Used cars for sale near Five Points, OH
-





$15,610
Est. $285/mo Performance Kings Honda
Check Availability Vehicle Information
- Ext. color
- Jet Black Mica
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 27-36
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- HM138722A
- VIN
- 3MZBN1W33HM138722
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Entertainment
- Bluetooth®
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Performance Kings HondaReviews
2017 Mazda Mazda3 review
Bought 2017 Mazda3 Touring 6 Speed Manual new. It now has 180k miles. Fun to drive, great on fuel, great handling (Way better than Toyota Corolla), more than enough technology including Android Auto & Apple Car Play, easy on maintenance, very reliable (More reliable than Toyota in my opinion)
-





Vehicle Information
- Ext. color
- Flame Red Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 19-24
- Fuel type
- Hybrid
- Transmission
- Automatic
- Engine
- Gas/Electric V-6 3.6 L/220
- Stock #
- MN512386
- VIN
- 1C6RRFFG3MN512386
Features
- Convenience
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Bluetooth®
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Lebanon FordReviews
Lebanon Ford review
Our salesman, Josh Davis, was exceptional in doing everything within his scope to get us into our new vehicle. After looking for months, finally found the truck color and features wanted now if it holds up like our 2011 Edge(248K miles and never had major breakdown!) Dealership very clean and accommodating!
2021 RAM 1500 review
I bought the 2021 Ram with an 5.7 Hemi new and I have never experienced any issues with the Ram. 2 recalls witch were taken care of while I waited. I have owned Chevy and Ford pickups in the past 50 years and I have had issues with the Fords and will not buy another Ford truck again. I would buy a Ram again as long as it has a V8 engine.
-





Vehicle Information
- Ext. color
- Maximum Steel Metallic Clearcoat
- Int. color
- Diesel Gray/Black
- Drivetrain
- Four-wheel Drive
- MPG
- 16-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, variable valve control, regular gasolin
- Stock #
- HS813847
- VIN
- 1C6RR7LG4HS813847
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Performance Kings HondaReviews
Performance Kings Honda review
Vehicle brought in for factory recall. Service staff was courteous and work completed promptly. Thanks!
2017 RAM 1500 review
I purchased many different trucks over the years and landed recently on my new to me 2017 Ram Laramie 4x4. It does everything well and tows like a semi 5.7 Hemi with 3.92 rear gear and the 8-speed transmission.
-





Vehicle Information
- Ext. color
- Graphite Grey Metallic
- Int. color
- Off Black
- Drivetrain
- All-wheel Drive
- MPG
- 22-29
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.5L H-4 variable valve control, regular gasoline, engine with 1
- Stock #
- P12441
- VIN
- 4S4BRCCCXC3261446
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Roof Rack
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Brake Assist
- Stability Control
- Seating
- Leather Seats
Dealer
Frontier MotorsReviews
Frontier Motors review
My purchase of the green 2008 Bullitt Mustang was a fantastic experience. Gabe and the team were polite and helpful. I recommend Frontier to anyone who is looking for their next car purchase.
2012 Subaru Outback review
Owned this car since I ordered it new. Limited trim was worth it! At 167,000 miles I have only done routine maintenance. Synthetic Mobil 1 since I got it. Original front brakes, rears replaced only once. Solid, great mpg always. Rated at 22/29 and I routinely exceeed both by 2-3 mpg. Great in snow! CVT has NEVER given me any issues. I’ve towed boats and trailers within the 2700# specified limit without a concern. This car has been a tank and still looks like new. Paint is great, no rust or plastic degradation at all.
-





Vehicle Information
- Ext. color
- Wind Chill Pearl / Midnight Black Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 41-38
- Fuel type
- Hybrid
- Transmission
- Automatic CVT
- Engine
- 2.5L I4 16V PDI DOHC Hybrid
- Stock #
- RU168046
- VIN
- 4T3E6RFV0RU168046
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Power Liftgate
- Entertainment
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Performance ToyotaReviews
Performance Toyota review
Great service, super friendly staff, the service only took a few minutes—highly recommended! Thanks.
2024 Toyota RAV4 Hybrid review
2024 RAV4 Hybrid XSE model is a great choice - interior road noise & front seats that do not glide back enough are my ‘wish I would have paid attention to’ regrets. If passengers are over 6’2” with long legs, they do not fit in the front seat comfortably & many times I feel like an Uber driver with them choosing the back seat when going distances. Hybrids make a lot of noise when backing up which can turn heads - this is normal so don’t be alarmed. Gas mileage is terrific & its sporty exterior is over the top. I do love it & recommend it if not concerned about the cons I have mentioned.
-





Vehicle Information
- Ext. color
- Anvil Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 20-23
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, intercooled turbo, premi
- Stock #
- SW630372
- VIN
- 1C4PJXAN9SW630372
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Kings MazdaReviews
Kings Mazda review
I hate buying cars! It can be such a hassle. Luckily, I had a great experience when I leased my new CX-5 from King Mazda. The service was excellent and the staff was very professional. Thank you Whitney Lambert, Mark Malone and Kris Miller for making things easy. Go to Kings Mazda for a great deal and great service.
2025 Jeep Wrangler review
Incredible vehicle. Especially if you put a manufacturer 3 inch lift on it and aftermarket wheels and tires and running boards. A total beast if you can’t afford the Renegade or if you are too upside down on your trade. If you don’t know the Jeep go get one. It’s life-changing.
-





$33,543
Est. $613/mo Mazda of Dayton
Check Availability Vehicle Information
- Ext. color
- Rhodium White Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 26-30
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic
- Engine
- SKYACTIV-G 2.5L I-4 direct injection, DOHC, variable valve contr
- Stock #
- S0800700
- VIN
- JM3KFBEM4S0800700
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Mazda of DaytonReviews
Mazda of Dayton review
The salesman was knowledgeable and efficient. The building is very nice. The location was convenient.
2025 Mazda CX-5 review
"2025 MAZDA CX-5 TURBO SIGNATURE" FULL Suite of Safety Features/NAPA Leather/NAV/All LED Lights, etc ... Owned Mercedes-Benz vehicles for the past 25 years ... Quality and reliability have DECREASED SUBSTANTIALLY; while the price has INCREASED ASTRONOMICALLY ... Alongside my current Mercedes-Benz GLC Coupe, I purchased this 2025 MAZDA CX-5 Turbo Signature ... For under $45,000, I have a "Gem" that stand far above the MB in reliability, with Safety Features, Power, and Interior Quality EQUAL to the MB, with a price $25,000 LESS!
-





Vehicle Information
- Ext. color
- Modern Steel Metallic
- Int. color
- Gray
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 3.5L V-6 direct injection, DOHC, i-VTEC (w/VTC) variable valve c
- Stock #
- RB008666
- VIN
- 5FNYG1H23RB008666
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Third Row Seating
Dealer
Performance HondaReviews
2024 Honda Pilot review
After almost 180,000 trouble-free miles with our 2015 Pilot and an excellent Honda dealer near by, we really didn’t look hard at anything but another Pilot when it was time for a new car. Our EXL, purchased in March 2024, just turned 20,000 miles. We have had no issues with it, and the trip computer says we have averaged 27.1 mpg over the last 5500 miles. That is about 4.5 mpg better than the 2015. The good: It is extremely roomy and comfortable, even the third-row seats. We are very pleased with the fuel economy for a vehicle of this size. The headlights are the best we’ve had on any vehicle. I really like the rugged looks, especially compared the the previous generation. It’s great on snowy and slippery surfaces. The not-as-good: This is my first vehicle with all the modern safety aids. I find the lane-departure system annoying, especially in construction zones. The first time I backed out of the garage with bikes on a hitch-mounted carrier, the car automatically slammed on the brakes so hard I thought I ran into something. (Pro tip: Use tow mode when hauling bikes.) I don’t use the adaptive cruise control because it starts matching the speed of the vehicle ahead long before I would normally change lanes to pass, even with the system adjusted accordingly. However, I can’t see that future vehicles will have FEWER of these features, so I suppose I will just have to get used to them.
-





$20,380
Est. $373/mo Performance Kings Honda
Check Availability Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Light Frost Beige/Black
- Drivetrain
- Four-wheel Drive
- MPG
- 18-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Pentastar 3.6L V-6 DOHC, variable valve control, regular gasolin
- Stock #
- JC286266
- VIN
- 1C4RJFBG5JC286266
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Performance Kings HondaReviews
2018 Jeep Grand Cherokee review
Because it a great car because the car has 118k miles on it and its only 15,371 dollars and its used and works very well
-





Vehicle Information
- Ext. color
- Ruby Flare Pearl
- Int. color
- Black
- Drivetrain
- Front-wheel Drive
- MPG
- 28-39
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2.5L I-4 port/direct injection, DOHC, variable valve control, re
- Stock #
- JU525992
- VIN
- 4T1B61HK4JU525992
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Performance HondaReviews
Performance Honda review
Katlyn has been my service advisor for many years and I always ask for her when scheduling maintenance. She has always been pleasant, professional, knowledgeable and unfailingly honest. I feel fortunate to having her taking care of my cars.
2018 Toyota Camry review
I have purchased six Camrys. So, when it was time to purchase a new one, I didn't check the features. I was pleasantly surprised by the radar cruise control that maintains your distance from the car in front regardless of the speed setting. It also flashes on your mirrors when a car is in your blind spot. The large screen on the radio is super. There are many other great features you will love!
-





Vehicle Information
- Ext. color
- Magnetic Metallic
- Int. color
- Other
- Drivetrain
- Four-wheel Drive
- Fuel type
- Diesel
- Transmission
- Automatic
- Engine
- Powerstroke 6.7L V-8 direct injection, intercooled turbo, diesel
- Stock #
- B33811
- VIN
- 1FT8W4DT8FEB33811
Features
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Brake Assist
Dealer
Midwest Automotive ConnectionReviews
Midwest Automotive Connection review
Raheem made our car purchase easy and painless. This is the second car we have purchased from MAC in 3 years. The staff is knowledgeable and friendly. I will definitely keep MAC in mind for any future auto purchases!
-





$24,437
Est. $447/mo Kings Chrysler Jeep Dodge RAM
Check Availability Vehicle Information
- Ext. color
- Sarge Green Clearcoat
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 22-29
- Fuel type
- Diesel
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L V6 Turbodiesel
- Stock #
- MW649384
- VIN
- 1C4HJXDM9MW649384
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- Safety
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Kings Chrysler Jeep Dodge RAMReviews
Kings Chrysler Jeep Dodge RAM review
Worked with Leonard Harris and he worked to help get us what we wanted and needed.
2021 Jeep Wrangler review
I purchased my 2021 Wrangler 2 door 80th Anniversary Edition new and I ordered it just the way I wanted it. I couldn't be happier with it I get 27-30 mpg with the 2.0 turbo engine! It's amazing how much power it has . Fantastic Jeep. I have had it for over 5 years with no problems
-
$25,996
New 2026 Mazda Mazda3 2.5 S Select Sport
$30,628
New 2026 Mazda Mazda3 FWD w/Preferred Package
$36,457
New 2026 Mazda CX-5 2.5 S Preferred
$74,470
New 2026 Toyota Tundra Hybrid TRD Pro
$27,631
New 2026 Volkswagen Tiguan S
$57,581
New 2027 Jeep Wrangler Rubicon
$56,168
New 2027 Volkswagen Atlas SEL Premium R-Line
$82,321
New 2027 RAM 2500 Laramie
$74,891
New 2026 GMC Sierra 1500 AT4X
$90,123
New 2027 Chevrolet Tahoe High Country, 4WD
$32,843
New 2026 Honda Accord SE
$61,248
New 2026 Acura MDX Technology Package -





Vehicle Information
- Ext. color
- Ibis White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 20-27
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- GA087502
- VIN
- WA1L2AFP6GA087502
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- DVD Player
- HomeLink
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Performance HondaReviews
Performance Honda review
Amanda was my service advisor. she did a good job getting the services I wanted. She also scheduled my recall issue and the real great thing of the day it cost less than what she quoted.
2016 Audi Q5 review
We love this car. Extremely comfortable to drive, spacious and with it's 4cyl 2L GDI turbo engine is one of the most fuel efficient SUVs on the market. Our Q5 has 170,000 miles, had various age resulted suspension, fuel and water pump repair/maintenance but nothing too abnormal. With continued maintenance it will run another 50k miles so we hope. Next we will go electric with the ID4 or Q4 e-tron
-





Vehicle Information
- Ext. color
- Midnight Brown
- Int. color
- Satin Black
- Drivetrain
- All-wheel Drive
- MPG
- 17-23
- Fuel type
- Gasoline
- Transmission
- 6-Speed Automatic with Sportmatic
- Engine
- 3.3L DOHC
- Stock #
- ST121750
- VIN
- 5XYPHDA53GG121750
Features
- Convenience
- Heated Seats
- Keyless Entry
- Entertainment
- CD Player
- Exterior
- Alloy Wheels
- Roof Rack
- Safety
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Third Row Seating
Dealer
Mark Sweeney Buick GMCReviews
Mark Sweeney Buick GMC review
Great service with good pricing and overall customer satisfaction ??.
2016 Kia Sorento review
I can’t say enough good things about this car!I bought it in 2020 with 45k miles and it was used for two and a half years to get me to school in another town 45-70 miles away, and it kept me safe and performed as good as I could ever ask for. The safety features are the cherry on top and saved me multiple times when merging into other lanes. It has all the bells and whistles- under glow lights, led lights in the front row, Bluetooth connection, and so much more. The car is spacious and has allowed me to drive with multiple people In the car comfortably. The back trunk contains so much space even with the third row seats up. The only issue I have ever had with this vehicle is around 100k miles, the gear shift locked. However, this never affected me and this is something that never needs to be fixed if it doesn’t drive you crazy, and the solution of depressing the gear lock to unlock it while you drive is a simple fix. Overall, this car has been very reliable even at over 110k miles and gives a luxury feel in an affordable vehicle. My favorite car. STOP THE KIA SLANDER!!
-





Vehicle Information
- Ext. color
- Taffeta White
- Int. color
- Gray
- Drivetrain
- Front-wheel Drive
- MPG
- 31-40
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 DOHC, variable valve control, regular gasoline, engine wi
- Stock #
- M11880
- VIN
- 19XFC2F50HE068902
Features
- Convenience
- Keyless Entry
- Entertainment
- Bluetooth®
- USB Port
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Jake Sweeney Mazda Tri-CountyReviews
Jake Sweeney Mazda Tri-County review
Terry provided excellent customer service. He found the vehicle I was looking for and sent me info prior to the appointment. The experience at the dealership was positive and professional. Every employee I encountered was respectful and cordial. Showroom, waiting area, and offices are neat, clean, and comfortable. I'm pleased with my vehicle!
2017 Honda Civic review
Perfect car to last a long time! Runs very well and is very comfortable. The maintenance is easy and the car is spacious! I love it!
-





Vehicle Information
- Ext. color
- Brown
- Int. color
- GRAY
- Drivetrain
- Rear-wheel Drive
- MPG
- 30-39
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 29174893
- VIN
- 19XFB2F81FE048359
Features
- Entertainment
- Bluetooth®
- Exterior
- Alloy Wheels
- Moonroof
- Safety
- Backup Camera
Dealer
CarMax DaytonReviews
CarMax Dayton review
I purchased a vehicle on 2/16/2023. The process was fast and efficient. The staff was extremely helpful and there was zero sales pressure. The CarMax financing offer was as good as I had found independantly.
2015 Honda Civic review
It's a small but not tiny. It sort of roomier in the front but tighter in the rear seats. My model is the 2 doors coupe ex, with stick shift, it came well equipped with all the bells and whistles. Is good on gas and fun to drive. It's not incredible peppy but is fast and strong, and there's a lot of ways you can customize it with. Hondas have always been known for reliability, and this car won't disappoint you, it has 140k miles on it and stills runs like it was new. I got a really good deal from the dealer I bought it from, and they're pretty good overall. I would definitely buy from this place again!
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- RED
- Drivetrain
- Rear-wheel Drive
- MPG
- 22-28
- Fuel type
- Gasoline
- Transmission
- Manual 6
- Engine
- Turbo Gas
- Stock #
- 70299664
- VIN
- JHMFL5G4XSX002760
Features
- Convenience
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
Dealer
CarMax DaytonReviews
2025 Honda Civic review
The Honda civic is an amazing car! Honda is a reliable car that you can trust. I’m really happy with it. I’ll recommend it to anyone.
-





Vehicle Information
- Ext. color
- Blue
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 29-35
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 70191571
- VIN
- SHHFK7H46LU417809
Features
- Convenience
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Lane Departure Warning
Dealer
CarMax DaytonReviews
2020 Honda Civic review
I really like my Honda Civic. It has been very reliable and in the 5 years I have had it there haven't been any major repairs or problems. Since I am short I have gotten a cushion to sit on since the model I got sits lower to the ground. The keyless entry and ignition has worked out very well for me.
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- BLACK
- Drivetrain
- Rear-wheel Drive
- MPG
- 31-39
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Gas
- Stock #
- 28996151
- VIN
- 2HGFE2F56SH589811
Features
- Convenience
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- Exterior
- Alloy Wheels
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
Dealer
CarMax DaytonReviews
2025 Honda Civic review
I traded in a 2017 Honda CR-V Touring because it was going to to cost more to fix the major issues (as a second owner I did not know the CR-V had that many things wrong). I put money down on the Civic Sport that I was going to use for the repairs. I do have to say it's a nice car and I hope it will last longer than I expect. That being said I didn't want to buy another Honda but I did go to a dealership that I trust more than anybody else. I will come back and further my review once I have 5,000 miles on it.
-





Vehicle Information
- Ext. color
- Blue
- Int. color
- Beige
- Drivetrain
- Four-wheel Drive
- MPG
- 16-22
- Fuel type
- Gasoline
- Transmission
- Auto, 10-Spd Sport Mode
- Engine
- 5L V-8 port/direct injection, DOHC, variable valve control, regu
- Stock #
- ZFA58213
- VIN
- 1FTFX1E5XJFA58213
Features
- Convenience
- Heated Seats
- Keyless Entry
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- CD Player
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
Pure DriveReviews
2018 Ford F-150 review
Eight years in my Ford truck. I love it. I looked at GM trucks (Chevy & GMC), still nowhere nears as comfortable as a Ford. Yes I’ve had all the known issues but carried warranties for my truck so transmission has been overhauled. Cam phasers twice (Covered by Ford one and Warranty 2nd time). Just overhauled the front end (bushings, control arm assembly, etc…). Truck still runs like new and rides even better now than when I bought, she is finally broken in and I love my truck. For taller drivers like me, Ford is way to go. Ford has more cabin space than any other truck out there. Ford trucks have the best styling and more towing capacity than anything else in the mkt. Next truck will either be a Raptor or F-250 super duty.
-





Vehicle Information
- Ext. color
- Shadow Black
- Int. color
- Gray
- Drivetrain
- Four-wheel Drive
- MPG
- 18-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Regular Unleaded 2.7 L EcoBoost
- Stock #
- HFC33259
- VIN
- 1FTEW1EP8HFC33259
Features
- Exterior
- Tow Hooks
- Safety
- Brake Assist
- Stability Control
Dealer
Lebanon FordReviews
Lebanon Ford review
The nicest people and great communication. Salesman was very good at what he does. Thanks
2017 Ford F-150 review
I absolutely love this truck. 5.0 Coyote with a 6 speed transmission. Bulletproof combination. Plenty of power, heated, powered, seats and sunroof, and 4 doors. Just an outstanding truck. I’m holding onto this one!!
-





Vehicle Information
- Ext. color
- Ice Silver Metallic
- Int. color
- Slate Black
- Drivetrain
- All-wheel Drive
- MPG
- 25-32
- Fuel type
- Gasoline
- Transmission
- CVT 6-Speed
- Engine
- 2.5L H-4 DOHC, variable valve control, regular gasoline, engine
- Stock #
- GTX340753
- VIN
- 4S4BSANC2H3340753
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
GTX Auto Group INCReviews
GTX Auto Group INC review
Everyone was truly nice and worked hard to make sure I got my car thanks GTX
2017 Subaru Outback review
I went from owning a 2003 Monte Carlo SS to a 2017 Subaru Outback. It was worth every penny. My Subaru is not only reliable, functional, and cute; it also saved me from being injured in a bad crash. This past fall a six point buck hit my car head on and I never saw it coming. It was a fatal crash for the deer, but not for me. As heartbroken as I was to see my car crumpled on the front, I was so glad it wasn't me. It was a repairable fix and made me really appreciate my car.
-





Vehicle Information
- Ext. color
- Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 23-27
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 3.0L I6 24V GDI DOHC Turbo
- Stock #
- B78580R
- VIN
- 5UX23EU04T9082983
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Cincinnati NorthReviews
BMW of Cincinnati North review
BMW North of Cincinnati is a perfect example of excellent customer service. From beginning to end Roger helped us identify, test drive and eventually buy the perfect car for us. He made the process easy, flexible, comprehensive and enjoyable. He gave us honest, candid and well informed advice and did so in a manner that made us feel he had our best intentions in mind. Compare this with the less than satisfactory customer service we received at The BMW Store of Cincinnati, BMW North is ABSOLUTELY the best place to buy your new (or pre owned) dream car. All in all, if you’re looking to buy a new BMW, I highly recommend going to BMW North and asking for Roger! Thank you BMW North!!!🩵💙❤️
2026 BMW X5 review
I got the 2026 X40 with off road package and lots of tech about $83k. I have about 2400 miles on it in two months. I also got tow package and several tech options like advanced driver. Here are my observations thus far. Positive and favorite things: 1. Ride. I clearly remember going on the test drive and really, I did not want to stop. The ride was amazingly smooth and quiet and 2400 miles later I still feel the same way. You will want to go ten miles away when you have to grab that gallon of milk for the family just for the drive, lol. The off road package has air suspension and all 4 tires are same size, not staggered like most BMW’s. It also has steel plate underneath. 2. Towing. Got a boat, camper or trailer? This is your go-to. I pull a 3500lb camper, figure 4000lb loaded. It is downright easy and stable and I ow in the Rockies. Won’t need sway or weight distribution unless you’re closer to your 7200lb limit. You’ll need a special cable to convert BMW power which is pulsed to steady so the trailer rear view camera works. 3. Half hatch. I never knew about this but love it. Keeps stuff in the back and if you tow the hatch will not hit your power Jack on the front of the trailer which happens with full length hatches ( I had two Hondas). It disappeared on the 2027’s, but I think you will love it. Great when you are close to the garage wall too. 4. Interior. Traditional BMW interiors are spartan. They maxed out the X5 and I got the whitish Sensatech and with the other colors and textures it looks and feels up to it’s substantial price. 5. Power. Yeah, that 375hp never leaves you short and the gas mileage is incredible. I find it to be right on the ratings 23/25/27 and 10-14mpg when towing. Shortcomings-negatives: 1. Too much stuff put in the center screen and illogical menus. You have to go two deep to disable the stop-start which everyone I know wants to do. Should have been a separate button. Same with towing stuff in two places and other things. Time to ditch the archaic controller wheels and pads, too. Touch screen only, maybe toggle on steering wheel. 2. You have to get extra and expensive packages to get automatic touchless rear hatch and ventilated seats. Same with touch door handles for lock and unlock. Really? My 2022 HYUNDAI Tucson Limited had all that. 360 camera is in a package too. 3. No spare, even a donut and no room for full sized even with off road package. My off road came with street tires too. Odd. 4. Second row should have adjustable angle seats for more comfort. Overall, it is an amazingly comfortable car and looks amazing in the blue ridge color with chrome trim. I completely love it. If you are considering a new one I would run out the door right now and look at what’s left on the lot as you can probably get a great discount (which they won’t advertise by policy). I got over $10k off and 1% financing 5yrs for huge savings. I loaded up on extended warranty and other add-ons with the savings. The 2027 looks fugly and loses some of the best things on the 2026 like half hatch. When I get some more serious miles I will post another review. Best of luck to my fellow car buyers. Also, if you are budget sensitive this is the last year of this generation so maybe you could pick up one with a few miles to save some bucks or wait a year or two for this one.
-





Vehicle Information
- Ext. color
- Celestial Silver Metallic
- Int. color
- Black/Red
- Drivetrain
- Front-wheel Drive
- MPG
- 22-31
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Dynamic Force 3.5L V-6 port/direct injection, DOHC, VVT-iE/VVT-i
- Stock #
- LU046662
- VIN
- 4T1NZ1AK7LU046662
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
Dealer
Performance HondaReviews
Performance Honda review
Needed to have a damaged wheel cover replaced. Because it's a 2007, OEM part cost was high, but repair was quick with minimal labor cost. Satisfied with the work and customer service.
2020 Toyota Camry review
this is an awesome car. Mine was white withe the black top red leather seats, which is very hard to find. I found one bought it out of state delivered to my home 10 months ago. Almost a month ago some jerk speeding hit the front. Totaled my car. wont ever be another like it. it was a lot of fun to drive, handling was great around turns, very reliable sporty car powerful and fast
-





Vehicle Information
- Ext. color
- FLINT GREY METALLIC
- Int. color
- BLACK LEATHER INTERIOR
- Drivetrain
- All-wheel Drive
- MPG
- 18-24
- Fuel type
- Gasoline
- Transmission
- 5-SPEED AUTOMATIC
- Engine
- 3.5L V-6 DOHC, variable valve control, premium gasoline, engine
- Stock #
- 7X21484A
- VIN
- WDBUF87X87X214848
Features
- Convenience
- Heated Seats
- Keyless Entry
- Navigation System
- Entertainment
- Bluetooth®
- CD Player
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
The Auto LiveryReviews
The Auto Livery review
The Auto Livery staff is friendly and helpful whether it is buying a car, trading one in or getting your car serviced. They are very knowledgeable and provide top notch service. This isn’t like other car dealerships where you feel pressured by their salesman. The Auto Livery is a hassle free, no pressure automobile dealership. That is one thing I look for when I purchase a car. They also offer very fair prices on their cars (my family has purchased multiple cars from them) and also in their service shop. I would recommend them to anyone looking to buy a quality used automobile or simply just get their car serviced here!
2007 Mercedes-Benz E-Class review
Bought 1 owner 76,000 miles 2007 e350 in 2022. Love this car zero issues. I did replace valve seals as recommended after 80,000 it’s been a great car so far and still looks and feels new
-





Vehicle Information
- Ext. color
- Bay Blue
- Int. color
- Silverstone
- Drivetrain
- All-wheel Drive
- Fuel type
- Hybrid
- Transmission
- 8-Speed Automatic
- Engine
- 4.4L V8 32V GDI DOHC Twin Turbo Hybrid
- Stock #
- B77850
- VIN
- WBS83GV04TCW87409
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
BMW of Cincinnati NorthReviews
BMW of Cincinnati North review
Excellent experience with BMW of Cincinnati North. I was buying remote and Matt made the process seamless. He made sure everything was perfect before I traveled to get the vehicle. He was going on vacation when I was to pick up the vehicle so he introduced me to Conner who finalized my transaction and supported me through the final steps and helped me get to know my new vehicle. End to end a solid experience!!!
2026 BMW M5 review
Excellent engineering and styling in the '26 M5 Touring. Excellent handling. Missing are massaging seats and soft close doors for a vehicle in this price range. Wish there were softer suspension options. Beautiful vehicle and the Touring turns heads, as does the sedan
-





Vehicle Information
- Ext. color
- Bright White Clearcoat
- Int. color
- Diesel Gray/Black
- Drivetrain
- Rear-wheel Drive
- MPG
- 18-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- HEMI 5.7L V-8 variable valve control, regular unleaded, engine w
- Stock #
- A61900HA
- VIN
- 1C6RREFT8PN670377
Features
- Convenience
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Bluetooth®
- USB Port
- Exterior
- Alloy Wheels
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
Dealer
McCluskey ChevroletReviews
McCluskey Chevrolet review
This is in my opinion the BEST dealer to work with! Large inventory if thay don't have it thay will get it!!! My salesman jake chapman went above & beyond for me to get the truck I needed A++ everyone was very kind ,very clean dealership!
2023 RAM 1500 review
Bought a 2020 Ram 1500 Limited new and owned for 4 years. The starter went out twice under !00,000 miles so replaced 2 starters, had spark plug miss fire that had to get fixed, had exhaust manifold crack making the clicking sound upon startup, gas mileage got bad around 80,000 miles. I loved my truck but was stuck 2 where truck wouldn't start because the starter Ram uses is too small and not enough power for the start/stop and this size of engine. Also, heated seats are not hot at all. Coming from a F150 where the heated seats were incredibly hot which felt great, Ram not so much.
-





Vehicle Information
- Ext. color
- Super White
- Int. color
- Black/Graphite
- Drivetrain
- Four-wheel Drive
- MPG
- 17-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 4L V-6 DOHC, VVT-i variable valve control, regular unleaded, eng
- Stock #
- 325059
- VIN
- JTEBU5JR1G5325059
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Entertainment
- Bluetooth®
- CD Player
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Wholesale Direct MotorsReviews
Wholesale Direct Motors review
everyone is very nice and makes sure you get what you need!! corey took the time to look into every single car i was interested in lol, with no issue. go get something nice and talk to corey.
2016 Toyota 4Runner review
It's the very last body on frame bullet proof SUV. It's built like a tank is great for all types of driving situations and here in Illinois where the roads are almost as terrible as it's governor it needs to be ready to drive over potholes the size of Pritzkers rear end and handle it. I've had no problems and plan on holding onto it especially now that Toyota has taken a turn for the worse with garbage 4 cylinder turbos.
-





Vehicle Information
- Ext. color
- Supersonic Red
- Int. color
- Black
- Drivetrain
- Four-wheel Drive
- MPG
- 17-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- I-FORCE 3.4L V-6 port/direct injection, DOHC, variable valve con
- Stock #
- AT6329
- VIN
- 5TFKB5DB7RX153345
Features
- Convenience
- Adaptive Cruise Control
- Keyless Entry
- Keyless Start
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Safety
- Automatic Emergency Braking
- Backup Camera
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
Dealer
A+ Auto SalesReviews
A+ Auto Sales review
I’ve never bought a car before and I wasn’t completely sure what I wanted, but when we got to the lot there were several great cars with low mileage at a great price. I was able to find a Ford Fusion that I loved and Alex was even able to have the windows tinted for me to make the car look even cooler than when I bought it. He worked hard to get me financed even though I had limited credit history. I really appreciate everything he did to make this first car buying experience such a great one!
2024 Toyota Tundra review
The truck is designed with the best quality and engineering I've ever experienced with any other truck brand. Beautiful design inside and out. It drives like a charm. The wheels steer like a sedan. I won't buy any other car other than a Tundra in the future.
-





Vehicle Information
- Ext. color
- Oxford White
- Int. color
- Black Onyx
- Drivetrain
- Four-wheel Drive
- MPG
- 17-17
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 2.7L EcoBoost V6
- Stock #
- T260167C
- VIN
- 1FMEE5DP6MLA65236
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Rear Cross Traffic Alert
- Stability Control
Dealer
Kings FordReviews
Kings Ford review
Alec roshek & Seth delavega are great to deal with they really know how to treat people they take their time and walk you through the process of buying a car I personally won't go anywhere else but kings ford
2021 Ford Bronco review
Red 2021 Ford Bronco Sport Big Bend with less than 7,000 miles. I love the over handling and performance. I've done great extensive upgrades. ie....hood spoiler, door side guards, exterior and interior accessories...!
-





Vehicle Information
- Ext. color
- Chili Pepper Red
- Int. color
- Dark Gray W/Black Onyx
- Drivetrain
- Four-wheel Drive
- MPG
- 20-21
- Fuel type
- Gasoline
- Transmission
- 10-Speed Automatic
- Engine
- 2.3L EcoBoost I-4
- Stock #
- T260590A
- VIN
- 1FMDE7BH5RLA22453
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Tow Hooks
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
Dealer
Kings FordReviews
Kings Ford review
Jeremy, was our salesman and was professional and helpful with us and patient. In the end we decided not purchase a new car and decided to buy out our lease. We visited several dealerships in KY/OH and found out that if we were going to make a purchase it would be from Kings Ford and through Jeremy.
2024 Ford Bronco review
My family and I are loving our new bronco. I had the great experience at our ford dealership. Overall our bronco car is amazing and awesome.
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- BURGUNDY
- Drivetrain
- Four-wheel Drive
- MPG
- 15-21
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29084465
- VIN
- WA1VWBF72ND001116
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Greenwood -





$31,986
Est. $585/mo Dan Cummins Chevrolet Buick of Paris
Check Availability Vehicle Information
- Ext. color
- Blizzard Pearl
- Int. color
- Almond
- Drivetrain
- All-wheel Drive
- MPG
- 29-27
- Fuel type
- Hybrid
- Transmission
- Automatic CVT
- Engine
- 3.5L V6 24V PDI DOHC Hybrid
- Stock #
- 66716
- VIN
- 5TDDGRFHXKS060415
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Dan Cummins Chevrolet Buick of ParisReviews
Dan Cummins Chevrolet Buick of Paris review
We had a great experience at Dan Cummins Chevrolet in Paris, KY. Everyone was friendly, and setting up an appointment with our salesman, Lance, was quick and easy. Their selection of vehicles was excellent, and their website made searching for cars simple. After months of comparing prices online, theirs were the best we found anywhere in the state. There was no pressure at any point, and all of our questions were answered clearly and honestly. We highly recommend Dan Cummins Chevrolet in Paris, KY — and Lance especially — to anyone in the market for a new vehicle.
2019 Toyota Highlander Hybrid review
Best most reliable, very comfortable great lines, economical I have ever had. Seating allows one to have a superior view.of traffic in all directions. I used to be a Cadillac owner no more!
Car Dealers in Nearby Cities
- Car Dealers in Springboro, OH
- Car Dealers in Waynesville, OH
- Car Dealers in Centerville, OH
- Car Dealers in Franklin, OH
- Car Dealers in Miamisburg, OH
- Car Dealers in Hunter, OH
- Car Dealers in Carlisle, OH
- Car Dealers in Bellbrook, OH
- Car Dealers in West Carrollton, OH
- Car Dealers in Lebanon, OH
- Car Dealers in Kettering, OH
- Car Dealers in Moraine, OH