Used Audi Q7 45 Premium Plus for sale near me
-





Vehicle Information
- Ext. color
- Black
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 267773
- VIN
- WA1LCBF70RD000570
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Sapaugh GM CountryReviews
Sapaugh GM Country review
Sapaugh Service Dept always goes above and beyond servicing my vehicle. We have purchased several new vehicles from Sapaugh and will continue to do so.
-





Vehicle Information
- Ext. color
- Mythos Black Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- P30486
- VIN
- WA1LCBF7XPD020161
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Alexandria VWReviews
Alexandria VW review
Jamall and Syed were a great help. No issues. I’m happy I went for my car through them.
-





Vehicle Information
- Ext. color
- Blue
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- PM006487
- VIN
- WA1LCBF7XRD006487
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Atlantic City MitsubishiReviews
Atlantic City Mitsubishi review
Price was solid and the Outlander I got had a clean Carfax, one owner. What bugged me a little is that the online listing said it had heated seats and it didnt. They knocked something off for the trouble, which was fair, but double check the features yourself.
-





Vehicle Information
- Ext. color
- Blue
- Int. color
- GRAY
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29278532
- VIN
- WA1LCBF70RD008474
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Santa RosaReviews
CarMax Santa Rosa review
Great service. I would go back and purchase another vehicle. Great finance department. Helped me finance used but new car. Left dealer with vehicle that evening.
-





Vehicle Information
- Ext. color
- Gray
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29282014
- VIN
- WA1LCBF75RD007353
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Colorado SpringsReviews
CarMax Colorado Springs review
Although we did not yet buy from CarMax, we were very impressed with both their helpfulness and and their low-pressure. The salesman seemed more interested in getting us into the right vehicle than he did in making a sale, which was impressive.
-





Vehicle Information
- Ext. color
- White
- Int. color
- BROWN
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Supercharged Gas
- Stock #
- 70188137
- VIN
- WA1LAAF74KD006930
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Gulf FreewayReviews
CarMax Gulf Freeway review
The environment is good, the service is good, too. The service staff introduce the car in detail patiently and warm-heartedly. I am very happy with his service.
2019 Audi Q7 review
In fact, I like the appearance of this car, and it feels quite handsome. It is difficult to buy a larger SUV at this price. It is still relatively rare. I think the pricing is more conscientious first, and the workmanship in the car is also considered. All aspects are also more meticulous, you can feel its delicate workmanship and quality. [Space] The space of this car is quite good, spacious, and it is enough for me to use [Power] Anyway, the speed is quite fast, and it is not difficult to overtake. [Control] The steering wheel of this car is quite easy, [Fuel consumption] The fuel consumption is ok, It is quite low, quite suitable for home use, more energy-saving, and more economical. [Comfort] The comfort in this car [Appearance] The appearance of this car is what I like, the atmosphere, the lights are very nice
-





Vehicle Information
- Ext. color
- Gray
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29185475
- VIN
- WA1LCBF70PD023277
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Costa MesaReviews
CarMax Costa Mesa review
I purchased a used Mercedes-Benz E55 AMG from the Carmax in Costa Mesa, CA about a month ago. I started out by calling the Carmax and reaching a sales agent. She worked with me by setting aside the car so that I could fly down to pick it up. She picked me up from the airport about 15 miles away from their dealership. When I saw the car, I found some minor cosmetic issues with the car and Carmax assured me that they would repair them at my local Carmax in Roseville, CA. I will be writing a review about that Carmax as well. They issued me a form stating repairs to be done at my local dealership. I informed the salesperson that I would be pushing the car a bit and she was fine with it. After the test drive, the car seemed to be in great condition, so we headed in for the paperwork. The appearance inside of the dealership building did not convey a welcoming feeling though. It felt like a warehouse with desks in it. The people within the building were nice and friendly though. The paperwork was pretty quick as I already had a loan check from the credit union. It took about 30 minutes and then I was on my way. Overall, I would say the experience was positive.
-





Vehicle Information
- Ext. color
- Glacier White Metallic
- Int. color
- Okapi Brown
- Drivetrain
- All-wheel Drive
- MPG
- 20-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Intercooled Turbo Premium Gasoline I-4 2.0 L/121
- Stock #
- L21886
- VIN
- WA1LJBF73ND005648
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Luther Used Car CompanyReviews
Luther Used Car Company review
The best sales person Megan Erickson. She is so amazing! I would recommend her to anyone that's looking for a used car. Very honest and very helpful to the customer.
2022 Audi Q7 review
Well built vehicle drives well and is very comfortable. I would recommend this car to anyone that is looking for style and comfort in a car.
-





$43,885
Est. $827/mo Lorenzo Nissan Ft Lauderdale
Check Availability Vehicle Information
- Ext. color
- Mythos Black Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 20-26
- Fuel type
- Gasoline
- Transmission
- quattroA? TiptronicA?
- Engine
- I4
- Stock #
- PN3325
- VIN
- WA1LCBF79SD001769
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Lorenzo Nissan Ft LauderdaleReviews
Lorenzo Nissan Ft Lauderdale review
Best service ever great sales rep I love the experience shopping with Lorenzo Nissan I would definitely recommend 100% and I love my car
-





Vehicle Information
- Ext. color
- Sakhir Gold Metallic
- Int. color
- Okapi Brown
- Drivetrain
- All-wheel Drive
- MPG
- 20-26
- Transmission
- quattroA? TiptronicA?
- Engine
- 3.0L,0 HP,6 cylinder
- Stock #
- 16389
- VIN
- WA1LCBF78SD016389
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Brake Assist
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Global Belle MeadeReviews
Global Belle Meade review
Had a great experience at Global Motorsport with sales associate, Payton, and everyone else I encountered. Definitely will be returning when time to trade vehicles.
-





Vehicle Information
- Ext. color
- Carrara White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- KD040336
- VIN
- WA1LHAF73KD040336
Features
- Convenience
- Heated Seats
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- CD Player
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi FremontReviews
Audi Fremont review
ad a great experience purchasing my new RS 3 from Audi Fremont! Huge thanks to Sharang, Hunter, and Hadi for making the entire process so smooth and enjoyable. I had visited several other Audi dealerships before coming here, and Audi Fremont was easily the best experience. Sharang and Hunter treated me seriously and respectfully from the beginning. I told them that if they could give me a good deal, I was ready to purchase the car that day. They brought Hadi over, worked with me on the numbers, and gave me a great deal on the exact fully loaded RS 3 I wanted. My husband and I are both car enthusiasts, so we really appreciated how knowledgeable everyone was about the car. We had a great time talking cars throughout the process. Excellent customer service, a smooth buying process, and a great deal. I’m extremely happy with my new RS 3 and would definitely come back to Audi Fremont for my next car. Thank you again, Sharang, Hunter, and Hadi!
-





$34,998
Est. $659/mo CarMax Independence Boulevard
Check Availability Vehicle Information
- Ext. color
- Blue
- Int. color
- BROWN
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29269364
- VIN
- WA1LCBF72PD028061
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Independence BoulevardReviews
CarMax Independence Boulevard review
They paid a very fair price for my old car and were very professional about the whole process. It took about 30-45 min.
-
$69,390
New 2026 Audi Q7 45 Premium Plus
$65,514
New 2026 Audi Q7 45 Premium Plus
$67,004
New 2026 Audi Q7 45 Premium Plus
$71,105
New 2026 Audi Q7 45 Premium Plus
$65,835
New 2026 Audi Q7 45 Premium Plus
$67,813
New 2026 Audi Q7 45 Premium Plus
$65,925
New 2026 Audi Q7 45 Premium Plus
$65,893
New 2026 Audi Q7 45 Premium Plus
$69,370
New 2026 Audi Q7 45 Premium Plus
$66,917
New 2026 Audi Q7 45 Premium Plus
$65,162
New 2026 Audi Q7 45 Premium Plus
$64,938
New 2026 Audi Q7 45 Premium Plus -





Vehicle Information
- Ext. color
- Sakhir Gold Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 20-26
- Fuel type
- Gasoline
- Transmission
- quattroA? TiptronicA?
- Engine
- 2.0L I4 16V GDI DOHC Turbo
- Stock #
- A7580L
- VIN
- WA1LCBF7XTD007307
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi Elk GroveReviews
Audi Elk Grove review
TJ, my salesman was very helpful during the process and he was very courteous, patient and professional.
-





Vehicle Information
- Ext. color
- Carrara White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- U23237
- VIN
- WA1LCBF78PD021535
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi ModestoReviews
Audi Modesto review
Great customer service, Wayne from the sales team did a great job and was extremely knowledgeable and professional. This experienced team was fast and efficient and I was in and out in a few hours with my new truck
-





Vehicle Information
- Ext. color
- Samurai Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-23
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- AT035228
- VIN
- WA1LJAF79MD035228
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi Meadowlands -





Vehicle Information
- Ext. color
- Mythos Black Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- J8573
- VIN
- WA1LCBF76PD008573
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Fishers ImportsReviews
Fishers Imports review
was hesitant about buying a new car, but Aiden made the experience easy and enjoyable. He was patient, knowledgeable, and never pushy, answering all my questions and helping me feel confident in my decision. I’m so happy with my new car and highly recommend Aiden to anyone looking to buy! @ Fishers Imports 126th
-





Vehicle Information
- Ext. color
- Samurai Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- AIA030809
- VIN
- WA1LCBF79PD030809
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi IndianapolisReviews
Audi Indianapolis review
Great interaction, detailed explanation and quality service. Made everything from setting the appt, dropping the car, talking through the work to be done and picking up the vehicle so easy (and quick). Steve made it an ideal service experience.
-





Vehicle Information
- Ext. color
- Mythos Black Metallic
- Int. color
- Metro Gray
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 13900
- VIN
- WA1LCBF77PD013443
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Austin e AutosReviews
Austin e Autos review
Isaac Reyes was very responsive with price quote. The price quote has no "hidden fees" like dealer fee, protection package, theft protection, warranty, cleaning fee, etc.! Only $225 doc fee and usual tax+title+registration+inspection fees. This dealer does not negotiate which is a good thing. Their prices were one of the lowest around me. Isaac was prompt to notify us when the vehicle we were interested was sold (while we were waiting for the other quotes)
-





Vehicle Information
- Ext. color
- Samurai Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 7133
- VIN
- WA1LHAF71KD046247
Features
- Convenience
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- CD Player
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Triumph Auto SalesReviews
Triumph Auto Sales review
Quality vehicles. Fair pricing. Staff went above and beyond to help get deal done. Thanks Jamie and staff.
2019 Audi Q7 review
I can’t tell you how much I love this car. Drives like a dream compared to my Cadillac Escalade. Handles well with plenty of acceleration. Nice clean designed exterior and well appointed interior. Only flaw are the drink holders and the lack of remote start since it is German.
-





Vehicle Information
- Ext. color
- Samurai Gray Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- A4218
- VIN
- WA1LJAF75MD035145
Features
- Convenience
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
CarsIndex - HorshamReviews
CarsIndex - Horsham review
Just purchased my first car here today! Jocelyn was great at setting up my appointment and Lenny, Tyler and Mitch were all incredibly friendly and thorough. Would absolutely recommend for first time buyers!
2021 Audi Q7 review
Excellent vehicle overall. It’s quiet, very good ride and handling with technology galore. The seats are very comfortable and especially with the heated massage option and ventilated for warm weather driving. The climate control system is top notch as is the standard B&O sound system which sounds every bit as good as the top line B&O in our A8L. The interior is spacious but storage is limited so gives you a good reason to de clutter! The third seat is not important to us and goes unused but I sure wouldn’t want to try to sit back there! There is plenty of power with the hybrid 6 and the laser matrix design headlights are nothing short of spectacular! The night vision system is especially useful for remote locations for deer, animals, etc. and in urban driving for pedestrians, cyclists, dogs et al. Some niggles include a weird shift pattern, way too many nanny warnings, a confusing setup for different drivers to store their individual preferences and not be able to do things like leave the vehicle running to get out to do something as simple as run back in the house for something you forgot. All in all, a luxurious SUV with great overall performance yet very economical to operate as gas mileage is good and routine maintenance is minimal. We love our Audi’s and the Q7 is a great addition to our garage.
-





Vehicle Information
- Ext. color
- Mythos Black Metallic
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 20-26
- Transmission
- quattroA? TiptronicA?
- Engine
- 3.0L,0 HP,6 cylinder
- Stock #
- D011038
- VIN
- WA1LCBF79SD011038
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Navigation System
- Power Liftgate
- Entertainment
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Brake Assist
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Star Motor CarsReviews
Star Motor Cars review
This is my second time buying a Mercedes from Star Motors Used car dealership. Tony helped me with my first car, and Justin the Used Car Manager helped me with the second one. I purchased the second one today and I am extremely happy. The Used Car Team is extremely kind, and professional. Justin made sure all of my needs were met, and the experience was grand. He always makes me feel like I’m important and my satisfaction matters. Thank you Justin, you are a class act.
2025 Audi Q7 review
Car produced many, Almost daily issues with interruptions in safety features I.E. automatic braking not working, etc, Audi seems to have addressed this now. Comfortable, quiet and powerful car. Small third row, but nice to have. Gas mileage in city 17 mpg, improves to 29 on highway. Expensive to maintain, I’ll probably dump it after warranty is up. Depreciates a lot, so will take that.
-





Vehicle Information
- Ext. color
- Carrara White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 22P04945
- VIN
- WA1LCBF78PD028050
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Rusnak/Westlake AudiReviews
Rusnak/Westlake Audi review
5th Audi from Rusnak and Andrew T . Always great service and attention to detail.
-





Vehicle Information
- Ext. color
- Carrara White
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- A23425
- VIN
- WA1LCBF70PD023425
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Go Luxury Auto GroupReviews
Go Luxury Auto Group review
My mom set an appointment with James to come see a Range Rover HSE. We drove in from Louisiana. I came with her to potentially drive the rental car back. Not only did she leave with her car, I ended up calling my bank to purchase a vehicle as well. The service is unmatched. Top notch service, and an amazing selection of vehicles! I would recommend this team to anyone for their next purchase.
-





Vehicle Information
- Ext. color
- Satellite Silver Metallic
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- FP0853
- VIN
- WA1LCBF78RD004754
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Velocity Auto SalesReviews
Velocity Auto Sales review
We were in the market to purchase 2 vehicles. One we knew exactly what we were wanting and had actually found Velocity by looking for that vehicle. We searched around for a few weeks but kept going back to the vehicle that Velocity had listed due to the lower price, lower mileage and overall value. We finally pulled the trigger yesterday and went in to test drive the vehicle. Instantly fell in love and ended up finding another vehicle on their Draper lot for our second purchase. Between Ty, Cory (American Fork location) and Efrain (Draper location), they made the process extremely painless, got us the cars we wanted at a great deal and worked with us on our trades. We walked out with the payments we wanted, the vehicles we wanted and literally no hassle or pressure from anyone. Nothing makes me want to run the other way then being hounded by a salesman instantly and feeling pressured. We felt none of that here with Velocity. We couldn't have been more pleased with the service and quality we received. Thanks again for the great experience. We will be sending friends and family your way.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- Black
- Drivetrain
- All-wheel Drive
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 gasoline direct injection, DOHC, variable valve control,
- Stock #
- 160938
- VIN
- WA1LCBF7XPD020614
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Stability Control
- Seating
- Leather Seats
- Memory Seat
Dealer
Carvix of OrlandoReviews
Carvix of Orlando review
Juan did a great work, I will remember to anyone 100% , nice dealer very clean
-





Vehicle Information
- Ext. color
- White
- Int. color
- Okapi Brown
- Drivetrain
- All-wheel Drive
- MPG
- 19-23
- Fuel type
- Gasoline
- Transmission
- Automatic, 8-Spd & Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 030340
- VIN
- WA1LJAF70MD030340
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Folding Mirrors
- Power Liftgate
- Remote Start
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- Satellite Radio
- USB Port
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rear Cross Traffic Alert
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarsociatesReviews
Carsociates review
I had a great experience at this dealership! Everyone was friendly, professional, and helpful throughout the entire process. They made everything easy to understand and made sure I felt comfortable with my purchase. I really appreciate the time and effort they put into helping me find the right car. I would definitely recommend this dealership to anyone looking for a vehicle!
-





Vehicle Information
- Ext. color
- Carrara White
- Int. color
- Saiga Beige
- Drivetrain
- All-wheel Drive
- MPG
- 19-23
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- F260815229T1
- VIN
- WA1LJAF7XMD033276
Features
- Convenience
- Adaptive Cruise Control
- Cooled Seats
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Audi LakelandReviews
2021 Audi Q7 review
I really like it. I have the Prestige package. Some disappointments however. When turning from a slow speed or stop there is often a lag or bucking. So I need to be careful especially when pulling into traffic. It is annoying for 85k vehicle. Also had it with my 2018. Figured it would be fixed by now. Common Audi issue I have read. Limited interior storage space. Voice navigation command is iffy so I use Waze. MPG is less than my 18 model. Same 3.0. It gets better in Dynamic mode. Otherwise I love driving it. Style is nice and gets a lot of comments. Interior comfort is fine with a nice sense of control. I think I would buy another one but not if they don't fix the lag. I feel it could be a safety negative. Electronics are abundant. Takes some time to get used to them all. Probably I don't even use them all. I pull out manual off and on and still discovering things after a year. Overall though I really enjoy driving it.
-





Vehicle Information
- Ext. color
- Black
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29329516
- VIN
- WA1LCBF76RD003487
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax MurrietaReviews
CarMax Murrieta review
The response time was really fast, I had received an email back within an hour. I was actually surprised how quick they had contacted me about my inquiry and I would recommend them to a friend
-





Vehicle Information
- Ext. color
- Waitomo Blue Metallic
- Int. color
- Saiga Beige
- Drivetrain
- All-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- 8-Speed Automatic with Tiptronic
- Engine
- 2L I-4 direct injection, DOHC, variable valve control, intercool
- Stock #
- 26AC1368
- VIN
- WA1LCBF71PD027256
Features
- Convenience
- Adaptive Cruise Control
- Heated Seats
- Heated Steering Wheel
- Keyless Entry
- Keyless Start
- Navigation System
- Power Liftgate
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Premium Sound System
- USB Port
- Exterior
- Alloy Wheels
- Roof Rack
- Sunroof/Moonroof
- Safety
- Automatic Emergency Braking
- Backup Camera
- Blind Spot Monitor
- Brake Assist
- LED Headlights
- Lane Departure Warning
- Rain Sensing Wipers
- Stability Control
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
Volkswagen Of FairfieldReviews
Volkswagen Of Fairfield review
The entire transaction was professional and comforting. The client adviser / salesperson “Devin W.” was awesome!!!! Highly recommended!
-





Vehicle Information
- Ext. color
- White
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29278990
- VIN
- WA1LCBF76RD008270
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax FremontReviews
CarMax Fremont review
Look around first so you understand that their prices can't be haggled but it is worth it. I couldn't find a single car within $1K of their price. And the quality of the car was outstanding. Easy. Great kid's corner keeps them occupied too. No pressure sales is a beautiful thing.
-





$32,998
Est. $622/mo CarMax Independence Boulevard
Check Availability Vehicle Information
- Ext. color
- Silver
- Int. color
- BLACK
- Drivetrain
- Four-wheel Drive
- MPG
- 19-25
- Fuel type
- Gasoline
- Transmission
- Automatic
- Engine
- Turbo Gas
- Stock #
- 29270029
- VIN
- WA1LCBF78PD022457
Features
- Convenience
- Heated Steering Wheel
- Navigation System
- Entertainment
- Android Auto®
- Apple CarPlay®
- Bluetooth®
- HomeLink
- Satellite Radio
- WiFi Hotspot
- Exterior
- Alloy Wheels
- Sunroof/Moonroof
- Tow Hitch
- Safety
- Backup Camera
- Blind Spot Monitor
- Lane Departure Warning
- Rain Sensing Wipers
- Seating
- Leather Seats
- Memory Seat
- Third Row Seating
Dealer
CarMax Independence BoulevardReviews
CarMax Independence Boulevard review
I researched and found the low mileage Porsche Macan Turbo in the color and desired options. Only about 6 cars in the Southeast that met the desired specification. Great price- lower than some higher mileage Macan Turbos in the used car market. Fair value on my trade and easy buying experience.