
- Torch Red
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-28
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 6.2L V8
- Stock #
- B1322A
- VIN
- 1G1YF2D77E5119879
Features
- Convenience
- Cooled Seats
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Jimmy Britt ChevroletReviews
Jimmy Britt Chevrolet review
Awesome Salesman Let me choose my next car to buy Thank you Doug Greensboro Jimmy Brit Chev
2014 Chevrolet Corvette Stingray review
On December 10th, 2024, I purchased a red 2015 Corvette Stingray Convertible 3LT from Country Chevrolet in Warrenton, Virginia. I have purchased 26 new and used cars in my life, and I have to say this was by far the best buying experience I have ever had in my life. My first car was a new 1980 Corvette, and I evolved into planning for my last car to be a red corvette convertible. After much research, lots of shopping, and numerous test drives, I found this car listed on-line at Country Chevrolet at a listed price in the range I was looking for. I called and set up a test Drive for the wife and me. We drove up to the dealership and noticed one or two folks outside who immediately said hi, welcomed us to the dealership and went to get the salesman for our test drive. The environment at this dealership was more welcoming than any Chevy dealership I had ever been to. When Kirk Hughes, our sales consultant introduced himself, we could clearly see we had found at great person to work with. Kirk is friendly, professional, and an absolute expert in corvettes and cars in general. Kirk is by far one of the best salesmen I have ever met. I consider myself a car person, as I enjoy buying, selling and talking about cars. I also perform much of the simple maintenance tasks like changing fluids, brakes and normal maintenance items. Kirk is truly knowledgeable and an absolute pleasure to talk to. After being at the dealership for a bit, I bumped into Kevin Bearce, another sales consultant and person we knew. He is another unbelievable friendly professional and a true joy to talk to. With sales folks like Kirk and Kevin, I would recommend Country Chevrolet to any and everyone, as they clearly only hire the best of the best. Kirk had three surprise visits by existing customers during our time shopping, and Kevin jumped in without skipping a beat, to assist in what turned out to be our purchase of the corvette. The finance consultant, J. C. Welch, quickly assisted in finalizing the sale at a price I considered fair. He too was friendly and professional in all. My whole experience at Country Chevrolet was completely different than my previous experiences buying cars. The atmosphere and attitude of the people was friendly, upbeat and caring. This tells me that the management and ownership of this dealership sets high standards for their people, and the result is great buying experience for a customer like me. Thank you to Kirk, Kevin, J.C. and Country Chevrolet. My wife and I are enjoying this wonderful dream car thanks to the efforts of a great Chevy team.
-





Vehicle Information
- Ext. color
- Summit White
- Int. color
- Jet Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 15-20
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 5.3L V8 16V GDI OHV
- Stock #
- R424335T
- VIN
- 1GNSCEKD9PR424335
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Akins FordReviews
Akins Ford review
Nick Smith was my sales consultant and he was great through the entire process. Nick was professional, responsive and easy to work with. I recommend Akin Ford and Nick.
2023 Chevrolet Suburban review
Have owned other big vehicles like 3/4 ton 2500 Dodge Ram Hemi. I got a Duramax diesel engine in this Suburban. Saves on gas, believe it or not. Very comfortable, very smooth ride, and very quiet even after installing 2” lift and bigger tires. Have the Premier package. Definitely worth every bit of my money. Very heavy duty compared to the new 2024 Ford Expedition Max that I drove for quite some time. Has been very reliable. GM has been quick to fix any recalls. Have only had one recall. Compared to my Ram, it can keep up with all the towing and hauling just as much as my Hemi did. Turn radius is amazing. No problems! The 3.5 average rating on here is not accurate. Go test drive one for yourself.
-





Vehicle Information
- Ext. color
- White
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 29197894
- VIN
- 1G1FH1R71J0152002
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Seating
- Leather Seats
- Memory Seat
Dealer
CarMax ColumbiaReviews
CarMax Columbia review
Just viewed on the internet hadn't had a chance to visit a faculty or received personal service
2018 Chevrolet Camaro review
I have a 2018 SS a d I love it. With 455 hp and 455 lb ft through a 6 speed manual and quad exhaust, 8" screen, deluxe instruments, full LED/ HID lighting, spoiler, splitter, diffuser, K&N filter, tinted windows, and a Pioneer TS-WX1210A powered sub it rocks inside and out. Great car.
-





Vehicle Information
- Ext. color
- Red
- Int. color
- GRAY
- Drivetrain
- Rear-wheel Drive
- MPG
- 16-26
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 70155517
- VIN
- 1G1FF1R71P0120388
Features
- Convenience
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
Dealer
CarMax ChattanoogaReviews
CarMax Chattanooga review
I originally bought the Car Max warranty when I made my purchase 3 years ago. The $250 deductible was hard to swallow but it was there when I needed it. Thank you Zach for great customer care. He stood behind the warranty and gave us a loaner while our car was serviced.
2023 Chevrolet Camaro review
2023 Chevrolet Camaro ZL1 Convertible It doesn't get any better than this in a Camaro. Absolute cream of the crop car. ZL1 comes with évery creature comfort you'll ever desire other then it driving itself & that would take all the fun away. Complete comfort, endless source of power & everything that brings happiness to your eyes 👀. I paid $80000.⁰⁰ & have zero regrets, best & happiest investment I made, cause I'll have this for the next twenty plus years.
About Chevrolet
What is the cheapest Chevrolet vehicle available?
The Chevrolet Sonic is the cheapest available vehicle by average Cars.com listing price in Chevrolet's lineup, with an average listing price of $7,951.
Which Chevrolet vehicle has the best MPG?
The Chevrolet Malibu Hybrid can reach up to 49 MPG city and 43 MPG highway for a combined rating of 46 MPG. The Chevrolet Spark with traditional internal combustion engine offers up to 31 MPG city and 39 MPG highway for a combined rating of 34 MPG.
These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.
Which Chevrolet vehicle has the longest range?
The electric Chevrolet Silverado EV can travel up to 492 miles on a single charge depending on electric motor and battery options. The plug-in hybrid Chevrolet Volt can travel up to 53 electric-only miles before the gas engine kicks on.
EPA-estimated range is the distance, or predicted distance, a new plug-in vehicle will travel on electric power before its battery charge is exhausted. Actual range will vary depending on model year, driving conditions, driving habits, elevation changes, weather, accessory usage (lights, climate control), vehicle condition and other factors.
Which Chevrolet vehicle has the most deals?
The Chevrolet Silverado 1500 has the most available deals on Cars.com with 8261 great deals out of 28446 listings starting at $1,636.
Where can I find the most Chevrolet deals?
The most Chevrolet deals can be found near Stonecrest, GA with 454 great deals out of 1843 listings starting at $3,000.
Used Chevrolet by city
-
Used Chevrolet in Lakeview Estates, GA
401 Great Deals out of 1557 listings starting at $3,000
-
Used Chevrolet in Stonecrest, GA
454 Great Deals out of 1843 listings starting at $3,000