Skip to main content

Contact seller

Contact seller

By clicking here, you authorize Cars.com and its sellers/partners to contact you by text/calls which may include marketing and be by autodialer. Calls may be prerecorded. You also agree to our Privacy Notice. Consent is not required to purchase goods/services.

We value your privacy. Cars.com Privacy Notice

Customize your budget

Est. max vehicle price based on your desired monthly budget (...% APR*. and ...% sales tax)
$...*
See matching cars

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

About your privacy: Cars.com is asking for your ZIP and credit rating because it helps us to make an educated guess at your sales tax and loan interest. These two factors can greatly change your monthly payment.

Used mid-size SUVs for sale near Demarest, NJ

Filters 4 Year Price & payment Make Mileage Body style Ext. color All filters
8,130 matches 30 miles from 07627
Be the first to know!

Save your search and get notified when new inventory arrives.

Prequalify now

It only takes a few minutes and won't affect your credit.

Get Prequalified
Est. $400 /mo*
Down Payment
$0
Net trade-in value
$0
Months
72
APR
7.0%
Sales tax
0.0%

Vehicle information

Ext. color: Black Sapphire Metallic
Int. color: Coffee
Drivetrain: All-wheel Drive
MPG: 21-25
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: U44792
VIN: 5UXCR6C04P9P54590

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Rallye BMW review

Excellent Service

During my recent service visit, my experience was... Excellent! Chris and Carol are a tremendously skilled team. I hope the owners of Rallye are giving these two all the resources they need and request to keep the A customer service experience flowing! Thank you!

2023 BMW X5 xDrive40i review

Very comfortable

Very comfortable, with massaging seats plus heated and cooled seats. I’m not sure that it’s a great value because it is expensive. The adaptive cruise control and the lane keeping work very well and almost make it self-driving.

Vehicle information

Ext. color: Black Sapphire Metallic
Int. color: Cognac
Drivetrain: All-wheel Drive
MPG: 21-25
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: U44484
VIN: 5UXCR6C01P9P08862

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Rallye BMW review

Above and beyond 5 star experience with John Botti

5 star experience with Rallye BMW and John Botti! John went above and beyond in every possible way. I reached out to him back in April to inquire about pricing/availability on the X1 and X3. My fiancé and I both wanted to switch to BMW when our Audi and Honda leases ended. John promptly answered my initial email within an hour, and subsequent to that first email, I think we have over 200 emails in total. We went through options and pricing, and then John had me custom build the cars we wanted through BMW's website. The deal he came up with was amazing for the 2 cars. Audi could not even come close to matching what he was giving me (and I was driving a fully loaded Audi Q5). We sent the build codes over to John and then he called me and went through each and every feature on both models to make sure we had everything we needed and nothing we didn't want. We talked through it all and decided on the final builds. John then placed the orders for us. He kept in constant communication with when the cars were scheduled to arrive and notified us once the cars were in. The process was completely seamless. We met with finance manager Charlie when I got my X3 last week, and met with Hassan today when picking up my fiancé's X1. Both managers were professional and easy to work with. We were in and out of their offices in 10 minutes. The genius guys showed us how to use and set up all the features, pair our phones, etc. Everyone is wearing a mask at all times. When you enter the dealership you have to fill out a form regarding COVID and sanitize your hands. They offer a box of "clean" pens. Once you use the pen, you put it in the "used" box after. They are definitely taking all precautions and safety measures. I can't recommend BMW enough. I drove a fully loaded Audi Q5 for 3 years and it truly does not even compare to my fully loaded X3. The X3 handles incredibly better on turns, accelerates better, and the interior is far nicer. The CarPlay connects wirelessly and the use of the entire system is seamless. I honestly didn't know how to use half of the functions on my Q5 for 3 years. The X3 is a superior car and I am so happy we made the switch to BMW! Thank you again John Botti- you are truly the best. Customer service was certainly above and beyond anything we could have expected.

Vehicle information

Ext. color: Phytonic Blue Metallic
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 21-25
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: U44584
VIN: 5UXCR6C09P9P03067

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Rallye BMW review

She always makes me feel special.

I am so so satisified with the patience, professionalism, knowledge Carol Muniz has shown me. She always makes me feel special and she handles my car issues in an expedient manner. Thank you Carol, Thank you

Vehicle information

Ext. color: Alpine White
Int. color: Silverstone
Drivetrain: All-wheel Drive
MPG: 21-25
Fuel type: Gasoline
Transmission: Automatic
Engine: 3L I-6 gasoline direct injection, DOHC, Double VANOS variable va
Stock #: U44609
VIN: 5UXCR6C07P9P47973

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Folding Mirrors, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Rallye BMW review

A pleasure to deal with .

A pleasure to deal with . Walked in saw the exact car in the color and style I wanted in the showroom. Met with my salesman and set up the financing and purchase . No silly games . Everything was straight forward and easy . Went back a few hours later and met with the wonderful finance person and drove home in exactly the BMW I wanted . What more can anyone ask for !!

Vehicle information

Ext. color: Black
Int. color: Black
Drivetrain: All-wheel Drive
MPG: 11-17
Fuel type: Gasoline
Transmission: Automatic
Engine: 6.2L V8 SUPERCHARGED
Stock #: 282460
VIN: 1C4RJFN93LC282460

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, CD Player, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Brooklyn Auto Sales review

Best Purchase Experience Ever

Adam was fantastic, stopped at nothing to get me approved on my loan for a car I've wanted for years. He was very cool, funny, and a pleasure to work with. He exceeded my high expectations. The lot is small and comfortable, and every vehicle on the lot is in absolute pristine condition. I recommend Adam and Brooklyn Auto Sales to anyone who is looking for their dream car!

2020 Jeep Grand Cherokee Trackhawk review

Snow commuter

I've been driving for 43 years now and have owned an array of different vehicles, however I've never been financially fortunate to purchase a luxury model - until now! I was looking for a mid size vehicle that would check many boxes for my snowy Michigan commutes, along with distant travel comfort to and from my cabin and some towing capacity. I have only had this for roughly 1500 miles and wow.. My first impression was luxury. So many base options included in a mid sized and mid priced SUV that pleasantly surprised me. Secondly was the ride quality. Both smooth and quiet and handling. I've read other reviews discussing power inadequacy, but not at all. Plenty of passing and get tup to speed power. Next was the snow. I have Michelin defender tires and wow - what have I been missing? The snow 4x4 duaratac features combined with these tires make this a beast in the snow, slush and rain. It definitely gives me a much more safety reassurance while driving in these conditions. I have not tried the towing yet and have not had any "reliable" issues to report, but we are very fortunate with our pick and one very capable snow commuter.

Vehicle information

Ext. color: White
Int. color: Black
Drivetrain: Four-wheel Drive
MPG: 13-16
Fuel type: Gasoline
Transmission: Automatic
Engine: 4.0L V8 DOHC 24V
Stock #: 492520
VIN: W1NYC7HJXRX492520

Features

Convenience: Adaptive Cruise Control, Heated Seats, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, HomeLink, Premium Sound System, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Brooklyn Auto Sales review

Financed a vehicle

Best dealer shop I’ve dealt with while searching for my car. Gave me zero issues and was very helpful in getting me a finance. Definitely would recommend anyone to purchase from there. Best dealership in Brooklyn.

Vehicle information

Ext. color: Bright White Clearcoat
Int. color: Black
Drivetrain: Four-wheel Drive
MPG: 18-25
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 3.6L V6 24V MPFI DOHC
Stock #: 25B104A
VIN: 1C4RJFBG6HC863980

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Navigation System, Power Liftgate, Remote Start
Entertainment: Bluetooth®, Satellite Radio
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Backup Camera, Blind Spot Monitor, Brake Assist, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Maplecrest Ford Lincoln review

Fast and easy if you know what you’re looking for.

Fast and easy if you know what you’re looking for. It was a good experience.

2017 Jeep Grand Cherokee Limited review

2017 GC Limited 4WD.

2017 GC Limited 4WD. Bought it 3 years ago with 53k miles and now approaching 108k miles. When we bought it, we went to fill the tank for the first time and the gas pump kept shutting off. Turns out there was a known issue with the fuel filler neck assembly. The selling dealer replaced it under warranty and we literally didn't have another issue until 100k miles. At 100k miles took it in for new spark plugs, which is normal maintenance, and found the radiator leaking. The new radiator was not cheap. Have not had any other issues, just replaced the factory original brakes, they made it almost to 108k! We live in Minnesota and this vehicle is an absolute beast in the snow. Put it in snow mode and it is very stable and feels unstoppable. It is a comfortable long distance cruiser and gets decent mileage on the highway, between 24-27mpg. The UConnect system is very easy to use, and the nav is pretty good, but the whole system operates quite slowly. That's a minor complaint I think. Overall we are pretty happy with our WK2.

Vehicle information

Ext. color: Stone Blue Metallic
Int. color: Ebony
Drivetrain: All-wheel Drive
MPG: 21-28
Fuel type: Gasoline
Transmission: 8-Speed Automatic
Engine: 2.0L I4 16V GDI DOHC Turbo
Stock #: LP9153
VIN: 2FMPK4J92NBA90251

Features

Convenience: Heated Seats, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Apple CarPlay®, Bluetooth®, HomeLink, Satellite Radio, USB Port
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, Lane Departure Warning, Stability Control
Seating: Leather Seats

Reviews

Maplecrest Ford Lincoln review

Great overall buying experience!

Great overall buying experience! From beginning to end, our Sales Advisor, Juan Carlos, provided us with excellent service. Being from a large family, we have shopped for many vehicles and this was among the very best and smoothest experiences we ever had. The Maplecrest team were all very professional and helpful. I highly recommend Juan Carlos and this dealership for being fair and straightforward.

2022 Ford Edge SEL review

I purchased the titanium awd edge which came with 20 inch

I purchased the titanium awd edge which came with 20 inch wheels and the ride was a bit rough. I had a 2016 with 18 inch wheels and it was very smooth. I found a set of 18 inch original ford wheels, purchased new tires and now it rides like a dream. It´s quiet, handles well, the interior is a bit dated, but has all the tech and safety I need. I compared the X3 and Q5, but the Edge had a lower price and was loaded. Not a single problem since I bought it, just regular service and one recall that was fixed while I waited at the dealer. I highly recommend it.

Vehicle information

Ext. color: Diamond Black Crystal Pearlcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 19-26
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: E60045A
VIN: 1C4RJHBG8PC510537

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Nielsen Dodge Chrysler Jeep Ram review

Wonderful experience with Ernie!

I had the opportunity of working with Ernie this past weekend. He was professional and transparent from the start. He made the process smooth for me after visiting 3 dealerships prior. We struck a great deal and I drove off my my beautiful new car! Thanks Ernie!!

2023 Jeep Grand Cherokee Limited review

Natural upgrade choice

Runs smooth. Very comfortable. Always loved the Jeep brand so this was a natural upgrade. Love the options too. The adaptive cruise control is amazing.

Vehicle information

Ext. color: Diamond Black Crystal Pearlcoat
Int. color: Steel Gray/Global Black
Drivetrain: Four-wheel Drive
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, intercooled turbo, premi
Stock #: S5675
VIN: 1C4RJYE68N8721692

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Nielsen Dodge Chrysler Jeep Ram review

Excellent Service Department

Without an appointment, I went to the “Express Lane” first thing in morning for a routine oil change and tire rotation. I was told it should take about an hour. The work was completed in under hour and the service writer was pleasant and a pleasure to deal with. This was a much better experience than the ones had with another dealership where I purchased my previous jeep

2022 Jeep Grand Cherokee 4xe Summit review

A legitimately high-end vehicle supported low-end

I have had several hybrid SUVs, Lexus and Mercedes, and this is at the top of the list for me. The hybrid drive is seamless, smooth, and responsive at all speeds. This is the largest hybrid SUV I have owned and yet, it is the most fuel efficient. Amazing mileage around town (50+ mpg) and highway cruising with the little 4-cylinder is very efficient. At highway speeds the transmission keeps the small internal combustion engine from working too hard but when power is needed for passing the combination of torque from the electric power plant along with the turbocharger provides instant responsiveness. Inside, the SUV is roomy and luxurious. The finishes benefit from the Italian roots of the owners to provide a beautiful harmony of design with soft supple leather and rich hardwood trim. The electronics work extremely well from the MacIntosh sound system to the driver assist and lane-keeping features that virtually drive the vehicle for you. The seat air conditioning and built-in massagers make even long driving trips relaxing. Yes, there have been some recalls, expected in an early edition of a new model. The only negative has been in servicing the recalls. Jeep dealers are still basically just old Chrysler/Plymouth/Dodge operations that are not prepared to handle high-end vehicles and the customers they attract. Too few technicians, and poor scheduling between the service writers and the shop. The service waiting areas are designed for truck drivers not owners of luxury automobiles. Stellantis may have upgraded the vehicles to a much higher level but their achilles heel is the dealer service network.

Vehicle information

Ext. color: Glacier White
Int. color: Sandstone
Drivetrain: All-wheel Drive
MPG: 22-27
Fuel type: Gasoline
Transmission: Automatic
Engine: VC-Turbo 2L I-4 port/direct injection, DOHC, variable valve cont
Stock #: S5660
VIN: 5N1AL1ES4SC333746

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Reviews

Nielsen Dodge Chrysler Jeep Ram review

Getting your car serviced is never fun but it's made

Getting your car serviced is never fun but it's made better with someone like Joseph Janzen who is upfront about the time it will take and how much it will cost. He's been great in the past about helping me decide what needs to be done and what can wait, and is just an all-around nice person clearly looking out for whoever comes his way.

Vehicle information

Ext. color: Bright White Clearcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 19-26
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: E60029A
VIN: 1C4RJHBG5PC561414

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Nielsen Dodge Chrysler Jeep Ram review

Arrived 1/2 hour early for scheduled oil change and my

Arrived 1/2 hour early for scheduled oil change and my Caravan was serviced immediately and I was back on the road. Bravo! Most efficient service in many years. Greatly appreciated.

2023 Jeep Grand Cherokee Limited review

Great overall

bought a new 2022 GC Summit. I wanted the hemi, only found it in Summit pkg at the time. Overall love the vehicle interior is as nice as anything out there. Real wood, lots of leather and nice materials overall on interior. Kicking stereo. Had a 2016 Overland with hemi. Wanted one more new hemi before quit making them. Easy 20-22 mpg at 70 mph. Plenty of power, very quiet and smooth. Biggest complaint all the plastic trim on the outside. First time i shut the door sounded like a rattle or something, not as solid as the 2016, when i shut the door it sounded solid. Nothing i could find wrong just pieces seeming to make a noise. Overall love it. Looks great, rides great, descent mileage, and very nice interior. Did i mention messaging seats are real sweet. Also plenty of towing power which i needed. Excellent in the snow as well.

Vehicle information

Ext. color: Baltic Gray Metallic Clearcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 19-26
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: S5687
VIN: 1C4RJHBG2N8529424

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, Satellite Radio, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Roof Rack, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

Nielsen Dodge Chrysler Jeep Ram review

Had work done on my Jeep Grand Cherokee with Nielson.

Had work done on my Jeep Grand Cherokee with Nielson. Professional and polite service. Work was done complete. Special thanks to Michael Andolina for his Professional and courteous service. I will continue to do business at Nielsen

2022 Jeep Grand Cherokee Limited review

My opinion of 2022 Jeep Grand Cherokee

This is my first Jeep I have ever owned. I always liked the looks of the Grand Cherokee. I’m happy with the vehicle. No complaints except it does like to drink gasoline. My previous 4 vehicles were all 8 cylinder full size pickup trucks. The Jeep being a 6 cylinder eats more gas. The Other than that, I’m very happy with my purchase of my 2022 Jeep Grand Cherokee. Good looks, drives well, comfortable and safe.

Vehicle information

Ext. color: Silver Zynith
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 18-25
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: S5690
VIN: 1C4RJKAG2N8525971

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Third Row Seating

Reviews

2022 Jeep Grand Cherokee L Altitude review

Good sturdy SUV

Great car so far. Still learning drivability. Tinted driver’s windows reflect light from dashboard which interferes with side mirror and external view, to the extent that window has to be rolled down to be able to see side mirror.

Vehicle information

Ext. color: Bright White Clearcoat
Int. color: Tupelo/Black
Drivetrain: Four-wheel Drive
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, intercooled turbo, premi
Stock #: E60003A
VIN: 1C4RJYE66P8868323

Features

Convenience: Adaptive Cruise Control, Cooled Seats, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat

Reviews

2023 Jeep Grand Cherokee 4xe Summit Reserve review

Will I be a Jeep convert due to the 4xe? Maybe?!

Two weeks ownership impressions, this Jeep is quite impressive. I've never been a Jeep person. Long time Dodge Charger owner in the sports car world. Cross shopping the Mustang Mach-e, the Grand Cherokee 4xe really got my attention. It's got that "in town" all electric distance, but you have the turbo gas engine for range and flexibility. The interior is not quite oppulent luxury, but it is VERY nice inside. Levels above what typical Jeep interiors and technology have been. It's very well put together with nice materials, and even some nice plastics. The one huge strike is the choice of so much center piano black. This material has to die. UConnect 5 is my absolute favorite. It works extremely well. The TomTom Nav is kinda weak. It only works best when you input the exact address. Combined electric and gas performance is impressive! This big SUV launches off the line when asked to. Electric use is pretty good for a big vehicle, at about 26mi. Which has been perfect for local driving when I'm off the highway. My combined MPG with gas/electric has been 25mpg, on Regular fuel. Which is a huge step up from the old Charger, yet I have all this cargo room. In the recent snow storms, this GC has been a snow BEAST. Very stable, and the stock Bridgestone tires have been acceptable in their snow performance. A few negatives; the dealer helped fixed a squeaky front panel right away. And they updated my UConnect system, where the screen was flashing black. After those fixes, the GC 4xe has been flawless. The engine is a bit noisy at higher rpms, but I don't mind it too much getting to use its performance. I've been Level 1 charging overnight at home, which has been adequate, taking about 14-15hrs for a full charge. That usually gets 2-3 local errand/to highway trips before it runs out. Then I charge again for the next day. When the battery is "dead" there's enough reserve to operate like a Prius hybrid, to help keep fuel efficiency up while in gas mode. Overall very happy! It's a lease to hedge my bets on this new tech, hopefully it keeps going well! I might be a Jeep convert!

Vehicle information

Ext. color: Bright White Clearcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 18-25
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: S5681
VIN: 1C4RJKAG0N8542896

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Third Row Seating

Reviews

2022 Jeep Grand Cherokee L Altitude review

Great family car that also looks amazing!

Great SUV with 3rd row seats and captains chairs in the middle. It drives so smooth for being a larger SUV. Surprisingly it has been great on gas for me. The exterior is so sleek and looks incredibly high end. The interior is true comfort and the Jeep brand has definitely thought of everything. This has been my favorite Jeep by far.

Vehicle information

Ext. color: Silver Zynith Clearcoat
Int. color: Black
Drivetrain: Four-wheel Drive
Fuel type: Gasoline
Transmission: Automatic
Engine: 2L I-4 gasoline direct injection, DOHC, intercooled turbo, premi
Stock #: S5685
VIN: 1C4JJXR60PW646308

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Navigation System, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof, Tow Hooks
Safety: Automatic Emergency Braking, Backup Camera, Brake Assist, LED Headlights, Stability Control

Reviews

2023 Jeep Wrangler 4xe Rubicon review

Approaching 25,000 miles and we haven’t had any issues.

Approaching 25,000 miles and we haven’t had any issues. I actually enjoy choosing whether to run on electric or gas based on what my journey is. If you just put it in hybrid mode, you’re not utilizing the efficiency of the engine. My advice, think about your journey. If I’m jumping on the highway to then head into the city, I run it on gas on the highway then switch to all electric in the city -no point wasting the electric with highway driving! Then I use up the last of my electric when google tells me I’m X miles from home when I still have X miles of electric remaining to use it all up. When we just do local drives less than 25 miles (grocery, day care pick up etc.) we can literally run off electric only for days, even weeks. It just takes thinking about what your journey involves. Crawling traffic for a 5 mile slow down ahead, I’m on gas until I hit that traffic, then switch to electric. We’ve taken this Jeep (Willys) through plenty of winter storms with feet of snow and ice, never needed to use chains with its AWD or 4WD to choose from. Hopefully the great reliability continues.

Vehicle information

Ext. color: Mineral Black
Int. color: Graphite
Drivetrain: All-wheel Drive
MPG: 20-25
Fuel type: Gasoline
Transmission: Automatic
Engine: VQ 3.5L V-6 gasoline direct injection, DOHC, VVEL variable valve
Stock #: S5657
VIN: 5N1DL1ES2RC348446

Features

Convenience: Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rain Sensing Wipers, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Memory Seat, Third Row Seating

Vehicle information

Ext. color: Baltic Gray Metallic Clearcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 18-25
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: S5689
VIN: 1C4RJKAG1P8729065

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Sunroof/Moonroof
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats, Third Row Seating

Reviews

2023 Jeep Grand Cherokee L Altitude review

i recently had a 2023 for explorer it was a good truck

i recently had a 2023 for explorer it was a good truck never a problem but not a comfortable as the jeep grand Cherokee l front seating is amazing no issues at all i did my research and made sure i bought one with the German transmission its a good idea to check that only thing i can say on the down side seam to be a little under powered but i can live with it decent milage 20 around town.

Vehicle information

Ext. color: Bright White Clearcoat
Int. color: Global Black
Drivetrain: Four-wheel Drive
MPG: 19-26
Fuel type: Gasoline
Transmission: Automatic
Engine: Pentastar 3.6L V-6 DOHC, variable valve control, regular unleade
Stock #: S5586
VIN: 1C4RJHAG6RC108777

Features

Convenience: Adaptive Cruise Control, Heated Seats, Heated Steering Wheel, Keyless Entry, Keyless Start, Power Liftgate, Remote Start
Entertainment: Android Auto®, Apple CarPlay®, Bluetooth®, USB Port, WiFi Hotspot
Exterior: Alloy Wheels, Tow Hitch
Safety: Automatic Emergency Braking, Backup Camera, Blind Spot Monitor, Brake Assist, LED Headlights, Lane Departure Warning, Rear Cross Traffic Alert, Stability Control
Seating: Leather Seats

Reviews

2024 Jeep Grand Cherokee Altitude review

Have owned Jeeps for 35 years.

Have owned Jeeps for 35 years. This is the most comfortable ever. Altitude 4x2 L, V6, avg. 19-24 MPG. Tow up to 8,000. 6 passenger with 2 fold downs in back. Paid 34k with 18k miles

*Estimated payments are calculated by Cars.com and are for informational purposes only. We’ve estimated your taxes based on your provided ZIP code. These estimates do not include title, registration fees, lien fees, or any other fees that may be imposed by a governmental agency in connection with the sale and financing of the vehicle. Other taxes may apply. They do not represent a financing offer or a guarantee of credit from the seller. Actual terms vary by lender.

**Your Saved Vehicles list will be shared along with your contact information when you submit a vehicle request to a dealership. To opt out of this sharing, please view your options on Cars.com Privacy Notice.

8,130 matches Clear
Reset
Basics
Price & payment Full Price Monthly
Monthly budget search results are estimated based on a 72-month loan term with $0 down payment, $0 trade-in value, 0.0% sales tax and 7.0% APR. Inputs can be personalized using the calculator.
Financing
Deal rating
Vehicle history
Awards
Style
Body style
Vehicle size
Cab type
Exterior color
Interior color
Performance
Transmission
Drivetrain
Cylinders
Fuel type
EV range
EV charge time
Features
Convenience
Entertainment
Exterior
Safety
Seating
Door count
Seller info
Seller type
Keyword
Update
Show only
[{"applied_filter_criteria":"{\"bodystyle\":[\"suv\"],\"cpo_indicator\":false,\"search_range\":\"30\",\"shippable\":true,\"size_slugs\":[\"mid_size\"],\"sort_field\":\"searchRank1\",\"sort_order\":\"desc\",\"stock_type\":\"used\"}","search_type":"general-inventory-search","sponsored_type_eligible":["inventory_ad"],"vehicle_array":[{"cpo_indicator":false,"vertical_position":1,"badges":[],"trim":"xDrive40i","customer_id":"179175","price":"0","stock_type":"Used","cpo_package":null,"mileage":"19228","exterior_color":"Black Sapphire Metallic","listing_id":"85912e10-361e-4cea-9293-57226dc1d1e5","relevancy_score":null,"year":"2023","canonical_mmt":"BMW:X5:xDrive40i","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"BMW:X5:xDrive40i:2023","dealer_name":"Rallye BMW","cat":"luxurysuv_crossover","interior_color":"Coffee","fuel_type":"Gasoline","dealer_zip":"11590","sponsored":false,"stock_sub":"","vin":"5UXCR6C04P9P54590","photo_count":0,"make":"BMW","msrp":"0","model":"X5","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":true,"vertical_position":2,"badges":["price_drop_in_cents","great_deal","cpo"],"trim":"xDrive40i","customer_id":"179175","price":"48888","stock_type":"Used","cpo_package":"BMW","mileage":"30838","exterior_color":"Black Sapphire Metallic","listing_id":"bb378ef8-ee22-49f5-9f5e-39a731186a32","relevancy_score":null,"year":"2023","canonical_mmt":"BMW:X5:xDrive40i","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"BMW:X5:xDrive40i:2023","dealer_name":"Rallye BMW","cat":"luxurysuv_crossover","interior_color":"Cognac","fuel_type":"Gasoline","dealer_zip":"11590","sponsored":true,"stock_sub":"","vin":"5UXCR6C01P9P08862","photo_count":17,"make":"BMW","msrp":"0","model":"X5","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":true},{"cpo_indicator":true,"vertical_position":3,"badges":["price_drop_in_cents","great_deal","hot_car","cpo"],"trim":"xDrive40i","customer_id":"179175","price":"49888","stock_type":"Used","cpo_package":"BMW","mileage":"35142","exterior_color":"Phytonic Blue Metallic","listing_id":"20744aa2-13b6-4088-b564-8b4cdf58cdef","relevancy_score":null,"year":"2023","canonical_mmt":"BMW:X5:xDrive40i","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"BMW:X5:xDrive40i:2023","dealer_name":"Rallye BMW","cat":"luxurysuv_crossover","interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"11590","sponsored":true,"stock_sub":"","vin":"5UXCR6C09P9P03067","photo_count":17,"make":"BMW","msrp":"0","model":"X5","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":true},{"cpo_indicator":true,"vertical_position":4,"badges":["price_drop_in_cents","good_deal","cpo"],"trim":"xDrive40i","customer_id":"179175","price":"54998","stock_type":"Used","cpo_package":"BMW","mileage":"32476","exterior_color":"Alpine White","listing_id":"3b3e9154-b194-40fb-b3bf-c39969536320","relevancy_score":null,"year":"2023","canonical_mmt":"BMW:X5:xDrive40i","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"BMW:X5:xDrive40i:2023","dealer_name":"Rallye BMW","cat":"luxurysuv_crossover","interior_color":"Silverstone","fuel_type":"Gasoline","dealer_zip":"11590","sponsored":true,"stock_sub":"","vin":"5UXCR6C07P9P47973","photo_count":17,"make":"BMW","msrp":"0","model":"X5","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":true},{"cpo_indicator":false,"vertical_position":5,"badges":[],"trim":"Trackhawk","customer_id":"191250","price":"99999","stock_type":"Used","cpo_package":null,"mileage":"11221","exterior_color":"Black","listing_id":"b204751c-d818-4a60-b5a3-c974068014d2","relevancy_score":null,"year":"2020","canonical_mmt":"Jeep:Grand Cherokee:Trackhawk","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Trackhawk:2020","dealer_name":"Brooklyn Auto Sales","cat":"suv_midsize","interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"10310","sponsored":false,"stock_sub":"","vin":"1C4RJFN93LC282460","photo_count":24,"make":"Jeep","msrp":"0","model":"Grand Cherokee","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":6,"badges":[],"trim":"G63 AMG 4MATIC","customer_id":"191250","price":"184995","stock_type":"Used","cpo_package":null,"mileage":"9735","exterior_color":"White","listing_id":"7979b02a-a230-4aaf-adf2-6c967bc199c9","relevancy_score":null,"year":"2024","canonical_mmt":"Mercedes-Benz:AMG G 63:G63 AMG 4MATIC","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Mercedes-Benz:AMG G 63:G63 AMG 4MATIC:2024","dealer_name":"Brooklyn Auto Sales","cat":"luxurysuv_suv","interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"10310","sponsored":false,"stock_sub":"","vin":"W1NYC7HJXRX492520","photo_count":0,"make":"Mercedes-Benz","msrp":"0","model":"AMG G 63","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":true,"vertical_position":7,"badges":["great_deal","hot_car","cpo"],"trim":"Limited","customer_id":"4559","price":"13998","stock_type":"Used","cpo_package":"Ford Blue Advantage Blue","mileage":"93778","exterior_color":"Bright White Clearcoat","listing_id":"f803c618-d6fb-4fc3-95b5-3935fa752472","relevancy_score":null,"year":"2017","canonical_mmt":"Jeep:Grand Cherokee:Limited","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Limited:2017","dealer_name":"Maplecrest Ford Lincoln","cat":"suv_midsize","interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"07088","sponsored":true,"stock_sub":"","vin":"1C4RJFBG6HC863980","photo_count":29,"make":"Jeep","msrp":null,"model":"Grand Cherokee","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":true},{"cpo_indicator":false,"vertical_position":8,"badges":["good_deal"],"trim":"SEL","customer_id":"4559","price":"28499","stock_type":"Used","cpo_package":null,"mileage":"1926","exterior_color":"Stone Blue Metallic","listing_id":"b462aaa1-5fb4-41b7-9de3-43c6377e38e8","relevancy_score":null,"year":"2022","canonical_mmt":"Ford:Edge:SEL","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Ford:Edge:SEL:2022","dealer_name":"Maplecrest Ford Lincoln","cat":"crossover_midsize","interior_color":"Ebony","fuel_type":"Gasoline","dealer_zip":"07088","sponsored":false,"stock_sub":"","vin":"2FMPK4J92NBA90251","photo_count":9,"make":"Ford","msrp":null,"model":"Edge","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":9,"badges":["price_drop_in_cents","great_deal","2023_award_winner"],"trim":"Limited","customer_id":"208568","price":"34600","stock_type":"Used","cpo_package":null,"mileage":"20083","exterior_color":"Diamond Black Crystal Pearlcoat","listing_id":"77a73c5f-0875-4e73-9cc7-f690646eec30","relevancy_score":null,"year":"2023","canonical_mmt":"Jeep:Grand Cherokee:Limited","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Limited:2023","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJHBG8PC510537","photo_count":19,"make":"Jeep","msrp":"0","model":"Grand Cherokee","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":10,"badges":["price_drop_in_cents","great_deal"],"trim":"Summit","customer_id":"208568","price":"30541","stock_type":"Used","cpo_package":null,"mileage":"39213","exterior_color":"Diamond Black Crystal Pearlcoat","listing_id":"915028a4-426d-4c3b-8f63-3f0d11c8f2db","relevancy_score":null,"year":"2022","canonical_mmt":"Jeep:Grand Cherokee 4xe:Summit","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee 4xe:Summit:2022","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"hybrid_suv","interior_color":"Steel Gray/Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJYE68N8721692","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee 4xe","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":11,"badges":["price_drop_in_cents","good_deal","american_made_index_ranking"],"trim":"Pure","customer_id":"208568","price":"40873","stock_type":"Used","cpo_package":null,"mileage":"7037","exterior_color":"Glacier White","listing_id":"9066711d-5cb4-4a29-a54d-2cc1bd4e4908","relevancy_score":null,"year":"2025","canonical_mmt":"INFINITI:QX60:Pure","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"INFINITI:QX60:Pure:2025","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"luxurysuv_crossover","interior_color":"Sandstone","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"5N1AL1ES4SC333746","photo_count":0,"make":"INFINITI","msrp":"0","model":"QX60","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":12,"badges":["fair_deal","2023_award_winner"],"trim":"Limited","customer_id":"208568","price":"33900","stock_type":"Used","cpo_package":null,"mileage":"25849","exterior_color":"Bright White Clearcoat","listing_id":"02514a70-8139-4134-aac1-7a79c1642144","relevancy_score":null,"year":"2023","canonical_mmt":"Jeep:Grand Cherokee:Limited","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Limited:2023","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJHBG5PC561414","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":13,"badges":["price_drop_in_cents","good_deal"],"trim":"Limited","customer_id":"208568","price":"29999","stock_type":"Used","cpo_package":null,"mileage":"38106","exterior_color":"Baltic Gray Metallic Clearcoat","listing_id":"79b5544e-31d5-4a39-9f35-50d0f7a58ac0","relevancy_score":null,"year":"2022","canonical_mmt":"Jeep:Grand Cherokee:Limited","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Limited:2022","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJHBG2N8529424","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":14,"badges":["price_drop_in_cents","good_deal"],"trim":"Altitude","customer_id":"208568","price":"32085","stock_type":"Used","cpo_package":null,"mileage":"26739","exterior_color":"Silver Zynith","listing_id":"cb3d4d97-6702-45c0-8942-e65b95731c66","relevancy_score":null,"year":"2022","canonical_mmt":"Jeep:Grand Cherokee L:Altitude","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee L:Altitude:2022","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJKAG2N8525971","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee L","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":15,"badges":["price_drop_in_cents","fair_deal"],"trim":"Summit Reserve","customer_id":"208568","price":"40556","stock_type":"Used","cpo_package":null,"mileage":"33120","exterior_color":"Bright White Clearcoat","listing_id":"74ae2da7-31d5-475f-b9ff-a91e58aa4d2d","relevancy_score":null,"year":"2023","canonical_mmt":"Jeep:Grand Cherokee 4xe:Summit Reserve","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee 4xe:Summit Reserve:2023","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"hybrid_suv","interior_color":"Tupelo/Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJYE66P8868323","photo_count":19,"make":"Jeep","msrp":"0","model":"Grand Cherokee 4xe","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":16,"badges":["price_drop_in_cents","good_deal"],"trim":"Altitude","customer_id":"208568","price":"31999","stock_type":"Used","cpo_package":null,"mileage":"27445","exterior_color":"Bright White Clearcoat","listing_id":"256bb3c4-a55b-494d-b22a-6cb3bc34d376","relevancy_score":null,"year":"2022","canonical_mmt":"Jeep:Grand Cherokee L:Altitude","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee L:Altitude:2022","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJKAG0N8542896","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee L","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":17,"badges":["price_drop_in_cents","great_deal"],"trim":"Rubicon","customer_id":"208568","price":"32190","stock_type":"Used","cpo_package":null,"mileage":"38222","exterior_color":"Silver Zynith Clearcoat","listing_id":"c85aa44c-1c4d-4817-b08f-7c61eca8cc05","relevancy_score":null,"year":"2023","canonical_mmt":"Jeep:Wrangler 4xe:Rubicon","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Wrangler 4xe:Rubicon:2023","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"hybrid_suv","interior_color":"Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4JJXR60PW646308","photo_count":0,"make":"Jeep","msrp":"0","model":"Wrangler 4xe","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":18,"badges":["price_drop_in_cents","great_deal","american_made_index_ranking"],"trim":"Pure","customer_id":"208568","price":"39768","stock_type":"Used","cpo_package":null,"mileage":"5595","exterior_color":"Mineral Black","listing_id":"ae072b05-9781-4a06-8093-836db44e9880","relevancy_score":null,"year":"2024","canonical_mmt":"INFINITI:QX60:Pure","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"INFINITI:QX60:Pure:2024","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"luxurysuv_crossover","interior_color":"Graphite","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"5N1DL1ES2RC348446","photo_count":0,"make":"INFINITI","msrp":"0","model":"QX60","seller_type":"dealership","drivetrain":"All-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":19,"badges":["price_drop_in_cents","great_deal"],"trim":"Altitude","customer_id":"208568","price":"31431","stock_type":"Used","cpo_package":null,"mileage":"39614","exterior_color":"Baltic Gray Metallic Clearcoat","listing_id":"aaeff886-74ae-4867-9c0d-8422e0e193da","relevancy_score":null,"year":"2023","canonical_mmt":"Jeep:Grand Cherokee L:Altitude","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee L:Altitude:2023","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJKAG1P8729065","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee L","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false},{"cpo_indicator":false,"vertical_position":20,"badges":["price_drop_in_cents","good_deal","american_made_index_ranking"],"trim":"Altitude","customer_id":"208568","price":"31274","stock_type":"Used","cpo_package":null,"mileage":"37489","exterior_color":"Bright White Clearcoat","listing_id":"ebbc49dc-1b6a-49c7-945d-659aef4eb3ea","relevancy_score":null,"year":"2024","canonical_mmt":"Jeep:Grand Cherokee:Altitude","bodystyle":"SUV","sponsored_type":"standard","canonical_mmty":"Jeep:Grand Cherokee:Altitude:2024","dealer_name":"Nielsen Dodge Chrysler Jeep Ram","cat":"suv_midsize","interior_color":"Global Black","fuel_type":"Gasoline","dealer_zip":"07936","sponsored":false,"stock_sub":"","vin":"1C4RJHAG6RC108777","photo_count":0,"make":"Jeep","msrp":"0","model":"Grand Cherokee","seller_type":"dealership","drivetrain":"Four-wheel Drive","nvi_program":false,"certified_preowned":false}]}]