Skip to main content
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Listings
Best match Lowest price Highest price Lowest mileage Highest mileage Nearest location Best deal Newest year Oldest year Newest listed Oldest listed
Skip to Filters
  • Sterling Metallic 2026 GMC Terrain DenaliSterling Metallic 2026 GMC Terrain DenaliSterling Metallic 2026 GMC Terrain DenaliSterling Metallic 2026 GMC Terrain DenaliSterling Metallic 2026 GMC Terrain DenaliSterling Metallic 2026 GMC Terrain Denali

    $39,012

    7,985 mi.
    Est. $733/mo

    Bill Kay Buick GMC

    4.4
    Downers Grove, IL (12 mi)
    Check Availability

  • Summit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain Elevation

    $26,401

    $2.3K
    17,120 mi.
    Est. $496/mo

    Hawk CDJR

    4.5
    Forest Park, IL (4 mi)
    Check Availability

  • Graphite Gray Metallic 2020 GMC Terrain SLEGraphite Gray Metallic 2020 GMC Terrain SLEGraphite Gray Metallic 2020 GMC Terrain SLEGraphite Gray Metallic 2020 GMC Terrain SLEGraphite Gray Metallic 2020 GMC Terrain SLEGraphite Gray Metallic 2020 GMC Terrain SLE

    $16,876

    75,243 mi.
    Est. $317/mo

    Circle Buick GMC

    4.2
    Highland, IN (27 mi)
    Check Availability

  • Ebony Twilight Metallic 2026 GMC Terrain Elevation, AWDEbony Twilight Metallic 2026 GMC Terrain Elevation, AWDEbony Twilight Metallic 2026 GMC Terrain Elevation, AWDEbony Twilight Metallic 2026 GMC Terrain Elevation, AWDEbony Twilight Metallic 2026 GMC Terrain Elevation, AWDEbony Twilight Metallic 2026 GMC Terrain Elevation, AWD

    $28,517

    $254
    12,661 mi.
    Est. $536/mo

    Advantage Chevrolet of Bridgeview

    4.7
    Bridgeview, IL (5 mi)
    Check Availability
  • Marine Metallic 2023 GMC Terrain SLEMarine Metallic 2023 GMC Terrain SLEMarine Metallic 2023 GMC Terrain SLEMarine Metallic 2023 GMC Terrain SLEMarine Metallic 2023 GMC Terrain SLEMarine Metallic 2023 GMC Terrain SLE

    $22,213

    $1K
    29,923 mi.
    Est. $418/mo

    Lombard Toyota

    4.6
    Lombard, IL (12 mi)
    Check Availability
  • Summit White 2023 GMC Terrain SLTSummit White 2023 GMC Terrain SLTSummit White 2023 GMC Terrain SLTSummit White 2023 GMC Terrain SLTSummit White 2023 GMC Terrain SLTSummit White 2023 GMC Terrain SLT

    $25,950

    28,202 mi.
    Est. $488/mo

    Rizza Cadillac Buick GMC

    4.3
    Tinley Park, IL (15 mi)
    Check Availability
  • White Frost Tricoat 2024 GMC Terrain DenaliWhite Frost Tricoat 2024 GMC Terrain DenaliWhite Frost Tricoat 2024 GMC Terrain DenaliWhite Frost Tricoat 2024 GMC Terrain DenaliWhite Frost Tricoat 2024 GMC Terrain DenaliWhite Frost Tricoat 2024 GMC Terrain Denali

    $28,852

    49,358 mi.
    Est. $542/mo

    Currie Motors Chevrolet

    4.5
    Forest Park, IL (4 mi)
    Check Availability
  • Ebony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain Elevation

    $25,790

    $2.4K
    20,696 mi.
    Est. $485/mo

    Zeigler Chrysler Dodge Jeep Ram of Downers Grove

    4.3
    Downers Grove, IL (12 mi)
    Check Availability
  • Volcanic Red Tintcoat 2024 GMC Terrain SLEVolcanic Red Tintcoat 2024 GMC Terrain SLEVolcanic Red Tintcoat 2024 GMC Terrain SLEVolcanic Red Tintcoat 2024 GMC Terrain SLEVolcanic Red Tintcoat 2024 GMC Terrain SLEVolcanic Red Tintcoat 2024 GMC Terrain SLE

    $23,402

    $158
    34,507 mi.
    Est. $440/mo

    Biggers Mazda

    4.8
    Elgin, IL (27 mi)
    Check Availability

  • Ebony Twilight Metallic 2024 GMC Terrain AWD SLEEbony Twilight Metallic 2024 GMC Terrain AWD SLEEbony Twilight Metallic 2024 GMC Terrain AWD SLEEbony Twilight Metallic 2024 GMC Terrain AWD SLEEbony Twilight Metallic 2024 GMC Terrain AWD SLEEbony Twilight Metallic 2024 GMC Terrain AWD SLE

    $20,877

    $1.3K
    53,418 mi.
    Est. $392/mo

    Castle Chevrolet of Villa Park

    4.3
    Villa Park, IL (9 mi)
    Check Availability
  • Sterling Metallic 2024 GMC Terrain DenaliSterling Metallic 2024 GMC Terrain DenaliSterling Metallic 2024 GMC Terrain DenaliSterling Metallic 2024 GMC Terrain DenaliSterling Metallic 2024 GMC Terrain DenaliSterling Metallic 2024 GMC Terrain Denali

    $33,388

    14,914 mi.
    Est. $628/mo

    Arlington Heights Buick GMC

    4.9
    Arlington heights, IL (25 mi)
    Check Availability
  • Sterling Metallic 2025 GMC Terrain AWD ElevationSterling Metallic 2025 GMC Terrain AWD ElevationSterling Metallic 2025 GMC Terrain AWD ElevationSterling Metallic 2025 GMC Terrain AWD ElevationSterling Metallic 2025 GMC Terrain AWD ElevationSterling Metallic 2025 GMC Terrain AWD Elevation

    $25,605

    $649
    53,869 mi.
    Est. $481/mo

    Advantage Chevrolet of Bolingbrook

    4.7
    Bolingbrook, IL (16 mi)
    Check Availability
  • Summit White 2022 GMC Terrain SLTSummit White 2022 GMC Terrain SLTSummit White 2022 GMC Terrain SLTSummit White 2022 GMC Terrain SLTSummit White 2022 GMC Terrain SLTSummit White 2022 GMC Terrain SLT

    $21,271

    36,531 mi.
    Est. $400/mo

    Bill Kay Chevrolet

    4.6
    Lisle, IL (13 mi)
    Check Availability
  • Summit White 2025 GMC Terrain ElevationSummit White 2025 GMC Terrain ElevationSummit White 2025 GMC Terrain ElevationSummit White 2025 GMC Terrain ElevationSummit White 2025 GMC Terrain ElevationSummit White 2025 GMC Terrain Elevation

    $28,072

    $600
    17,814 mi.
    Est. $528/mo

    Phillips Chevrolet of Lansing

    5.0
    Lansing, IL (22 mi)
    Check Availability
  • Rip Tide Blue 2024 GMC Terrain SLERip Tide Blue 2024 GMC Terrain SLERip Tide Blue 2024 GMC Terrain SLERip Tide Blue 2024 GMC Terrain SLERip Tide Blue 2024 GMC Terrain SLERip Tide Blue 2024 GMC Terrain SLE

    $23,826

    24,230 mi.
    Est. $448/mo

    Circle Buick GMC

    4.2
    Highland, IN (27 mi)
    Check Availability

  • Riptide Metallic 2024 GMC Terrain SLTRiptide Metallic 2024 GMC Terrain SLTRiptide Metallic 2024 GMC Terrain SLTRiptide Metallic 2024 GMC Terrain SLTRiptide Metallic 2024 GMC Terrain SLTRiptide Metallic 2024 GMC Terrain SLT

    $22,416

    $201
    61,601 mi.
    Est. $421/mo

    Zeigler Cadillac of Lincolnwood

    4.5
    Lincolnwood, IL (15 mi)
    Check Availability
  • Quicksilver Metallic 2022 GMC Terrain SLEQuicksilver Metallic 2022 GMC Terrain SLEQuicksilver Metallic 2022 GMC Terrain SLEQuicksilver Metallic 2022 GMC Terrain SLEQuicksilver Metallic 2022 GMC Terrain SLEQuicksilver Metallic 2022 GMC Terrain SLE

    $21,807

    31,267 mi.
    Est. $410/mo

    Fair Oaks Ford

    4.7
    Naperville, IL (20 mi)
    Check Availability
  • Volcanic Red 2023 GMC Terrain SLEVolcanic Red 2023 GMC Terrain SLEVolcanic Red 2023 GMC Terrain SLEVolcanic Red 2023 GMC Terrain SLEVolcanic Red 2023 GMC Terrain SLEVolcanic Red 2023 GMC Terrain SLE

    $21,519

    $100
    47,643 mi.
    Est. $404/mo

    Webb Chevy Plainfield

    4.8
    Plainfield, IL (25 mi)
    Check Availability
  • Summit White 2021 GMC Terrain SLESummit White 2021 GMC Terrain SLESummit White 2021 GMC Terrain SLESummit White 2021 GMC Terrain SLESummit White 2021 GMC Terrain SLESummit White 2021 GMC Terrain SLE

    $15,413

    $500
    92,256 mi.
    Est. $290/mo

    Zeigler Chrysler Dodge Jeep Ram of Schaumburg

    4.5
    Schaumburg, IL (22 mi)
    Check Availability
  • Ebony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain ElevationEbony Twilight Metallic 2026 GMC Terrain Elevation

    $29,368

    $1K
    19,776 mi.
    Est. $552/mo

    Bettenhausen Chrysler Dodge Jeep RAM

    4.9
    Tinley Park, IL (15 mi)
    Check Availability
  • Ebony Twilight Metallic 2024 GMC Terrain SLEEbony Twilight Metallic 2024 GMC Terrain SLEEbony Twilight Metallic 2024 GMC Terrain SLEEbony Twilight Metallic 2024 GMC Terrain SLEEbony Twilight Metallic 2024 GMC Terrain SLEEbony Twilight Metallic 2024 GMC Terrain SLE

    $24,812

    $565
    26,016 mi.
    Est. $466/mo

    Arnie Bauer Buick GMC of Matteson

    4.5
    Matteson, IL (22 mi)
    Check Availability

  • Quicksilver Metallic 2020 GMC Terrain DenaliQuicksilver Metallic 2020 GMC Terrain DenaliQuicksilver Metallic 2020 GMC Terrain DenaliQuicksilver Metallic 2020 GMC Terrain DenaliQuicksilver Metallic 2020 GMC Terrain DenaliQuicksilver Metallic 2020 GMC Terrain Denali

    $17,995

    $948
    85,286 mi.
    Est. $338/mo

    Schaumburg Ford

    4.1
    Schaumburg, IL (21 mi)
    Check Availability
  • Summit White 2024 GMC Terrain SLESummit White 2024 GMC Terrain SLESummit White 2024 GMC Terrain SLESummit White 2024 GMC Terrain SLESummit White 2024 GMC Terrain SLESummit White 2024 GMC Terrain SLE

    $22,013

    $100
    50,610 mi.
    Est. $414/mo

    Zeigler Chevrolet

    4.5
    Schaumburg, IL (21 mi)
    Check Availability
  • Summit White 2022 GMC Terrain SLESummit White 2022 GMC Terrain SLESummit White 2022 GMC Terrain SLESummit White 2022 GMC Terrain SLESummit White 2022 GMC Terrain SLESummit White 2022 GMC Terrain SLE

    $17,373

    $1K
    71,955 mi.
    Est. $327/mo

    Rod Baker Ford

    4.7
    Plainfield, IL (25 mi)
    Check Availability
  • Summit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain ElevationSummit White 2026 GMC Terrain Elevation

    $25,200

    37,170 mi.
    Est. $474/mo

    Arlington Nissan

    4.3
    Arlington Heights, IL (25 mi)
    Check Availability
  • White Frost Tricoat 2022 GMC Terrain AWD AT4White Frost Tricoat 2022 GMC Terrain AWD AT4White Frost Tricoat 2022 GMC Terrain AWD AT4White Frost Tricoat 2022 GMC Terrain AWD AT4White Frost Tricoat 2022 GMC Terrain AWD AT4White Frost Tricoat 2022 GMC Terrain AWD AT4

    $18,913

    $1.2K
    101,366 mi.
    Est. $356/mo

    Hawk Ford of St. Charles

    4.7
    St Charles, IL (25 mi)
    Check Availability
  • Sterling Metallic 2024 GMC Terrain SLESterling Metallic 2024 GMC Terrain SLESterling Metallic 2024 GMC Terrain SLESterling Metallic 2024 GMC Terrain SLESterling Metallic 2024 GMC Terrain SLESterling Metallic 2024 GMC Terrain SLE

    $23,128

    $545
    27,464 mi.
    Est. $435/mo

    Marino Chevrolet

    5.0
    Chicago, IL (11 mi)
    Check Availability

  • Ebony Twilight Metallic 2020 GMC Terrain SLEEbony Twilight Metallic 2020 GMC Terrain SLEEbony Twilight Metallic 2020 GMC Terrain SLEEbony Twilight Metallic 2020 GMC Terrain SLEEbony Twilight Metallic 2020 GMC Terrain SLEEbony Twilight Metallic 2020 GMC Terrain SLE

    $20,068

    55,312 mi.
    Est. $377/mo

    Joe Rizza Ford Lincoln

    4.3
    Orland Park, IL (15 mi)
    Check Availability
  • Summit White 2024 GMC Terrain SLTSummit White 2024 GMC Terrain SLTSummit White 2024 GMC Terrain SLTSummit White 2024 GMC Terrain SLTSummit White 2024 GMC Terrain SLTSummit White 2024 GMC Terrain SLT

    $21,949

    51,318 mi.
    Est. $413/mo

    Midway Dodge

    4.3
    Chicago, IL (6 mi)
    Check Availability
  • Ebony Twilight Metallic 2022 GMC Terrain DenaliEbony Twilight Metallic 2022 GMC Terrain DenaliEbony Twilight Metallic 2022 GMC Terrain DenaliEbony Twilight Metallic 2022 GMC Terrain DenaliEbony Twilight Metallic 2022 GMC Terrain DenaliEbony Twilight Metallic 2022 GMC Terrain Denali

    $22,090

    94,792 mi.
    Est. $415/mo

    D'Arcy Mitsubishi

    4.9
    Joliet, IL (27 mi)
    Check Availability
  • White 2023 GMC Terrain SLEWhite 2023 GMC Terrain SLEWhite 2023 GMC Terrain SLEWhite 2023 GMC Terrain SLEWhite 2023 GMC Terrain SLEWhite 2023 GMC Terrain SLE

    $17,998

    101,158 mi.
    Est. $338/mo

    CarMax Kenosha

    4.5
    Free delivery to Hillside, IL (6 mi)
    Check Availability
  • White 2021 GMC Terrain SLEWhite 2021 GMC Terrain SLEWhite 2021 GMC Terrain SLEWhite 2021 GMC Terrain SLEWhite 2021 GMC Terrain SLEWhite 2021 GMC Terrain SLE

    $19,998

    36,052 mi.
    Est. $376/mo

    CarMax Dayton

    4.1
    $249 delivery to Hillside, IL (6 mi)
    Check Availability