Skip to main content
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Listings
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Filters
  • Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300

    $34,493

    $1K
    30,304 mi.
    Est. $629/mo

    Mercedes-Benz of Fort Lauderdale

    4.1
    Fort Lauderdale, FL (15 mi)
    Check Availability

  • White 2025 Mercedes-Benz C-Class C 300White 2025 Mercedes-Benz C-Class C 300White 2025 Mercedes-Benz C-Class C 300White 2025 Mercedes-Benz C-Class C 300White 2025 Mercedes-Benz C-Class C 300White 2025 Mercedes-Benz C-Class C 300

    $32,710

    $9.1K
    33,181 mi.
    Est. $597/mo

    Miami Lakes Automall - Chevrolet Kia Dodge Chrysler Jeep Ram Mitsubishi

    3.5
    Hialeah, FL (8 mi)
    Check Availability

  • Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300Obsidian Black Metallic 2023 Mercedes-Benz C-Class C 300

    $28,299

    $500
    51,510 mi.
    Est. $516/mo

    Carvix of Miami

    5.0
    Miami, FL (6 mi)
    Check Availability

  • Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300Palladium Silver Metallic 2016 Mercedes-Benz C-Class C 300

    $14,659

    $260
    61,505 mi.
    Est. $267/mo

    Mercedes-Benz of Coconut Creek

    4.3
    Coral Springs, FL (27 mi)
    Check Availability
  • Black 2018 Mercedes-Benz C-Class C 300Black 2018 Mercedes-Benz C-Class C 300Black 2018 Mercedes-Benz C-Class C 300Black 2018 Mercedes-Benz C-Class C 300Black 2018 Mercedes-Benz C-Class C 300Black 2018 Mercedes-Benz C-Class C 300

    $13,793

    97,693 mi.
    Est. $252/mo

    Mercedes-Benz of Fort Lauderdale

    4.1
    Fort Lauderdale, FL (15 mi)
    Check Availability
  • White 2017 Mercedes-Benz C-Class C 300White 2017 Mercedes-Benz C-Class C 300White 2017 Mercedes-Benz C-Class C 300White 2017 Mercedes-Benz C-Class C 300White 2017 Mercedes-Benz C-Class C 300White 2017 Mercedes-Benz C-Class C 300

    $13,615

    $200
    100,276 mi.
    Est. $248/mo

    AutoNation Chrysler Dodge Jeep Ram Pembroke Pines

    4.3
    Pembroke Pines, FL (13 mi)
    Check Availability
  • Mojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATICMojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATICMojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATICMojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATICMojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATICMojave Silver Metallic 2023 Mercedes-Benz C-Class C 300 4MATIC

    $32,737

    $1.7K
    24,522 mi.
    Est. $597/mo

    Mercedes-Benz of Miami

    4.4
    Miami, FL (4 mi)
    Check Availability
  • Polar White 2019 Mercedes-Benz C-Class C 300Polar White 2019 Mercedes-Benz C-Class C 300Polar White 2019 Mercedes-Benz C-Class C 300Polar White 2019 Mercedes-Benz C-Class C 300Polar White 2019 Mercedes-Benz C-Class C 300Polar White 2019 Mercedes-Benz C-Class C 300

    $22,555

    47,080 mi.
    Est. $411/mo

    AutoNation Chevrolet Pembroke Pines

    4.3
    Pembroke Pines, FL (10 mi)
    Check Availability
  • Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300Graphite Gray Metallic 2022 Mercedes-Benz C-Class C 300

    $24,299

    $1K
    69,004 mi.
    Est. $443/mo

    Carvix of Miami

    5.0
    Miami, FL (6 mi)
    Check Availability

  • Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300

    $15,686

    $1.3K
    79,662 mi.
    Est. $286/mo

    AutoNation Ford Miami

    4.8
    Hialeah, FL (8 mi)
    Check Availability
  • Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300

    $17,855

    36,699 mi.
    Est. $326/mo

    Mercedes-Benz of Pembroke Pines

    4.4
    Pembroke Pines, FL (13 mi)
    Check Availability
  • Polar White 2023 Mercedes-Benz C-Class C 300Polar White 2023 Mercedes-Benz C-Class C 300Polar White 2023 Mercedes-Benz C-Class C 300Polar White 2023 Mercedes-Benz C-Class C 300Polar White 2023 Mercedes-Benz C-Class C 300Polar White 2023 Mercedes-Benz C-Class C 300

    $30,250

    $1.2K
    40,343 mi.
    Est. $552/mo

    BMW/MINI of South Miami

    4.9
    Miami, FL (22 mi)
    Check Availability
  • Graphite Grey Metallic 2021 Mercedes-Benz C-Class CabrioletGraphite Grey Metallic 2021 Mercedes-Benz C-Class CabrioletGraphite Grey Metallic 2021 Mercedes-Benz C-Class CabrioletGraphite Grey Metallic 2021 Mercedes-Benz C-Class CabrioletGraphite Grey Metallic 2021 Mercedes-Benz C-Class CabrioletGraphite Grey Metallic 2021 Mercedes-Benz C-Class Cabriolet

    $27,496

    $751
    58,930 mi.
    Est. $502/mo

    Kendall Hyundai

    3.9
    Miami, FL (22 mi)
    Check Availability
  • Polar White 2018 Mercedes-Benz C-Class C 300Polar White 2018 Mercedes-Benz C-Class C 300Polar White 2018 Mercedes-Benz C-Class C 300Polar White 2018 Mercedes-Benz C-Class C 300Polar White 2018 Mercedes-Benz C-Class C 300Polar White 2018 Mercedes-Benz C-Class C 300

    $13,646

    $784
    88,598 mi.
    Est. $249/mo

    Mercedes-Benz of Pompano

    3.5
    Pompano Beach, FL (26 mi)
    Check Availability
  • Lunar 2022 Mercedes-Benz C-Class C 300 4MATICLunar 2022 Mercedes-Benz C-Class C 300 4MATICLunar 2022 Mercedes-Benz C-Class C 300 4MATICLunar 2022 Mercedes-Benz C-Class C 300 4MATICLunar 2022 Mercedes-Benz C-Class C 300 4MATICLunar 2022 Mercedes-Benz C-Class C 300 4MATIC

    $32,990

    15,012 mi.
    Est. $602/mo

    Bomnin Chrysler Dodge Jeep Ram

    4.8
    Miami, FL (14 mi)
    Check Availability

  • Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300

    $27,074

    $200
    42,409 mi.
    Est. $494/mo

    Mercedes-Benz of Coconut Creek

    4.3
    Coral Springs, FL (27 mi)
    Check Availability
  • Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300Polar White 2020 Mercedes-Benz C-Class C 300

    $20,908

    $1K
    41,420 mi.
    Est. $381/mo

    Mercedes-Benz of Fort Lauderdale

    4.1
    Fort Lauderdale, FL (15 mi)
    Check Availability
  • Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300Black 2024 Mercedes-Benz C-Class C 300

    $35,589

    $400
    29,278 mi.
    Est. $649/mo

    Mercedes-Benz of Pembroke Pines

    4.4
    Pembroke Pines, FL (13 mi)
    Check Availability
  • Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300Black 2017 Mercedes-Benz C-Class C 300

    $10,449

    80,778 mi.
    Est. $191/mo

    Aventura Chrysler Jeep Dodge Ram

    4.3
    North Miami Beach, FL (3 mi)
    Check Availability
  • Citrus 2023 Mercedes-Benz C-Class C 300Citrus 2023 Mercedes-Benz C-Class C 300Citrus 2023 Mercedes-Benz C-Class C 300Citrus 2023 Mercedes-Benz C-Class C 300Citrus 2023 Mercedes-Benz C-Class C 300Citrus 2023 Mercedes-Benz C-Class C 300

    $47,769

    $468
    14,245 mi.
    Est. $871/mo

    Mercedes-Benz of Cutler Bay

    4.8
    Cutler Bay, FL (25 mi)
    Check Availability
  • Black 2025 Mercedes-Benz C-Class C 300 4MATICBlack 2025 Mercedes-Benz C-Class C 300 4MATICBlack 2025 Mercedes-Benz C-Class C 300 4MATICBlack 2025 Mercedes-Benz C-Class C 300 4MATICBlack 2025 Mercedes-Benz C-Class C 300 4MATICBlack 2025 Mercedes-Benz C-Class C 300 4MATIC

    $32,476

    $731
    21,876 mi.
    Est. $592/mo

    Aventura Chrysler Jeep Dodge Ram

    4.3
    North Miami Beach, FL (3 mi)
    Check Availability

  • White 2023 Mercedes-Benz C-Class C 300White 2023 Mercedes-Benz C-Class C 300White 2023 Mercedes-Benz C-Class C 300White 2023 Mercedes-Benz C-Class C 300White 2023 Mercedes-Benz C-Class C 300White 2023 Mercedes-Benz C-Class C 300

    $32,369

    $200
    30,587 mi.
    Est. $590/mo

    Potamkin Hyundai

    4.9
    Hialeah, FL (8 mi)
    Check Availability
  • Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300Selenite Grey Metallic 2020 Mercedes-Benz C-Class C 300

    $20,485

    $500
    63,491 mi.
    Est. $374/mo

    North Miami Mitsubishi

    4.5
    Miami, FL (5 mi)
    Check Availability
  • Polar White 2022 Mercedes-Benz C-Class C 300 4MATICPolar White 2022 Mercedes-Benz C-Class C 300 4MATICPolar White 2022 Mercedes-Benz C-Class C 300 4MATIC

    $27,217

    $1.2K
    33,936 mi.
    Est. $497/mo

    Arrigo Dodge Chrysler Jeep Ram at Sawgrass

    4.5
    Tamarac, FL (23 mi)
    Check Availability
  • Polar White 2016 Mercedes-Benz C-Class C 300 4MATIC LuxuryPolar White 2016 Mercedes-Benz C-Class C 300 4MATIC LuxuryPolar White 2016 Mercedes-Benz C-Class C 300 4MATIC LuxuryPolar White 2016 Mercedes-Benz C-Class C 300 4MATIC LuxuryPolar White 2016 Mercedes-Benz C-Class C 300 4MATIC LuxuryPolar White 2016 Mercedes-Benz C-Class C 300 4MATIC Luxury

    $17,499

    $500
    39,157 mi.
    Est. $319/mo

    Carvix of Margate

    5.0
    Margate, FL (26 mi)
    Check Availability
  • Black 2025 Mercedes-Benz C-Class C 300Black 2025 Mercedes-Benz C-Class C 300Black 2025 Mercedes-Benz C-Class C 300Black 2025 Mercedes-Benz C-Class C 300Black 2025 Mercedes-Benz C-Class C 300Black 2025 Mercedes-Benz C-Class C 300

    $34,002

    31,761 mi.
    Est. $620/mo

    Palmetto57 Nissan

    4.8
    Miami Gardens, FL (8 mi)
    Check Availability
  • Blue 2024 Mercedes-Benz C-Class C 300Blue 2024 Mercedes-Benz C-Class C 300Blue 2024 Mercedes-Benz C-Class C 300Blue 2024 Mercedes-Benz C-Class C 300Blue 2024 Mercedes-Benz C-Class C 300Blue 2024 Mercedes-Benz C-Class C 300

    $27,988

    $500
    51,793 mi.
    Est. $511/mo

    Bomnin Chevrolet West Kendall

    4.9
    Miami, FL (23 mi)
    Check Availability

  • Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300Selenite Gray Metallic 2024 Mercedes-Benz C-Class C 300

    $36,943

    $451
    13,923 mi.
    Est. $674/mo

    Mercedes-Benz of Coral Gables

    4.7
    Coral Gables, FL (12 mi)
    Check Availability
  • Polar White 2023 Mercedes-Benz C-Class SedanPolar White 2023 Mercedes-Benz C-Class SedanPolar White 2023 Mercedes-Benz C-Class SedanPolar White 2023 Mercedes-Benz C-Class SedanPolar White 2023 Mercedes-Benz C-Class SedanPolar White 2023 Mercedes-Benz C-Class Sedan

    $26,988

    41,411 mi.
    Est. $492/mo

    Car Factory Outlet Miami

    4.1
    Miami, FL (10 mi)
    Check Availability
  • designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300designo Cardinal Red Metallic 2018 Mercedes-Benz C-Class C 300

    $16,985

    45,786 mi.
    Est. $310/mo

    Lorenzo Nissan Ft Lauderdale

    4.6
    Fort Lauderdale, FL (16 mi)
    Check Availability
  • Mars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2DMars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2DMars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2DMars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2DMars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2DMars Red 2012 Mercedes-Benz C-Class C 63 AMG Coupe 2D

    $42,995

    67,920 mi.
    Est. $784/mo

    Premier Auto Lounge

    $415 delivery from Pinellas Park, FL (208 mi)
    Check Availability
  • White 2022 Mercedes-Benz C-ClassWhite 2022 Mercedes-Benz C-ClassWhite 2022 Mercedes-Benz C-ClassWhite 2022 Mercedes-Benz C-ClassWhite 2022 Mercedes-Benz C-ClassWhite 2022 Mercedes-Benz C-Class

    $31,998

    31,764 mi.
    Est. $584/mo

    CarMax Wilmington

    4.7
    $649 delivery to Miami Lakes, FL (8 mi)
    Check Availability

Mercedes-Benz C-Class prices by year

Model year Average price Deals
2027 Mercedes-Benz C-Class $57,627
2026 Mercedes-Benz C-Class $55,472 16 Great deals
2025 Mercedes-Benz C-Class $31,166 5 Good deals
2024 Mercedes-Benz C-Class $35,063 7 Great deals
2023 Mercedes-Benz C-Class $31,418 8 Great deals
2021 Mercedes-Benz C-Class $26,171 5 Good deals
2020 Mercedes-Benz C-Class $30,493 4 Good deals
2019 Mercedes-Benz C-Class $22,063 8 Great deals
2018 Mercedes-Benz C-Class $16,033 8 Great deals

About the Mercedes-Benz C-Class

FAQs

How much does the Mercedes-Benz C-Class cost?

The Mercedes-Benz C-Class price depends on several factors, including the trim level, optional features, mileage, vehicle history and location. The nationwide average price for the C-Class is $25,068, with pricing starting at $1,999.

What is the MPG of the Mercedes-Benz C-Class?

The hybrid Mercedes-Benz C-Class can reach up to 26 MPG city and 36 MPG highway for a combined rating of 30 MPG. The Mercedes-Benz C-Class with traditional internal combustion engine offers up to 25 MPG city and 34 MPG highway for a combined rating of 28 MPG.

These figures are based on EPA mileage ratings and are for comparison purposes only. The actual mileage will vary depending on the selected vehicle model year, trim, driving conditions, driving habits, vehicle maintenance, and other factors.

What are some similar vehicles and competitors of the Mercedes-Benz C-Class?

The Mercedes-Benz C-Class compares to and/or competes against the following vehicles:


What trim levels are available for the Mercedes-Benz C-Class?

The Mercedes-Benz C-Class is available in the following trim levels:

What model years are available for the Mercedes-Benz C-Class?

Available model years for Mercedes-Benz C-Class inventory range from 2003 to 2027.

Used Mercedes-Benz C-Class by price

Similar Cars

Used Mercedes-Benz C-Class by city

Mercedes-Benz C-Class by trim

Used Mercedes-Benz C-Class by body style